Allied Air Enterprisesメーカー4)PCE(13の使用説明書/サービス説明書
ページ先へ移動 of 13
506252-01 Page 1 of 13 Issue 0902 Save these instructions for future reference INST ALLA TION AND MAINTENANCE INSTRUCTIONS (2,4)PCE(13,15) SERIES Electric Cooling Package Unit If this unit is to be installed in a mobile or manufactured home application, the ductwork must be sized to achieve static pressures within the manufacturer ’ s guidelines.
Page 2 of 13 506252-01 Issue 0902 INST ALLA TION These instructions, and any instructions p ackaged with mating components and/or accessories, should be carefully read prior to beginning installation. Note p articularly any CAUTIONS or W ARNINGS in these instructions and all labels on the units .
506252-01 Page 3 of 13 Issue 0902 dimension across the unit must be used across the top of the unit. Recommended spreader length: 3 ton and smaller package unit s – 44", 3.5 ton and larger units – 54". Units may also be moved or lifted with a forklif t while still in the factory-supplied packaging.
Page 4 of 13 506252-01 Issue 0902 not be sized by matching the dimensions of the duct connections on the unit. Out door ductwork must be insulated and waterproofed.
506252-01 Page 5 of 13 Issue 0902 Power supply to the unit must comply with all applicable codes and the National Electical Code (NEC) or Canadian Electrical Code (CEC). A fused disconnect switch should be field provided for the unit. The switch must be sep arate from all other circuits.
Page 6 of 13 506252-01 Issue 0902 Compressor Units are shipped with compressor mountings factory- adjusted and ready for operation. Caution: Do not loosen compressor mounting bolts. Heater Kit Accessory (if used) The unit is fully equipped for cooling operation without auxiliary heat.
506252-01 Page 7 of 13 Issue 0902 OPERA TION Sequence of Operation Cooling Upon cooling demand, the thermostat closes circuit R and Y . Closing R and Y closes the unit contactor , starting the compressor and outdoor fan. The thermost at automatically closes R to G circuit which also brings on the indoor blower at the same time.
Page 8 of 13 506252-01 Issue 0902 Cooling System Performance For maximum performance of the cooling system, operating temperatures and pressure should be checked. Superheat should be determined at S tandard ARI test conditions of 82°F outdoor and 80°F indoor dry bulb/67°F wet bulb.
506252-01 Page 9 of 13 Issue 0902 Owner Record Model # _________________________________ Serial # _________________________________ Installation Date ___________________________ Installed by: Dealer _.
Page 10 of 13 506252-01 Issue 0902 Figure 8 Connection Diagram Single Phase – PSC Motor P/N 48396-001 Unit F actor y Shipped S ettin gs C ooling Input (B L K ) 24 LOW 30 MED 36 HIGH 42 LOW 48 MED 60.
506252-01 Page 11 of 13 Issue 0902 Figure 9 Connection Diagram Single Phase – V ariable S peed Motor P/N 48397-001 CONDENSER F AN MOT OR DIAGNOSTIC MODULE Unit F actor y Shipped Sett ings AD J US T .
Page 12 of 13 506252-01 Issue 0902 ALLIED AIR ENTERPRISES EQUIPMENT LIMITED W ARRANTY APPLIES IN U.S.A. AND CANADA ONL Y F AILURE TO MAINT AIN YOUR EQUIPMENT WILL VOID THIS W ARRANTY COVERED EQUIPMENT.
506252-01 Page 13 of 13 Issue 0902 Allied Air Enterprises Inc. (“Allied Air”) provides its air conditioning and heating product s with a S tandard Limited Parts Wa rranty for five (5) years. This additional 5-Y ear Limited Extended Parts Warranty is in addition to and is intended to supplement Allied Air ’ s S tandard Limited Parts Warranty .
デバイスAllied Air Enterprises 4)PCE(13の購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
Allied Air Enterprises 4)PCE(13をまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはAllied Air Enterprises 4)PCE(13の技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。Allied Air Enterprises 4)PCE(13の取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。Allied Air Enterprises 4)PCE(13で得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
Allied Air Enterprises 4)PCE(13を既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はAllied Air Enterprises 4)PCE(13の不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、Allied Air Enterprises 4)PCE(13に関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちAllied Air Enterprises 4)PCE(13デバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。