FrymasterメーカーSDU90の使用説明書/サービス説明書
ページ先へ移動 of 13
Frymaster, a member of the Comm ercial Food Equipment Service Association, recommends using CFESA Certified Technicians. 24-Hour Service Hotline 1-800-551-8633 SEPTEMBER 2005 www.
ii NOTICE IF, DURING THE WARRANTY PERIOD, THE CU STOMER USES A PART FOR THIS ENODIS EQUIPMENT OTHE R THAN AN UNMODIFIED NEW OR RECYCLED PART PURCHASED DIRECTLY FROM FRYMASTER DEAN, OR AN Y OF ITS AUTHORIZED SERVICE CENTERS, AND/OR THE PART BEI NG USED IS MODIFIED FROM ITS ORIGINAL CONFIGURATION, THIS WARRANTY WILL BE VOID.
iii Shortening Disposal Unit (SDU) Installation, Operation, Service, and Parts Manual TABLE OF CONTENTS Page 1. INTRODUCTION 1 1.1 Service Information and Parts Ordering ..............................................1 1.2 Installation, Operating and Service Personnel .
SHORTENING DISPOSAL UNIT (SDU 50, SDU 90 AND BKSDU) INSTALLATION, OPERATION, SERVICE AND PARTS 1 1. INTRODUCTION 1.1 Service Information and Parts Ordering Included with the unit when shipped from the factory is a list of Factory Au thorized Service Cen ters (FASCs).
2 manuals, and to stock a minimum amount of parts for F rymaster equipment. A list of Factory Authorized Service Centers (FAS Cs) was included with this equipment when shipped from the factory. Unless specifically indica ted ot herwise in this manual, failure to use q ualified service personnel will void the Frymaster Warranty on this equipment.
3 With the cover open, the top of the tank is 9¾ in ches (248 mm) above the floor, permitting it to be positioned directly beneath the dra ins of most fryers.
4 DANGER Before each use inspect the cover to ensure the cover gasket is present and properly placed. DO NOT use the disposal unit if this gasket is damaged or missing. 3. Slowly open the drain valve. Regulate flow w ith the drain valve to prevent splashing.
5 6. On BKSDU units, the built-in heater may be connected to a grounded 120VAC or 240VAC receptacle to prevent shortening from solidifyi ng in the tank when immediate transfer to a disposal container is not possible. 2.4 Cleaning Clean the crumb screen with a solution of detergent and water.
6 2. Remove the five screws securing the front cover and remove the cover. If replacing the pump shaft seal only, remove the old seal and install the replacem ent as shown in the illustration below, then go to Step 5. If replacing the pump vanes, go to Step 3.
7 4. PARTS LIST 5 17 22 23 32 31 33 9 28 1 2 3 4 6 7 8 10 12 13 11 14 15 16 20 21 25 26 27 29 16 11 30 18 34 38 37 36 35 19 NOTE: See Pag e 6 for BK SDU pump assembly components .
8 Item Part # Component 1 Pipe Assembly, Discharge 823-4600 Standard (includes Item 2) (use 823-4617 for BKSDU) 823-4598 For use with Item 4 (Hose Discharge) (includes Item 3) 2 813-0115 Nipple, ¾-in.
9 NOTE: T he BKSDU pum p assem bly is identical to the SDU 50/SDU 90 pum p as sem bly except for the addition of the pump c over and insulation and the m odified dischar ge pipe ass em bly.
Frymaster, L.L.C., 8700 Line Av enue, PO Box 51 000, Shreveport, Louisiana 71135-1000 Shipping Address: 8700 Line Av enue, Shreveport, Louisiana 71106 TEL 1-318-865-1711 FAX (Par ts) 1-318- 688-2200 F.
デバイスFrymaster SDU90の購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
Frymaster SDU90をまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはFrymaster SDU90の技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。Frymaster SDU90の取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。Frymaster SDU90で得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
Frymaster SDU90を既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はFrymaster SDU90の不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、Frymaster SDU90に関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちFrymaster SDU90デバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。