GEメーカーZSC1000の使用説明書/サービス説明書
ページ先へ移動 of 12
Installation Instructions Advantium ™ 120 Built-In SpeedCook Ovens SCB1000 SCB1001 ZSC1000 ZSC1001 For a Spanish version of this manual, visit our W ebsite at ge.com. Para consultar una version en español de este manual de instrucciones, visite nuestro sitio de internet ge.
Safety Information CAUTION: For personal safety , remove house fuse or oven circuit breaker before beginning installation to avoid severe or fatal shock injury .
MODELS A V AILABLE Profile Models: SCB1000 WW – White SCB1000 BB – Black SCB1000 CC – Bisque SCB1001 SS – Stainless Steel Monogram Models: ZSC1000 BB – Black ZSC1001 SS – Stainless Steel 3.
4 ADV ANCE PLANNING • These ovens may be installed directly into a 27" or 30" wide oven cabinet. • The front surface of the oven will be nearly flush with surrounding cabinetry doors. • This oven can be installed over any GE or GE Monogram single electric built-in oven or a warming drawer or both.
5 Installation Preparation ELECTRICAL REQUIREMENTS Single Advantium 120 Installation: This product requires a 120 volt, 60 Hz, 15 amp circuit and draws 1.8 kilowatts. This product must be connected to a supply circuit of the proper voltage and frequency .
Installation Preparation PREP ARE THE OPENING (CONT .) Installation over a GE/Monogram Warming Drawer: NOTE: Additional clearances between the cutouts may be required. Check to be sure the oven supports above the Warming Drawer location does not obstruct the required interior depth and height.
7 Installation Preparation PREP ARE THE OPENING (CONT .) Installation over a GE/Monogram Oven and Warming Drawer: NOTE: Additional clearances between the cutouts may be required. Check to be sure the oven supports above the Warming Drawer location does not obstruct the required interior depth and height.
8 Installation • Align bottom trim tabs to slots in the bottom of the oven. • Secure the bottom trim to the bottom of the oven using 3 brass screws provided. SLIDE THE OVEN INTO THE CUTOUT CAUTION: T wo people are required to lift the oven into the opening.
9 Installation INST ALL SIDE TRIM FOR 30" CABINET INST ALLA TION ONL Y . SKIP THIS STEP IF YOU HA VE 27" WIDE CABINETRY . • Open the oven door . • Hang the side trim pieces on the tabs behind the oven flange.The screw holes in the side trim should align with the holes in the oven flange.
10 Notes.
11 Notes.
NOTE: While performing installations described in this book, safety glasses or goggles should be worn. NOTE: Product improvement is a continuing endeavor at General Electric. Therefore, materials, appearance and specifications are subject to change without notice.
デバイスGE ZSC1000の購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
GE ZSC1000をまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはGE ZSC1000の技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。GE ZSC1000の取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。GE ZSC1000で得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
GE ZSC1000を既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はGE ZSC1000の不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、GE ZSC1000に関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちGE ZSC1000デバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。