GEメーカーZV541の使用説明書/サービス説明書
ページ先へ移動 of 20
If you have questions , call 800.GE.CARES or visit our website at: monogram.com Installation Instructions Island V ent Hoods Models: ZV42 I ZV54 I.
2 Installation Instructions W ARNING: TO REDUCE THE RISK OF FIRE, ELECTRICAL SHOCK OR INJURY , OBSERVE THE FOLLOWING: A. Use this unit only in the manner intended by the manufacturer .
3 Design Information 42” HOOD DIMENSIONS Model ZV42 I Model ZV54 I CONTENTS Design Information Product Dimensions ......................................................................3 Duct Cover Accessories ........................................
4 Design Information DUCT COVER ACCESSORIES ZV42 I * 9" for ceiling heights 7’11" to 8’5" using the supplied support frame and duct cover . Order ZX42DC10 for ceiling heights of 8"6" to 10’4". ZV54 I * 5" for ceiling heights 7’11" to 8’5" using the supplied support frame and duct cover .
5 Advance Planning ADV ANCE PLANNING Ductwork Planning • These vent hoods are equipped for 10” round ductwork. • Determine the exact location of the vent hood. • Plan the route for venting exhaust to the outdoors. • Use the shortest and straightest duct route possible.
INST ALLA TION HEIGHT REQUIREMENTS • These vent hoods must be installed 30" min. and 36" max. above the cooking surface – regardless of the ceiling height. Therefore, installation height of the hood depends on the exact ceiling height of the kitchen.
Use this chart to compute maximum permissible lengths for duct runs to outdoors. For best results, use 10" diameter duct. Note: Do not exceed maximum permissible equivalent lengths! Maximum recom.
8 Installation Preparation TOOLS AND MA TERIALS REQUIRED (NOT SUPPLIED) Pencil and tape measure Pliers Electric or battery operated drill and 3/16", bits, Phillips and Flat Blade Screwdriver bits. 120V 60Hz. 15 or 20 Amp, 2-wire with ground. Properly grounded branch circuit.
9 Installation Preparation P ARTS PROVIDED Locate the parts packed with the hood. HARDW ARE P ACKAGE Locate and check contents. Screws shown actual size. 2 Grease trays (3 with 54" hood) Implement rods with standoffs Duct collar Support frame for 8 ft.
10 Plan the Location of the Hood and Ductwork • Use a plumb bob to check the location. The countertop/cooktop below the hood must be centered with the hood. • The hood should extend beyond the front and rear edge of the cooking appliance. • The duct in the ceiling must be centered over the cooktop.
11 T op View – Ceiling Joists Run Perpendicular to Front of Hood T op View – Ceiling Joists at Angle with Front of Hood Installation Instructions STEP 1 CONSTRUCT CEILING SUPPORT CONTINUED 12-3/4 .
12 STEP 1 CONSTRUCT CEILING SUPPORT CONTINUED Installation Instructions Ductwork • Use the shortest and straightest duct route possible. For satisfactory performance, duct run should not exceed 150 feet equivalent length for any duct configuration.
13 • Select the template for your hood size. • Align the template with the marks on the ceiling and tape in place. – Be sure the template is oriented correctly , with the front of the hood. • Use a plumb to check to be sure the mounting holes will provide parallel alignment with the countertop below .
14 Installation Instructions STEP 4 INST ALL ACCESSORY (OR SUPPLIED) SUPPOR T AND DUCT COVERS Install supplied support frame OR telescoping accessory frame • Hang the supplied support frame or telescoping accessory frame to the ceiling joists and cross framing on the 4 hex head screws by engaging the keyhole slots on the frame.
15 Installation Instructions STEP 5 INST ALL DUCT TRANSITION WITH DAMPER IMPORT ANT : Remove shipping tape from damper and check that damper moves freely . • Place the transition piece over the hood exhaust and secure with 4 Screws C provided. • Use duct tape to seal the connection.
16 Installation Instructions STEP 8 CONNECT ELECTRICAL V erify that power is turned off at the source. W ARNING: If house wiring is not 2-wire with a ground wire, a ground must be provided by the installer . When house wiring is aluminum, be sure to use UL approved anti-oxidant compound and aluminum-to-copper connectors.
17 Installation Instructions STEP 11 INST ALL FIL TERS • Insert the filter into the upper opening and drop into the trays. • T o remove the filters, grasp the knobs and push the filter up and lift out. STEP 12 INST ALL RODS • Use a flat blade screwdriver to install stand-offs into the bottom of the hood.
18 STEP 13 INST ALL SUPPLIED DUCT COVER AND TOP COVER STEP 14 FINALIZE INST ALLA TION • Check all lamps to assure tightness in sockets. • T urn power on at the circuit breaker . • Refer to the Owner ’ s Manual for operating and cleaning instructions.
19 STEP 15 INST ALLA TION CHECKLIST Check Blower Safety Screw ■ ■ Ensure that blower safety screw is securely tightened. See page 16, Step 9. If screw is missing, order replacement parts bag. Check Operating Sound and Proper Air -Flow ■ ■ T urn blower to each speed setting and listen for rattles and vibration.
Pub. No. 49-80209-3 01-08 JR Note: While performing installations described in this book, safety glasses or goggles should be worn. For Monogram ® local ser vice in your area, call 1.800.444.1845. Note: Product improvement is a continuing endeavor at General Electric.
デバイスGE ZV541の購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
GE ZV541をまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはGE ZV541の技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。GE ZV541の取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。GE ZV541で得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
GE ZV541を既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はGE ZV541の不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、GE ZV541に関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちGE ZV541デバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。