Field ControlsメーカーPVO-600の使用説明書/サービス説明書
ページ先へ移動 of 12
2630 Airport Road · Kin ston, NC 28504 Phone: 252-522-3031· Fax: 252-522-0214 www.fieldcontrols.com POWER VENTER SYSTEM Mode l: PVO-300, PVO-600 Included is one ETL and cETL listed Powe r Vente r to be used primarily with a single 120VAC controlled oil fired furnace, boiler, or water heater.
Page 2 UNIT SPECIFICATIONS (See Table 1 and Figure 1 ) Table 1 UNIT DIMENSIONS (INCHES) MODEL “H” “W” “D” I/O* PVO-300 7.50 9.25 7.00 4/4 PVO-600 8.75 9.75 8.50 4/4 * Inlet and outlet diameter. ELECTRICAL RATINGS MODEL VAC Hz RPM WATT AM P TP** PVO-300 120 60 3000 145 2.
Page 3 POWER VENTER SIZING In order to choose the correct size po wer venter for a particu la r installation, the total input firing rate and total equivalen t length of vent pipe to be u sed must be kno wn. Refer to Tabl e 2 to determine the maxim um allowable equivalent feet of pipe for each model used with the pipe diameters shown.
Page 4 INSTALLATION SAFETY INSTRUCTIONS CAUTION: This devi ce must be install ed by a qualified install e r in accordance with the m anufacturer's installation instructions. Appliances should have a minim um of 75% co mbustion efficiency or have a maximum measured flue gas temperature of 550°F at the inlet of the venter.
Page 5 INSTALLATION OF POWER VENTER CAUTION: Failure to inst all, maintain and/or opera te the power venting system in accordan ce with manufacturer' s instructions will result in conditions whic h may produce bodily injury and/or property dam age.
Page 6 Diagram B Diagram C.
Page 7 M ULTIPLE A PPLIA NCE S YSTEMS When using one PVO power vente r to common vent more than on e appliance, a Control Kit is required for e ach additional appliance. 1. Connect the negative pressure port of each air pressure fan proving switch on all Control Kits being used to the provided tee mounted on the PVO.
Page 8 GENERAL INSTALLATION INSPECTION Follow recommende d procedures for safety inspection of a heat ing appliance in accorda nce with the National Fuel Gas Code A.N.S.I. Z223.1. The following procedure will help in evaluat ion of the venti ng system.
Page 9 PV SERIES POWER VENTER: VERTICAL VENTING OPTION Diagram D illustrates correct an d incorrec t installation of PV series venter in vertical vent c onfiguration (except PVE- 1200). The correct installation maintain s the required vertical po sition of the pressure switch; the incorrect installation does not.
Page 10 REPLACEMENT PARTS LIST The following items are available for replacement, if necessary. REPLACEMENT PARTS LIST DESCRIPTION PVO-300 PVO-600 Motor 46032000 46083300 Blower Wheel 46033400 4608940.
Page 11 NOTES.
Page 12 P/N 46311800 Rev E 11/07.
デバイスField Controls PVO-600の購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
Field Controls PVO-600をまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはField Controls PVO-600の技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。Field Controls PVO-600の取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。Field Controls PVO-600で得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
Field Controls PVO-600を既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はField Controls PVO-600の不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、Field Controls PVO-600に関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちField Controls PVO-600デバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。