GE MonogramメーカーZXR8510の使用説明書/サービス説明書
ページ先へ移動 of 12
® If you have questions , call 800.GE.CARES or visit our website at: www .monogram.com Installation Instructions M o n o g r a m ZXR858, ZXR859 and ZXR8510 Recirculating Accessories For Model ZV850, .
Installation Preparation W ARNING: TO REDUCE THE RISK OF FIRE, ELECTRICAL SHOCK OR INJURY TO PERSONS, OBSER VE THE FOLLOWING: A. Use this unit only in the manner intended by the manufacturer .
Installation Preparation 3 REQUIRED ACCESSORIES This book provides step by step instructions to install the Monogram ZV850 ceiling mounted hood for recirculating operation. • One of the following accessory kits is required for non- vented ceiling mounted installations of model ZV850.
Installation Preparation 4 TOOLS AND MA TERIALS REQUIRED (NOT SUPPLIED) • T ape measure • Knife • Spirit level • Wire cutter/stripper • Wire nuts • Electric drill and 5/32” bit • Phill.
Installation Preparation 5 REMOVE THE P ACKAGING The vent hood is packed separate from the required accessory: ZXR858, ZXR859 or ZXR8510. • Remove the frame, cover , parts box, side bars and packaging. • Remove junction box cover . • Install strain relief onto junction box cover .
Installation Preparation 6 – The framing should be spaced 8-5/8” on the sides and 7-5/8” at the front from centerline to centerline to accept mounting screws in the vent support frame. Note: The cross framing must be spaced 8-3/4" on the side from centerline to centerline in order to accept the hood mounting screws.
Installation Instructions 7 3 INST ALL L O WER SUP POR T FR AME • Insert lower support frame (from required accessory ZXR858, ZXR859 or ZXR8510) into the upper support frame and loosely secure with 8 screws and washers (4 on the front and 4 on the back sides).
Installation Instructions 8 • T ape the wire to the front of the frame support to prevent damage during installation and service. Ceiling Support Frames Tape House Wiring Front Side 5 SIZE AND INST ALL DUCTWORK • Measure from top duct connector (Dim.
Installation Instructions 9 6 INST ALL DECORA TIVE DUCT COVERS • Pretap or drive decorative screw into the screw holes on the support frame. This will make screw installation easier . • Separate the two decorative duct covers. • Select the inside (top) cover , which has vent hole pattern at the top.
Installation Instructions 10 7 INST ALL HOOD Note: TWO PEOPLE ARE REQUIRED TO COMPLETE THIS INST ALLA TION! • Lift the hood up to the support frame. Carefully align the hood mounting studs into the support frame holes, and at the same time, guide the hood duct connector into the duct.
Upper Charcoal Filter Slots Grasp T ab, Lift and Pull Forward Installation Instructions 11 9 SLIDE DUCT COVER DOWN, INST ALL SIDE UTILITY BARS • Hold the decorative duct cover and remove the temporary stop screw from the support frame. Return the screw to the service manual envelope for future use.
Note: While performing installations described in this book, safety glasses or goggles should be worn. For Monogram TM local service in your area, call 1.800.444.1845. Note: Product improvement is a continuing endeavor at General Electric. Therefore, materials, appearance and specifications are subject to change without notice.
デバイスGE Monogram ZXR8510の購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
GE Monogram ZXR8510をまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはGE Monogram ZXR8510の技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。GE Monogram ZXR8510の取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。GE Monogram ZXR8510で得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
GE Monogram ZXR8510を既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はGE Monogram ZXR8510の不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、GE Monogram ZXR8510に関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちGE Monogram ZXR8510デバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。