American Dryer Corp.メーカーPhase 7 / OPL ensor Activated Fire Extinguishing System D120の使用説明書/サービス説明書
ページ先へ移動 of 56
D120 Installa tion Manual Phase 7 / OPL Sensor Activated Fire Extinguishing System W ARNING: For your safety the information in this manual must be followed to minimize the risk of fire or explosion or to prevent property damage, personal injury or death.
D120 Retain This Manual In A Safe Place For Futur e Refer ence American Dryer Corporation products embody advanced concepts in engineering, design, and safety . If this product is properly maintained, it will provide many years of safe, efficient, and trouble free operation.
IMPOR T ANT YOU MUST DISCONNECT AND LOCKOUT THE ELECTRIC SUPPL Y AND THE GAS SUPPL Y OR THE STEAM SUPPL Y BEFORE ANY COVERS OR GUARDS ARE REMOVED FROM THE MACHINE T O ALLOW ACCESS FOR CLEANING , ADJUSTING , INST ALLA TION, OR TESTING OF ANY EQUIPMENT PER OSHA (Occupational Safety and Health Administration) ST ANDARDS.
W ARNING The dryer must never be operated with any of the back guards, outer tops, or service panels removed. PERSONAL INJURY OR FIRE COULD RESUL T . IMPOR T ANT PLEASE OBSER VE ALL SAFETY PRECAUTIONS displayed on the equipment and/or specified in the installation manual included with the dryer .
SECTION I IMPOR T ANT INFORMA TION ............................................................................... 3 A. Receiving and Handling ............................................................................................................
SECTION VI ROUTINE MAINTENANCE .................................................................................. 3 9 A. Cleaning .........................................................................................................................
3 SECTION I IMPOR T ANT INFORMA TION A. RECEIVING AND HANDLING The dryer is shipped in a protective stretch wrap cover with protective cardboard corners and top cover (or optional box) as a means of preventing damage in transit. Upon delivery , the dryer and/or packaging, and wooden skid should be visually inspected for shipping damage.
4 B. SAFETY PRECAUTIONS W ARNING: For your safety , the information in this manual must be followed to minimize the risk of fire or explosion or to prevent property damage, personal injury , or loss of life. W ARNING: The dryer must never be operated with any of the back guards, outer tops, or service panels removed.
5 7. A program should be established for the inspection and cleaning of lint in the burner area, exhaust ductwork, and area around the back of the dryer . The frequency of inspection and cleaning can best be determined from experience at each location.
6 MA X I MUM C APA C I TY (D RY WE I GHT) 1 2 0 l b 54. 43 kg T U M B L E R DI A M E T E R 44-1/ 8” 1 12.09 cm TUMBL E R D EP TH 4 0 - 9 / 1 6 ” 103.0 2 cm TUMBL E R V OLUME 3 5 . 9 0 c u f t 1,0 16.57 L TUMBL E R/D RI V E MOTOR 1 h p 0.75 kW BLO WER/ F AN M OT OR 3 hp 2.
7 NOTE: ADC reserves the right to make changes in specifications at any time without notice or obligation. Specifications D120.
8 B. COMPONENT IDENTIFICA TION 1. Dryer Front V iew Illus. No. Description 1 Microprocessor Control/Keyboard (touch pad) Panel Assembly (controls) 2 Control (top access) Door Assembly 3 Main Door Asse.
9 2. Dryer Rear V iew Illus. No. Description 1 Electrical Service Connections 2 T op Console 3 Heating Unit 4 Relay/W iring Box 5 Data Label and Installation Label 6 Air Connection 7 Exhaust T ransiti.
10 SECTION III INST ALLA TION PROCEDURES Installation should be performed by competent technicians in accordance with local and state codes. In the absence of these codes, the installation must conform to applicable American National Standards: ANSI Z223.
11 10 . The dryer must be installed with provisions for adequate combustion and make-up air supply . CAUTION: This dryer produces combustible lint and must be exhausted to the outdoors. Every 6 months, inspect the exhaust ducting and remove any lint build up.
12 2. If more headroom is needed when moving the dryer into position, the top console (module) may be removed. a . T o Remove T op Console (module)... 1) Disconnect the ground wire (A in the illustration below ) located at the rear upper left corner of the dryer .
13 C. DR YER ENCLOSURE REQUIREMENTS Even though a 12-inch (30.48 cm) clearance is acceptable, it is recommended that the rear of the dryer be positioned approximately 24-inches (60.96 cm) from the nearest obstruction (i.e., wall) for ease of installation, maintenance, and service.
14 D. FRESH AIR SUPPL Y REQUIREMENTS When the dryer is operating, it draws in room air , heats it, passes this air through the basket (tumbler), and exhausts it out of the building. Therefore, the room air must be continually replenished from the outdoors.
15 E. EXHAUST REQUIREMENTS 1. General Exhaust Ductwork Information Exhaust ductwork should be designed and installed by a qualified professional. Improperly sized ductwork will create excessive back p.
16 a . Outside Ductwork Protection 1) T o protect the outside end of the horizontal ductwork from the weather , a 90° elbow bent downward should be installed where the exhaust exits the building. If the ductwork travels vertically up through the roof, it should be protected from the weather by using a 180° turn to point the opening downward.
17 It is suggested that the ductwork from each dryer not exceed 20 feet (6.09 meters) with no more than two (2) elbows (excluding dryer connections). If the ductwork exceeds 20 feet (6.09 meters) or has numerous elbows, the cross-sectional area of the ductwork must be increased in proportion to the length and number of elbows in it.
18 IMPOR T ANT : For extended ductwork runs, the cross section area of the ductwork can only be increased to an extent. Maximum proportional ductwork runs cannot exceed 20 feet (6.09 meters) more than the original limitations of 20 feet (6.09 meters) with two (2) elbows.
19.
20 IMPOR T ANT : For extended ductwork runs, the cross section area of the ductwork can only be increased to an extent. Maximum proportional ductwork runs cannot exceed 20 feet (6.09 meters) more than the original limitations of 20 feet (6.09 meters) with two (2) elbows.
21 2. Electrical Service Specifications IMPOR T ANT : The dryer must be connected to the electric supply shown on the data label that is affixed to the left side panel/wall area behind the control door . In the case of 208 V AC OR 230/240 V AC, the supply voltage must match the electric service specifications of the data label exactly .
22 3. Electrical Connections NOTE: A wire diagram is included with each dryer and is affixed to the back side of the top control (access) door . The only electrical input connections to the dryer are the 3-phase (3ø) power leads (L1, L2, and L3), GROUND, and in the case of 4 wire service, the NEUTRAL.
23 G . GAS INFORMA TION It is your responsibility to have ALL plumbing connections made by a qualified professional to assure that the gas plumbing installation is adequate and conforms to local and state regulations or codes.
24 2. T echnical Data a . Gas Specifications * Measured at the gas valve pressure tap when the gas valve is on. b. Gas Connections: Inlet connection ---- 1-1/4” F .
25 3. Piping/Connections ALL components/materials must conform to National Fuel Gas Code Specifications ANSI Z223.1-LA TEST EDITION, or in Canada, CAN/CGA-B149.
26 IMPOR T ANT : The dryer and its individual shutoff valve must be disconnected from the gas supply piping system during any pressure testing of that system at test pressures in excess of 1/2 psig (3.
27 H. STEAM INFORMA TION It is your responsibility to have ALL plumbing connections made by a qualified professional to assure that the gas plumbing installation is adequate and conforms to local and state regulations or codes.
28 a . The pressure of the condensate in the steam supply line will cause water hammer and subsequent heat exchanger (steam coil) failure. The steam supply connection into the main supply line must be made with a minimum 12-inch (30.48 cm) riser . This will prevent any condensate from draining towards the dryer .
29 4. S team Damper Air System Connections The dryer is manufactured with a pneumatic (piston) damper system, which requires an external supply of compressed air . The air connection is made to the steam damper solenoid valve, which is located at the rear of the top console.
30 6. S team Damper Air Piston (Flow Control) Operation Adjustment Although the steam damper operation was tested and adjusted prior to shipping at 80 PSI (5.51 bar), steam damper operation must be checked before the dryer is put into operation. Refer to page 33 for instructions to check steam damper operation.
31 I. PREP ARA TION FOR OPERA TION/ST AR T -UP The following items should be checked before attempting to operate the dryer: 1. Read ALL “ CAUTION ,” “ W ARNING ,” and “ DIRECTION ” labels attached to the dryer .
32 J. PREOPERA TIONAL TESTS ALL dryers are thoroughly tested and inspected before leaving the factory . However , a preoperational test should be performed before the dryer is publicly used. It is possible that adjustments have changed in transit or due to marginal location (installation) conditions.
33 b. Steam Models 1) Check to insure that the steam damper is functioning properly . a ) The steam damper should not “slam” (open or closed) when it reaches the end of (piston) travel. Additionally , the steam damper should not bind and/or stop during travel.
34 K. COMPRESSED AIR REQUIREMENTS The dryer requires an external supply of compressed air (2.5 cfh at 80 PSI [0.07 cmh at 5.51 bar] for gas models and 3.25 cfh at 80 PSI [0.09 cmh at 5.51 bar] for steam models). For steam models, compressed air is necessary for the air operated steam damper .
35 L. SHUTDOWN INSTRUCTIONS If the dryer is to be shutdown (taken out of service) for a period of time, the following must be performed: 1. Discontinue power to the dryer either at the external disconnect switch or the circuit breaker . 2. Discontinue the heat supply: a.
36 SECTION IV SER VICE/P AR TS INFORMA TION A. SER VICE 1. Service must be performed by a qualified trained technician, service agency , or gas supplier .
37 SECTION V WARRANTY INFORMA TION A. RETURNING W ARRANTY CARDS 1. Before any dryer leaves the ADC factory test area, a warranty card is placed on the back side of the main door glass.
38 2. Each part must be tagged with the following information: a. Model number and serial number of the dryer from which part was removed. b. Nature of failure (be specific). c . Date of dryer installation. d. Date of part failure. e . Specify whether the part(s) being returned is for a replacement, a credit, or a refund.
39 SECTION VI ROUTINE MAINTENANCE A. CLEANING A program and/or schedule should be established for periodic inspection, cleaning, and removal of lint from various areas of the dryer , as well as throughout the ductwork system. The frequency of cleaning can best be determined from experience at each location.
40 STEAM DRYERS Clean the steam coil fins. Compressed air and a vacuum cleaner with brush attachment are suggested. NOTE: When cleaning steam coil fins, be careful not to bend the fins. If fins are bent, straighten by using a fin comb, which is available from any local air conditioning supply house.
41 B. ADJUSTMENTS 7 DA YS AFTER INST ALLA TION AND EVER Y 6 MONTHS THEREAFTER Inspect bolts, nuts, screws, (bearing setscrews), grounding connections, and nonpermanent gas connections (i.e., unions, shutoff valves, and orifices). Motor and drive belts should be examined.
42 SECTION VII MANUAL RESET BURNER HI-LIMIT INSTRUCTIONS A. PHASE 7 This dryer was manufactured with a manual reset burner hi-limit thermostat, which is monitored by the Phase 7 computer .
43 When contacting American Dryer Corporation , certain information is required to insure proper service/parts information from ADC . This information is on the data label that is af fixed to the left side panel/wall area behind the control door . When contacting ADC , please have the model number and serial number available.
44 SECTION IX PROCEDURE FOR FUNCTIONAL CHECK OF REPLACEMENT COMPONENTS 1. For Heat Control Module Ignition Circuit a . For Models with Direct Spark Ignition (DSI) Module (T ype I) Theory of Operation: Start the drying cycle.
45 SECTION X PHASE 7 OPL SYSTEM DIAGNOSTICS IMPOR T ANT : YOU MUST DISCONNECT AND LOCKOUT THE ELECTRIC SUPPL Y AND THE GAS SUPPL Y OR THE STEAM SUPPL Y BEFORE ANY COVERS OR GUARDS ARE REMOVED FROM THE.
46 Input/Output (I/O) Board Output Description (“Green” light emitting diode [L.E.D.]) 1. F AN – (GREEN L.E.D.) This L.E.D. will indicate the status of the Fan output. If the request to turn on the Fan (blower) is made, then the L.E.D. is ON. 2.
47 S.A.F.E. System In Action The exclusive Sensor Activated Fire Extinguishing (S.A.F .E.) System will extinguish fires that may start in the drying basket (tumbler). A series of sensors positioned throughout the basket (tumbler) and interfaced with the microprocessor will trigger the S.
48 BEFORE YOU ST ART! CHECK LOCAL CODES AND PERMITS Call your local water company or the proper municipal authority for information regarding local codes.
49 2. W ater Connections: The water connection is made to the 1/2” M.P .T . bushing of the electric water solenoid valve located at the rear upper left area of the dryer (see photo). The water solenoid valve has a 3/8” M.P .T . connection and a 1/2” bushing is supplied to provide the minimum 1/2-inch supply (feed) line.
50 OPTIONAL MANUAL BYP ASS Provisions are made in the dryer sensor activated fire extinguishing (S.A.F .E.) system for the installation of an optional manual bypass. Depending on the model dryer , the connections for the manual bypass are made at the “T” or “four way” fitting located in the outlet supply side of the water solenoid valve.
51 Sensor Activated Fire Extinguishing (S.A.F.E.) System Theory of Operation While the dryer is in an idle state or 20-seconds after the heat turns off, the Phase 7 control monitors the S.A.F .E. system probe located in the top of the basket (tumbler) chamber and records the minimum temperature.
ADC Part No. 1 13179 3 - 09/1 1/08 - 5.
デバイスAmerican Dryer Corp. Phase 7 / OPL ensor Activated Fire Extinguishing System D120の購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
American Dryer Corp. Phase 7 / OPL ensor Activated Fire Extinguishing System D120をまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはAmerican Dryer Corp. Phase 7 / OPL ensor Activated Fire Extinguishing System D120の技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。American Dryer Corp. Phase 7 / OPL ensor Activated Fire Extinguishing System D120の取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。American Dryer Corp. Phase 7 / OPL ensor Activated Fire Extinguishing System D120で得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
American Dryer Corp. Phase 7 / OPL ensor Activated Fire Extinguishing System D120を既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はAmerican Dryer Corp. Phase 7 / OPL ensor Activated Fire Extinguishing System D120の不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、American Dryer Corp. Phase 7 / OPL ensor Activated Fire Extinguishing System D120に関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちAmerican Dryer Corp. Phase 7 / OPL ensor Activated Fire Extinguishing System D120デバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。