IBMメーカーYY-R5xxの使用説明書/サービス説明書
ページ先へ移動 of 14
ZZ17-W2001-B 1 YY -W2xx Pedest al Server Chassis YY -R5xx 5U Rackmount Server Chassis Installation Guide 2005.04. V ersion B.
ZZ17-W2001-B 2 INDEX 1. Intr oduction 2. Hardwar e Packing List 3. System Installation 3.1.Chassis Open 3.2.Motherboard Installation 3.3.Add-on Card Installation 3.4.CD–ROM D rive/FDD Installation. 3.5.Fixed HDD Cage , HDD Installation 3.6.Instructions for Switches and LED Indicators on front panel 3.
ZZ17-W2001-B 3 1. INTRODUCTION YY -W2 series Server Chassis is designed in compliant with EEB3.0 specification (refer to www .ssiforum.or g ) and A TXV2.1 (refer to www .form factors.org) Mother Board: z YY -W2 is designed for extended A TX (12"x13"), in com pliant with A TX spec, CEB and EEB3.
ZZ17-W2001-B 4 Thermal Solution: z One(1) 120x120mm Cooling Fan is installed, rear mounted z Options of two (2) 60*60*25mm , rear mounted. Switches and LED Indicators on front panel z Power S.
ZZ17-W2001-B 5 2. Hardware Packing List When you unpack your YY -W2 Server Chassis, check that all the items that you ordered are present in good condition. Review the inventory checklist below to be sure that the components and optional components that you ordered are included.
ZZ17-W2001-B 6 3. System Installation 3.1 Chassis Open T o release two (2) screws on the rear side of chassis, pull the side cover with handle. 3.2 Motherboard Installation Check mounting holes of motherboard, to screw the standof fs required to chassis.
ZZ17-W2001-B 7 3.3 PCI Add-on Card Installation Remove the tail gate bracket, install PCI card into motherboard, and screw in bracket to rear window of chassis. The chassis could be optional required A Card Clamp Holder which is used to clamp the Add-on Card for avoiding any popping issue.
ZZ17-W2001-B 8 T o remove the front panel fist, the front panel is snap in chassis with hocks (or/and screw on by 4pcs screws), please screw of f the screws and pull the front panel forward. z T o remove the metal covers (vented panel). z Screw a pair of rails to drive.
ZZ17-W2001-B 9 T o screw off four (4) screws in the front plate of chassis, the HDD cage could be removed from chassis, install HDD into cage. The cooling fan of HDD cage could be easy swap, release two thumb screws in the front of HDD cage, lift of f the fan holder , swap fan and assembly again into cage.
ZZ17-W2001-B 10 3.6 Instructions for Switches and LED Indicators on front panel The switches and led indicato rs on front panel have the functions as following: POWER SW : Push Switch, The system power on/of f, c onnects t o M / B . Reset SW : Push switch, connect to M/B x POWR LED: The system power LED (green), connect to M/B.
ZZ17-W2001-B 11 Optional Intrusion Switch The chassis could be built with intrusion switch, assembly in left side of chassis, when side cover removed the system will alarm for intrusion, if connected.
ZZ17-W2001-B 12 3.9 System Assembly When above steps are done, properly connect all accessories to the system. Then the user can start to install the O/S and required software to the system according to the instruction on the m anual of Motherboard. 4.
ZZ17-W2001-B 13 5. How to change versatile as Rackmount Chassis (5U) 1. T o remove top cover and bottom cover of chassis. 2. Screw in rack bracket and handles T ype A+ SI-0357 x 1 T ype A+ SI-0237 x 2.
ZZ17-W2001-B 14 3. Slide into EIA cabinet.
デバイスIBM YY-R5xxの購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
IBM YY-R5xxをまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはIBM YY-R5xxの技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。IBM YY-R5xxの取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。IBM YY-R5xxで得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
IBM YY-R5xxを既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はIBM YY-R5xxの不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、IBM YY-R5xxに関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちIBM YY-R5xxデバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。