GSI OutdoorsメーカーPNEG-214の使用説明書/サービス説明書
ページ先へ移動 of 38
PNEG-214 12'-18' Diameter Bins Cor-Lok and Cut-Lok Flooring and Grandst and Layout Inst allation Manual PNEG-214 Date: 03-07-08.
2 PNEG-214 12' -18' Cor-Lok an d Cut-Lok Flooring.
PNEG-214 12'-18 Cor-Lok and Cut-Lok Floo rin g 3 T able of Content s Contents Chapter 1 Safety .............. ................ ................. ................ ................ ................ .............. ............ ................ .....
4 PNEG-214 12'-18 Cor- Lok a nd Cut-Lok Flo ori ng T able of Content s Chapter 11 20 Gauge Floor Support Requirements ....... ................................................ ............. ........... ........ 27 20 Gauge Grandstand Chart - 2.66" Corrugation .
PNEG-214 12'-18' Cor-Lok and Cu t-Lok Floori ng 5 1. Safety Safety Guidelines This manual contains information that is important for you, the owner/opera tor, to know and understand. This information relates to protectin g personal safety and preventing eq uipment problems .
6 PNEG-214 12'-18 ' Cor-Lok and Cu t-Lok Floori ng 1. Safety Safety Instructions Our foremost concern is your safety and the safety of oth ers associated with this equipme nt.
1. Safety PNEG-214 12'-18' Cor-Lok and Cu t-Lok Floori ng 7 Prep are for Emergencies Be prepared if f ire start s. Keep a first aid kit and fire extinguish er handy . Keep emergency numbers for doctors, ambulance service, hospital and fire dep artment near your telephone.
8 PNEG-214 12'-18' Co r-Lok and Cut-Lok Flo oring 2. Recommended Method for Full Floor Inst allation Fan Placement Diagram For uniform air flow, place the fans in relation to the unloading tube as shown in Figure 2A . Floor planks should be perpendicular to the unloading tube.
2. Recommended Method for Full Floor Inst allation PNEG-214 12'-18' Cor-Lok and Cu t-Lok Flooring 9 Grain Systems Recommended Method for Full Floor Inst allation Using the GSI recommended me.
10 PNEG-214 12'-18 ' Co r-Lok and Cut-Lo k Flooring 2. Recommended Method for Full Floor Inst allation Figure 2C 4. Install flooring starting a t the bin wall o n the op posite side of the unload a uger.
PNEG-214 12'-18' Cor-Lok and Cu t-Lok Floori ng 11 3. Grandst and Identification 20 Gauge Grandst and Identification Figure 3A 20 Gauge Plenum Cleara nce Grandst and Color Code 11 - 7 / 8 &q.
12 PNEG-214 12'-18 ' Co r-Lok and Cut-Lo k Flooring 4. Flashing Inst allation Figure 4A Grain Systems Formed Flashing Inst allation If a bin sweep auger will be used, overlap flashing so that the sweep with climb up on to the next flashing section when rotating (usually clockwise).
PNEG-214 12'-18' Cor-Lok and Cu t-Lok Floori ng 13 5. Grandst and Layout at Center W ell for Recirculating System Figure 5A Support all c enter wells to concrete.
14 PNEG-214 12'-18 ' Co r-Lok and Cut-Lo k Flooring 6. 12' Cut-Lok/Cor-Lok Plank Order and Grandst and Layout s Figure 6A Support all center wells to concrete.
6. 12' Cut-Lok/Cor- Lok Plank Order and Grandst and Layout s PNEG-214 12'-18' Cor-Lok and Cu t-Lok Floori ng 15 12' Cor-Lok/Cut-Lok and 20 Gauge Grandst and Layout 2.66" Corrugated Bins 3-7 Rings and 4.00" Corrugated Bins 3-5 Rings Figure 6B Support all center wells to concrete.
16 PNEG-214 12'-18 ' Co r-Lok and Cut-Lo k Flooring 7. 15' Cor-Lok/Cut-Lok Plank Order and Grandst and Layout s 15' Cut-Lok/Cor-Lok Plank Order Figure 7A Support all center we lls to concrete.
7. 15' Cor-Lok/Cut-Lok Plank Order and Grandst and Layout s PNEG-214 12'-18' Cor-Lok and Cu t-Lok Floori ng 17 15' Cor-Lok/Cut-Lok and 20 Gauge Grandst and Layout 2.66" Corrugated Bins 4 and 5 Rings and 4.00" Corrugated Bins 3 Rings Figure 7B Support all center we lls to concrete.
18 PNEG-214 12'-18 ' Co r-Lok and Cut-Lo k Flooring 7. 15' Cor-Lok/Cut-Lok Plank Order and Grandst and Layout s 15' Cor-Lok/Cut-Lok and 20 Gauge Grandst and Layout 2.66" Corrugated Bins 6 Rings a nd 4.00" Corrugated Bins 4 Rings Figure 7C Support all cente r we lls to concrete.
7. 15' Cor-Lok/Cut-Lok Plank Order and Grandst and Layout s PNEG-214 12'-18' Cor-Lok and Cu t-Lok Floori ng 19 15' Cor-Lok/Cut-Lok and 20 Gauge Grandst and Layout 2.66" Corrugated Bins 7 Rings a nd 4.00" Corrugated Bins 5 Rings Figure 7D Support all center we lls t o concrete.
20 PNEG-214 12'-18 ' Co r-Lok and Cut-Lo k Flooring 8. 18' Cor-Lok/Cut-Lok Plank Order Figure 8A Support all center wells to concrete..
PNEG-214 12'-18' Cor-Lok and Cu t-Lok Floori ng 21 9. 18' Grandst and Layout for Recirculating System 18' 20 Gauge Grandst and Layout for Recirculating System Cut-Lok or 18 Gauge Cor-Lok Floors 2.66" Corrugated Bins 8 Rings Maximum and 4.
22 PNEG-214 12'-18 ' Co r-Lok and Cut-Lo k Flooring 10. 18' Cut-Lok/Cor-Lok and Grandst and Layout s 18' Cor-Lok/Cut-Lok and 20 Gauge Grandst and Layout 2.66" Corrugated Bins 5 and 6 Rings and 4.00" Corrugated Bins 3 and 4 Rings Figure 10A Support all center wells to concrete.
10. 18' Cut-Lok/Cor-Lok and Grandst and Layout s PNEG-214 12'-18' Cor-Lok and Cu t-Lok Floori ng 23 18' Cor-Lok/Cut-Lok and 20 Gauge Grandst and Layout 2.66" Corrugated Bins 7 and 8 Rings and 4.00" Corrugated Bins 5 and 6 Rings Figure 10B Support all center wells to concret e.
24 PNEG-214 12'-18 ' Co r-Lok and Cut-Lo k Flooring 10. 18' Cut-Lok/Cor-Lok and Grandst and Layout s 18' Cor-Lok/Cut-Lok and 20 Gauge Grandst and Layout 2.66" Corrugated Bins 9-1 1 Rings and 4.00" Corrugated Bins 7 and 8 Rings Figure 10C Support all center wells to concrete.
10. 18' Cut-Lok/Cor-Lok and Grandst and Layout s PNEG-214 12'-18' Cor-Lok and Cu t-Lok Floori ng 25 18' Cor-lok/cut-lok and 20 Gauge Grandst and Layout 2.66" Corrugated Bins 12 Rings Figure 10D Support all center we lls to concrete.
26 PNEG-214 12'-18 ' Co r-Lok and Cut-Lo k Flooring 10. 18' Cut-Lok/Cor-Lok and Grandst and Layout s 18' Cor-Lok/Cut-Lok and 20 Gauge Grandst and Layout 4.00" Corrugated Bins 9 Rings Figure 10E Support all center wells to concrete.
PNEG-214 12'-18' Cor-Lok and Cu t-Lok Floori ng 27 1 1. 20 Gauge Floor Support Requirements 20 Gauge Grandst and Chart - 2.66" Corrugation Narrow/2.66" Corrugation - 20 Gauge Gra ndst and Floor Support Chart * For Aeration Systems recessed in the concrete, add one (1) ri ng for proper spacing.
28 PNEG-214 12'-18 ' Co r-Lok and Cut-Lo k Flooring 1 1. 20 Gauge Floor S upport Requirement s 20 Gauge Grandst and Chart - 4.00" Corrugation Wide/4.00" Corrugation - 20 Gauge Grandst and Floor Support Chart * For Aeration Systems recessed in the c oncrete, add one (1) ring for proper spa cing.
PNEG-214 12'-18 Cor-Lok and Cut-Lok Floorin g 29 12. Flashing S upport Stiffeners S tiffener Flashing Support Instructions for Internal Universal S tiffeners 1. Install the floor and support system, cutting the floor to go around the internal stiffeners as required .
30 PNEG-214 12'-18 Cor- Lo k an d Cut -Lok Flooring 13. Air Flow Sup port Instructions Inst allation of Air Flow Support s 1. Determine the spacing and quantity of air flow supports requ ired from the chart on Pa ge 32 .
13. Air Flow Support Instructions PNEG-214 12'-18 Cor-Lo k an d Cut -L ok Floo r ing 31 The following Figure 13A show methods of support placement to achieve the necessary spacing close to discharge augers and sumps.
32 PNEG-214 12'-18 Cor- Lok and Cut-Lok Flo oring 13. Air Flow Sup port Instructions * Inst allation, S p acing and Quantities of Air Flow Support s Under Channel Lock Floors Notes: 1. Use a maximum spacing of 16" for perforated corrugat ed flooring.
13. Air Flow Support Instructions PNEG-214 12'-18 Cor-Lo k an d Cut -L ok Floo r ing 33 Figure 13B.
34 PNEG-214 12'-18 Cor- Lok and Cut-Lok Flo oring 13. Air Flow Sup port Instructions Inst allation, S p acing and Quantities of Air Flow Supports Under Channel Lock Floors Y ork and Chief Bins Bin Diameter - Number of Supports Grain Depth at Bin W all (ft.
13. Air Flow Support Instructions PNEG-214 12'-18 Cor-Lo k an d Cut -L ok Floo r ing 35 Inst allation, S p acing and Quantities of Air Flow Supports Under Channel Lo ck Floors Behlen Bins Bin Diameter - Number of Suppo rt s Grain Dep th at Bin W all (f t.
3 6 P N E G - 2 1 4 12'-18 Cor-Lok an d Cut-Lok Flooring NOTES.
PNEG-214 12'-18 Cor-Lok and Cut-Lok Floorin g 37 14. W arranty The GSI Group Warranty THE GSI GROUP (GSI) WARRANTS ALL PRODUCT S WHICH IT MANUFACTURES TO BE FREE OF DEFECTS IN MATERIAL AND WORKMANSHIP UNDER NORMAL USAGE AND CONDITIONS FOR A PERIOD OF 12 MONTHS AFTER RETAIL SALE TO THE ORIGIN AL END USER.
T his equipment shall be in stalled in a ccor dance with the cur r ent installation codes and applica ble re gulations which should be ca r efully follow ed in all cases. Authorities ha ving jurisdiction should be consulted before inst allations are made.
デバイスGSI Outdoors PNEG-214の購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
GSI Outdoors PNEG-214をまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはGSI Outdoors PNEG-214の技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。GSI Outdoors PNEG-214の取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。GSI Outdoors PNEG-214で得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
GSI Outdoors PNEG-214を既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はGSI Outdoors PNEG-214の不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、GSI Outdoors PNEG-214に関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちGSI Outdoors PNEG-214デバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。