A.O. Smithメーカー500の使用説明書/サービス説明書
ページ先へ移動 of 24
1 A DIVISION OF A. O. SMITH CORPORA TION MC BEE, SC., RENTON, WA., STRA TFORD-ONT ARIO, VELDHOVEN-THE NETHERLANDS w w w .hotwater .com GAS-FIRED COMMERCIAL COPPER BOILERS FOR HYDRONIC HEA TING AND HOT.
2 Lighting Instructions for the G(B/W) 300 through 750 models THE UNIT SHOULD NOT BE INST ALLED DIRECTLY ON A CARPETED FLOOR. A FIRE HAZARD MA Y RESUL T . Instead, the boiler must be installed on the A. O. Smith Combustible Floor Kit Base or concrete blocks extending beyond the full width and depth of the boiler by at least 3 (76.
3 LIGHTING INSTRUCTIONS These models have an automatic hot surface ignition system mounted on the combustion chamber panel inside the front jacket. This hot surface igniter ignites the main burner gas whenever the system control calls for heat.
4 the surrounding air pressure. Inspection of the boiler and vent system is necessary to insure that flue gas leakage to the surrounding area does not occur .
5 Figure 1A. CCB (Drawing #211758).
6 Figure 1B. FCB (Drawing #211759).
7 Figure 1C. PDB (Drawing #211760).
8 closed and everything else is in the proper state, a "call for heat" condition will be initiated. These leads should be shorted together, when a thermostat is not being used.
9 CCB - Three position Dipswitch (Flame Control Section): This dipswitch is similar to the FCB dipswitches described below , but with only three switches being used: the number of blower speeds (switch #3), Hi Gas option (switch #2) and a spare (switch #1).
10 • S tored values are recalled from memory . • Configuration dipswitches are read. • Pending faults are recalled • Micros on all boards start running (indicated by a flashing Y ellow LED nea.
11 The operation of these parts is described below: UIM Screens: On all screens a double vertical bar appears on the right side of the display each time a key is touched to indicate that a key has been activated. On several screens an indicator ">" appears on the left side of the display to indicate the active line.
12 except the fault states. If enabled the powered vent and the IRI gas valve are turned on. A command is sent to all active stages to cold purge the system. Cold purging clears out any combustion gas that may be in the combustion chamber . When purging is complete the system moves to the Heat S tate.
13 • User Settings Screen: Each setpoint or user setting has either a limited selection of values, or a limited range of values. The Up/Down keys are used to change values. After changing an item, the Select key is pressed to accept the change, or the Menu key is pressed to reject the change and restore the item to its original value.
14 CONNECTION DIAGRAM (Drawing #21 1769) FIGURE 4..
15.
16 Number of cycles for each stage (Number of times stage has been in heat mode). Kbtu rating of the boiler (0 to 5750Kbtu in 10Kbtu increments) The software revision level of the CCB, and FCB micro- controllers. Current Error Screen: • Displays the last error that the system has detected plus a timestamp of when the error occurred.
17 TROUBLESHOOTING IGNITION SYSTEM Fault Messages and Lockout S tatus (* = stage number: 1 or 2) Fault Displayed Description Red LED Lockout “Display Fail” Communications with UIM interrupted Continuous Auto Reset • Check communication cable to UIM.
“Blocked Flue” Flue is Blocked Continuous SOFT • Caused by the blocked flue switch contacts being open when they should have been closed. Check for flue blockage, switch contacts, wiring.
Other troubleshooting hints: 1. Input switches can be easily checked by observing their activation on the UIM System S tatus screen. Force the boiler to remain in the S t andby mode by opening the Thermost at input or by setting the operating setpoint to the minimum so that the system does not request heat.
20 NOTES.
21 NOTES.
22 NOTES.
23 NEW BOILER LIMITED W ARRANTY A. O. Smith Corporation, the warrantor , extends the following LIMITED W ARRANTY to the owner of this hydronic boiler: 1.
24 A DIVISION OF A. O. SMITH CORPORA TION MC BEE, SC., RENTON, WA., STRA TFORD-ONT ARIO, VELDHOVEN-THE NETHERLANDS w w w .hotwater .com.
デバイスA.O. Smith 500の購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
A.O. Smith 500をまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはA.O. Smith 500の技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。A.O. Smith 500の取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。A.O. Smith 500で得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
A.O. Smith 500を既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はA.O. Smith 500の不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、A.O. Smith 500に関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちA.O. Smith 500デバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。