ChiefメーカーSL220の使用説明書/サービス説明書
ページ先へ移動 of 20
INSTALLATION INSTRUCTIONS I nstruccion es de in stal ación I nstal lati onsanl eitu ng I nstruções de Insta lação I struzion i di install azione I nstal lati e-i nstr ucti es I nstructi ons d ´insta llat ion This de vic e comp lies wi th part 1 5 of the FCC ru les.
SL2 20 Instal latio n Ins truc tion s 2 DISCLAIMER Mil est one A V Technol ogi es, and its af f iliat ed corporations an d subsi di aries ( coll ect ively , "Mil estone" ), intend t o make thi s man ual ac curate and complete.
Installa tion Ins tru cti ons SL2 20 3 TAB LE OF CONTE NTS DISCLAIMER...... ........ ....... ....... .... ....... ....... .... .... 2 TABLE OF CONTENTS......... ........ ... ........ ....... ... . 3 TOOLS REQUIRED FOR INSTALLATIO N.... .... . 4 PARTS.
Installa tion Ins tru cti ons SL2 20 4 TOOLS REQUIRED FOR INSTALLA TION P AR TS I/M x1 A (1 ) [SL220 Li ft] B (1 ) [SL220 Frame] C ( 4 ) [Ver tical Brac ket] D ( 4 ) [Horizon tal Bracket ] E (4 ) 6-3 .
Installa tion Ins tru cti ons SL2 20 5 LEGEND DIMENSIONS Tighte n F astener Apretar e le mento de f ijaci ón Befest igungst ei l fest ziehen Apertar f ixador Serrar e il f issag gio Bevestigi ng vast.
SL2 20 Instal latio n Ins truc tion s 6 PREP ARING F OR INSTALLA TION Installati on Requirements The SL 220 has been de signed to be mount ed re cessed int o a suspen ded ceiling co nsist ing of 2’ x 2’ c eili ng til es and sec ured by a Wir eVi ce sys tem.
Installa tion Ins tru cti ons SL2 20 7 Securing SL220 Frame to Ceiling Structur e 1. Examine ce iling struct ure (concre te, ste el trus s, or w o od) above SL220 f rame ( B) to ide ntif y fou r suppo rt c able anchor l ocations . Ea ch location sh oul d be a ppro ximately 15° ou tside of s uppor t hol es i n SL220 f rame (B) .
SL2 20 Instal latio n Ins truc tion s 8 Wo od C eiling S tru ct ure WARNING: Anchor s mus t be in sta lled i nto woo d with a minimum thi ckness of 1 -1/2" (38. 1 mm) or greater. 1. Drill a 5/32" diameter x 1 -1/2" deep pilot hole at each marked cab le anchor suppor t l ocatio n.
Installa tion Ins tru cti ons SL2 20 9 WARNING: IMPROPER INSTALLA TION CAN LEAD TO LIFT F ALLING CAUSING SEVERE PERSONAL INJUR Y OR DA MA G E T O EQ UIP ME NT ! It is the in s ta ll ers r esp on si bi.
SL2 20 Instal latio n Ins truc tion s 10 IMPORTANT ! : Selec t power c ord ( W or X) s uitabl e for loca tion. If nei t her of tho se cor ds are su itable for your l oca tion, use a po wer cor d tha t has an attac hment pl ug on one end that meets IEC- 60320 and on the ot her en d is appr opr iate f or use with t he gro unded main out let.
Installa tion Ins tru cti ons SL2 20 11 Figure 14 5. While st ill pull ing th e pr ojecto r cradle a way from the si des of the SL220 , slide fro nt cha nnel s towa rds bac k, of f of bearings and remove pr ojector cr adle from SL2 20. (See Figur e 15) Figure 15 PLACING SL220 INTO CEILING STRUCTURE 1.
SL2 20 Instal latio n Ins truc tion s 12 Replacing Project or Cradle 1. Sli de fr ont c hannels of pr oject or cr adle fo rward ont o the SL2 20 bear ings. (See Fi gure 18) Figure 18 2. Line u p re ar spacer s wi th attach m ent ho les on SL22 0 arms.
Installa tion Ins tru cti ons SL2 20 13 Adjustments 1. Adjus t pro je ctor le ft or right b y looseni ng the w ing nut s on the S L220 cr oss br ack et. (See Fi gure 22) 2. Sli de the SL220 cross b rac ket to t he lef t or ri ght as required. 3. Tight en wi ng nuts .
SL2 20 Instal latio n Ins truc tion s 14 CAUTION: KEEP SL220 OPEN WHILE PROJ ECTOR IS RUNNING OR IN COOLING MODE! Prematur e bul b failure or damag e to elect rical compone nts may occur if l ift cl ose s. Replacing Ceiling Pan 1. Line up smal l pe g on ceili ng pan with hol e in l eg of proj ector cradle.
Installa tion Ins tru cti ons SL2 20 15 Fa ul t Co nd it i on IMPORTANT ! : If t he SL220 cont rol sy ste m sees a fault condi tion it wil l s top t he oper at ion an d a r ed light w ill f la sh on the cont r ol boa rd (vis ible th rou gh the con trol ho using).
SL2 20 Instal latio n Ins truc tion s 16 RS485 Inf ormati on Communi cati on par amete rs as spe ci fied in ANSI T IA/EIA-485- A: Table 2: CO MM AND STRINGS FOR SL-220 • Th e serial c ont rol comman.
Installa tion Ins tru cti ons SL2 20 17 Remote Co ntrol Capabilities The r emote c ontrol has a rang e of 20- 30ft (6-9m ), and is powered by 2 AAA bat te ries tha t are acce ssed from the back of the remot e.
SL2 20 Instal latio n Ins truc tion s 18 Table 4: WIRING TABLE.
Installa tion Ins tru cti ons SL2 20 19.
SL2 20 Instal latio n Ins truc tion s Chief Man uf actur ing , a produ ct s divi sion of Mile sto ne A V Tec hnologi es 8820-002 009 Rev03 201 1 Milest one A V Tec hnologi es, a Ducho ssois Grou p Company www .c hiefmfg.com 08/1 1 USA/In ternati ona l A 8401 E agl e Creek Par kway , Savage , MN 553 78 P 800.
デバイスChief SL220の購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
Chief SL220をまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはChief SL220の技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。Chief SL220の取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。Chief SL220で得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
Chief SL220を既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はChief SL220の不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、Chief SL220に関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちChief SL220デバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。