Emersonメーカー300の使用説明書/サービス説明書
ページ先へ移動 of 20
381333–201 G 50 Hanove r Road, F lorham Park, New J ersey 07932–1591 USA For sales or service call 1 800 800–2726 (A SCO ) www.ascopower .com AS CO PO WER TECH NO LOGI E S CA NA DA PO Box 1238, .
Namepl ate The T rans fer Switch nam epla te incl udes data for each sp ecific A SCO S eries 300 A TS. Use th e A TS only wit hin the limits show n on this namep late. Ca talog Num ber Identif icatio n A typ ica l C ata l og Numbe r i s s hown be lo w wi th i ts elements ex plained .
terminal bl ock TB for engine start and switch posi tion co ntacts Tr a n s f e r Switch Con tr oller power connectio ns power connectio ns membrane control s 800 and 1000 a mp er e siz es i n typ ica.
terminal bl ock TB for engine start and switch posi tion co ntacts Tr a n s f e r Switch Con tr oller power connectio ns power connectio ns membrane control s 1200 amp ere s ize in t ypi cal enclos ur.
SECT ION 1 INST ALLA TION 1 --- 1 Series 300 A utomatic T ransfer Sw itches are fac tory wired an d tested. Instal lation r equires skid r emoval then sec urin g the enc los ure to the s uppor ting foundation.
ter min al b lock f or e ngin e s ta rt a nd auxiliary ci rcuit connections left s id e of transfer switch COMMON FEA TU RE 7 closes to start FEA TU RE 8 open s to star t COMMON FEA TU RE 14B closed o.
INST ALLA TION (cont inued) 1 --- 3 F unctio nal T est The F unctional T est consists of thr ee chec ks: manual operation, v oltage chec ks, and el ectrical operation. NOT ICE Do these checks in the order presented to avoid damaging the auto matic transfer s witch.
INST ALLA TION (cont inued) 1 --- 4 observe these l ights Figure 1–5. St andard contro ls and indicato rs. 2–V o l t a g eC h e c k s First check nameplate on tra nsfer swi tch; rated voltage m u s tb et h es a m ea sn o r m a la n de m e r g e n c yl i n e voltages.
INST ALLA TION (cont inued) 1 --- 5 p r e s st h i sb u t t o n observe these l ights Figure 1–6. Standard contro ls and indic ators. 3 – Electrica l Opera tion Th i s pr oce du re wi ll che ck t he e le ctr ica l o pe rt i on o f t he A utomatic T ransfe r Switch.
Hol d 15 sec .t o start t he engine generator and to transf er the load to emergency . Press to cancel the active exercise period (sto ps engine now or afte r cooldow n) Se e page 5– 1. Hol d 5 sec .t os e t 20 min. engine ex ercise perio d immediately (engine starts) and weekly thereaf ter .
SECT ION 3 TEST ING & SERVIC E 3 --- 1 PREV ENTIV E MAIN TENAN CE F or high rel iabil ity and long l ife for the A TS: Ope rate t he sw itc h at l east o nce a mo nth .P e r f o r m t h i s 4–step Electrical Operat ion T e st (te st with load t ransfer).
TEST ING & SERVIC E (continued) 3 --- 2 MANUAL L OAD TR ANSFER This pr oced ure w ill m anual ly tr ansfer th e load if th e cont ro lle r is d i sco nne ct ed . Do no t manually operate the transfer switch until bot h power so urces are disconnected: open bot h circuit breakers .
SECT ION 4 ADJUST MENTS 4 --- 1 Ti me De l a y Ad j u st m e n t Standard ti me delays are set to customer specificati ons (if none specif ied, st andard factory set tings are used).
ADJUST MENTS (continued) 4 --- 2 NOT ICE Do not make any set ting changes while the contro ller is energized. How to Change a Setti ng 1. Prev ent the transfer switch from operating b y discon- nec ting one s ourc e first, then the o ther, as fol low s: a.
SECTION 5 CONTROL FEA TURES – ENGINE EXER CISERS 5 --- 1 These timer s periodic ally exer cise the em ergenc y engine-g enerator p lant. They can be s et to exercise w ith or withou t load tr ansfer, or they can b e compl etely disab led.
CONTRO L F EATURES (continued) 5 --- 2 Opt ion al Ac ce ssory 11BG – SOURCE A VAILABILITY SIG NAL & P ROGRAMMA BLE EN GINE EX ERCIS ER MOD ULE 2–line display 3 buttons connectio ns for source ava ila bilit y signal co ntacts Figure 5–2.
Fa s t/ Sl o w A d j u st Dayl ight Savi ng Time A dju st Date Time Start T Ime Engine Exerciser Run TIm e CONTRO L F EATURES (continued) 5 --- 3 How to Set Option a l Progra mm ab le En gin e Exe rcis er (p art o f Acc. 11BG m od ule) Haza rdous vol tage ca pabl e of causin g shock, burns, o r death is used in this t ransfer switch.
CONTRO L F EATURES (continued) 5 --- 4 INPHASE M ONITOR FOR M OTOR LOAD TR ANSF ER Inphase monitori ng logic con trols tr ansfer and retransfe r of motor loads, so that inrush current s do not exceed normal starti ng currents. It a voids nuisance tripping of cir cuit breakers and m echanic al damag e to mot or co up li ngs .
CONTRO L F EATURES (continued) 5 --- 5 OPTIONAL STR IP HEA T ER (Accessor y 44) A cc essory 44 Str ip Heater is design ed to keep ambient temp eratures within the A utomatic T ransfer Switc h en closu re a t a ccep ta ble le ve ls. Thi s a cces sor y con si st s of a mounting bra cket with strip heat er, thermosta t, and terminal block.
INDEX Printed in U .S.A. Copy right - - - ASC O Power T echn ologies, L.P . 2011 A accessories, 5–2, 5–5 auxil iary cir cuits , 1–2 B battery , 4–2, 5–1 buttons, push, 3–1 bypass time dela.
デバイスEmerson 300の購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
Emerson 300をまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはEmerson 300の技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。Emerson 300の取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。Emerson 300で得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
Emerson 300を既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はEmerson 300の不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、Emerson 300に関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちEmerson 300デバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。