EnviroメーカーCaraの使用説明書/サービス説明書
ページ先へ移動 of 44
SHERWOOD INDUSTRIES IS AN ENVIRONMENT ALL Y RESPONSIBLE COMP ANY . THIS MANUAL IS PRINTED ON RECYCLED P APER. BY: SHERWOOD INDUSTRIES LTD PLEA SE KEEP THESE INSTRUCTIONS FOR FUTURE REFERENCE 50-1630 C a r a This appliance may be installed in an after - market permanently located, manuf actured (mobile) home, where not prohibited by local codes.
2 FOR SAFE INST ALLA TION AND OPERA TION OF Y OUR “ENVIRO” HEA TER, PLEASE CAREFULL Y READ THE FOLLO WING INFORMA TION: • All ENVIRO gas-red appliances must be installed in accor dance with their instructions. Car efully r ead all the instructions in this manual rst.
T able of Contents 3 Safety Precautions.............................................................................................. ....................2 T able of Contents.............................................................................
4 DIRECT VENT ONLY: This type is identied by the sux DV . This appliance dra ws all of its air for combustion from outside the dwelling, through a specially designed v ent pipe system.
5 Specific a tions WARNING: Operation of this heater when not connected to a properly installed and maintained venting system can result in carbon monoxide (CO) poisoning and possible death. R ATING L ABEL L OCATION : The Rating Label is located on the inside surf ace of the pedestal control door .
6 Oper a ting Instructions For Your Safety, Read Safety Precautions And Lighting Instructions Before Operating. WARNING: IF YOU DO NOT FOLLOW THESE INSTRUCTIONS EXACTLY A FIRE OR EXPLOSION MAY RESULT, CAUSING PROPERTY DAMAGE, PERSONAL INJURY OF LOSS OF LIFE.
7 A IR S HUTTER : Air Shutter Adjustment Nut Figure 5: Air Shutter Adjustment. The air shutter is controlled by sliding the air shutter adjustment screw (shown in Figure 5) either forwards or backwards. The adjustment screw, for the primary air , is located on the bottom of the rebox.
Oper a ting Instructions For Your Safety, Read Safety Precautions And Lighting Instructions Before Operating 8 The ideal ame will be blue at the base and light orange above. The ames should be of medium height. If the ames look like this (ref er to Figure 59 or the Front Cover), no adjustment is needed.
9 Maintenance And Ser vice R OUTINE M AINTENANCE : At least once a year , run through the following procedures to ensure the system is clean and working properly . Check the burner to see i f all the ports are clear and clean. Check the pilot to make sure it is not blocked by anything.
10 Figure 9: Install the Rock Set Burner to the Firebox. Maintenance And Ser vice R EPLACING THE G LASS : IMPORTANT: Do not operate with the glass front removed, cracked or broken. The glass in the replace is a high temperatur e ceramic. If the glass is damaged in any way , a factory replacement door is required (see P ARTS L IST ).
T o instal l the burner: 1. Insert the mixing tube into the mixing tube box (ref er to Figure 8 or 9). 2. When the burner is resting in the rebox ensure that the front edge of the burner is lined up with the front lip of the rebox (see Figure 10 or 11).
Maintenance And Ser vice F UEL C ONVERSION : TO BE INST ALLED BY A QU ALIFIED SERVICE A GENCY ONL Y Please read and understand these instructions before installing.
13 Figure 18: Removing valve cap. Maintenance And Ser vice screw must be not visible. Figure 20: Flip valve screw. Red o-ring is not visible Red o-ring is visible LPG Configuration h) Re-at tach the black protection cap that was remov ed in step a (Figure 18).
Initial Inst alla tion QUALIFIED INST ALLERS ONL Y WARNING: Operation of this heater when not connected to a properly installed and maintained venting system can result in carbon monoxide (CO) poisoning and possible death. P REPARATION F OR I NSTALLATION : • Remov e the packaging f rom the appliance, and check to make sure there is no damage.
15 Initial Inst alla tion QUALIFIED INST ALLERS ONL Y P LANNING Y OUR I NSTALLATION : Vertical Termination Storm Collar Flashing Round Support Box/Wall Thimble Ceiling Firestop Pipelength Pipelength C.
When planning your installation, it will be necessary to select the proper length of vent pipe f or your particular requirements. It is important to note when passing through a wall, the maximum al low able wall thickness is 10 inches (25.4 cm); 1 inches (3.
17 Table 6: Vent part numbers (Must state if galvanized or black wanted, PART NUMBERS). Direct Vent GS Direct-Temp Secure Vent Ameri Vent Direct Description 908 4DT -6 SV4L6 6” pipe length 4D7 7” .
1 In accordance with the current CSA B149, Natur al Gas and Propane Installation Code. 2 In accordance with the current ANSI Z223.1 NFP A 54, National Fuel Gas Code. * These numbers are only estimates. Clearance in accordance with installation codes and the r equirements of the gas supplier .
19 Initial Inst alla tion QUALIFIED INST ALLERS ONL Y V ENT C ONFIGURATIONS AND R ESTRICTOR S ETTINGS : Figure 28 and 29 shows the range of possible vent congur ations if the unit is top vented, for vertical and horizontal terminations, any lay out that remains within the grid ar eas is acceptable.
Initial Inst alla tion QUALIFIED INST ALLERS ONL Y R ESTRICTOR I NSTALLATION : The ENVIRO CARA has been designed for use with an add-in restrictor . The restrictor is designed to maintain ame appearance when installing this unit with vertical chimneys as well as installations with longer horizontal vent applications.
21 Woodscrews W all Thimble Strap Sheet metal screws Fold strap here 1 1 / 4 " (3.2cm) Figure 33: Installing Decorative Wall Thimble. 10" (254mm) 10" (254mm) Figure 32: Wall Framing Hole for Horizontal Installation. the outside, on black pipe.
Initial Inst alla tion QUALIFIED INST ALLERS ONL Y Wood screws (x4) Cut vinyl siding away to fit standoff Bolt (x4) required Nut (x4) required Wood screw (x4) Figure 34: Installing Vent Cap with Vinyl Siding Stand-Off. Figure 35: Installing Horizontal Vent Termination.
23 attic, as well as above the roof line. The galvaniz ed nish is desir able above the roof line, due to the higher corrosion resistance. 6. Once the pipe sections ha ve been joined, and run up thr.
8. Continue to add pipe sections until the height of the vent cap meets the minimum code requirements. Ref er to Figure 38 and T able 6. Note that for steep roof pitches, the vent height must be incr eased.
25 plumber ’s tape connected to wall strap W all strap 45° elbows (x2) Nails Ceiling firestop Ceiling Second floor Use clearances to as defined by appliance and vent pipe manufacturers. C ATHEDRAL C EILING I NSTALLATION : Figure 39: Use of Wall Straps.
Figure 42: Cathedral Ceiling Support Box Installation. Initial Inst alla tion QUALIFIED INST ALLERS ONL Y Figure 43: Corner installation rear vented with snorkel. Figure 44: Corner installation top vented. C ORNER I NSTALLATIONS : Do not interfere with the structur al integrity of the walls.
27 V ent Pipe Inside Finished Collar Dry W all W all Thimble Exterior W all Siding Minimum V ent T erminal 36” (914mm) High Snorkel Kit. Figure 46: Installation for Rear Vented; 33,500 Btu/hr. Place the unit into position. Attach a small section of pipe on the unit and mark exterior wall where vent would pass thr ough the wall.
V ent Ca p Inside Finished Collar Ceiling Support Insulation Guard Flue Pipe Roof T russ Roof Flashing Initial Inst alla tion QUALIFIED INST ALLERS ONL Y I NSTALLATION OF T OP V ENTED ; H ORIZONTAL T ERMINATION : Figure 47: Installation for Top Vented; Horizontal Termination.
29 Initial Inst alla tion QUALIFIED INST ALLERS ONL Y G AS L INE C ONNECTION AND T ESTING : WARNING: Only persons licensed to work with gas piping may make the necessary gas connections to this appliance.
Initial Inst alla tion QUALIFIED INST ALLERS ONL Y E LECTRICAL R EQUIREMENTS F OR G AS V ALVE AND O PTIONAL B LOWER : The ENVIRO CARA will operate without electrical power . This model has a millivolt gas control, which uses the pilot ame to generate enough electricity to operate the main burners.
31 Figure 52: Optional Blower (Fan) Installation. 1. Remove the pre-assembled blower fr om the packaging. Inspect the blower for damage. If damage is noticed call your dealer , distributor or courier company and hav e components replaced. 2. Remo ve the side panel by pul ling the panel up, slide the panel out of the bottom slots, and set aside.
Figure 55: Log Placement of Right Log. The placement of the logs is not arbitrary . If they are positioned incorrectly , the ames can be “pinched” and will not burn correctly . The burner has four (4) pins and four (4) ledges which make alignment easier .
33 Second ar y Inst alla tion Second ar y Inst alla tion Figure 58: Log Placement Complete. Figure 56: Log Placement of Left Log. Left Log Center Log Figure 57: Log Placement of Center Log.
I NSTALLATION OF R OCK S ET : If the rocks are posi tioned incorrectly , the ames can be “pinched” and will not burn correctly . If the rocks are broken due to handling or shipping, replace the rocks with new ones. Using the pictures provided, carefully set the rocks in place.
35 Second ar y Inst alla tion Figure 61: Rock Placement of Four Large Rocks. Figure 62: Rock Placement of Two Medium Rocks. Figure 63: Rock Placement of Seven Small Rocks. Figure 64: Rock Placement Complete. 3. The four (4) large rocks are placed across front of burner (see Figures 61 & 62).
Second ar y Inst alla tion Important note: When the unit is turned on for the rst time, it should be turned onto high without the fan on for the rst four (4) hours. This will cure the paint, rockss, gasket material and the other products used in the manufacturing pr ocess.
37 T rouble Shooting Problem Possible Cause Solution The main burner does not ignite when called for . The gas valv e may not be on. • Check that the gas control knob is in the “ON” position. Thermostat is not calling for heat. • Adjust the thermostat several degr ees above ambient temperature.
P ar ts List 38 Reference Number Part Description Part Number 1 120°F (49°C) Ceramic F an T emperatur e Sensor EC -001 Thermopile EC -012 2 S.I.T . Piezo Igniter EC -023 Domestic Power Cor d - 115V .
39 P ar ts List Reference Number Part Description Part Number 9 Cara Door Latch Assembly 50-1594 10 Cara Main Orice NG (PO512-37) 50-1596 10 Cara Main Orice LPG (PO512-1/16”) 50-1597 11 Cara F.
P ar ts Diagr am 40.
41 W arr anty Sherwood Industries Ltd. is the manufacturer of the VistaFlame line of heating products. At Sherwood Industries, our commitment to the highest level of quality and customer service is the most important thing we do.
4. The stove must be operated and maintained at all times in accordance with the instructions in the Owner’s Manual. If the unit shows signs of neglect or misuse, it is not covered under the terms of this W arr anty policy . Performance problems due to operator error will not be covered b y the Limited W arr anty policy .
43 20. Sherwood Industries Ltd. is free of liability f or any damages caused by the replace or stov e, as well as inconv enience expenses and materials.
44 Inst alla tion Da t a Sheet The following information must be recorded by the installer for warrant y purposes and futur e reference. NAME OF OWNER: _________________________________________ ADDRES.
デバイスEnviro Caraの購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
Enviro Caraをまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはEnviro Caraの技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。Enviro Caraの取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。Enviro Caraで得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
Enviro Caraを既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はEnviro Caraの不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、Enviro Caraに関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちEnviro Caraデバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。