IDEAL INDUSTRIESメーカーH CXSi 160の使用説明書/サービス説明書
ページ先へ移動 of 36
Installers guide to commercial central heating boilers BOILERS Concord CXSi 1 10/H-180/H INST ALLA TION MANUAL & SER VICING 157294-3.pmd 11/8/2005, 9:58 AM 1.
GENERAL 2 Concord CXSi/H - Installation & Servicing 157294-3.pmd 11/8/2005, 9:58 AM 2.
GENERAL 3 Concord CXSi/H - Installation & Servicing Boiler CXSi 1 10/H CXSi 120/H CXSi 140/H CXSi 160/H CXSi 180/H Number of sections 7 7 8 9 10 Flow connections Rc 65 mm (2 1/2 ") nominal bore. Flange to BS.4504 (PN6) Return tappings Rc 2 x 2 Maximum static head m.
GENERAL 4 Concord CXSi/H - Installation & Servicing CONTENTS Air Supply . ........................................................................ 9 Boiler Assembly - exploded view . ............................... 10 Boiler Clearances . .........
GENERAL 5 Concord CXSi/H - Installation & Servicing Boiler Size Cold Feed Open V ent CXSi 1 10/H 1" 1 1/4 " CXSi 120/H 1" 1 1/4 " CXSi 140/H 1" 1 1/4 " CXSi 160/H 1 1/4 "1 1/2 " CXSi 180/H 1 1/4 "1 1/2 " 1 W A TER CONNECTIONS Flow connection is 65mm (2 1/2 ") nominal bore flange to BS.
GENERAL 6 Concord CXSi/H - Installation & Servicing POSITION OF BOILER Minimum clearances required from walls or other fixed objects to allow for the free access of combustion air are shown in T able 3 above.
GENERAL 7 Concord CXSi/H - Installation & Servicing Note. This diagram does not show safety valves, water flow switches, etc., necessary for the safe operation of the system. 3 OPEN VENTED SYSTEMS - minimum static head requirements Particular reference should be made to BS.
GENERAL 8 Concord CXSi/H - Installation & Servicing Limitations of Intended Operating Environment These appliances are NOT suitable for installation where they will be exposed to the elements. A boiler room shall be constructed or adapted to meet the requirements of BS 6644.
GENERAL 9 Concord CXSi/H - Installation & Servicing CHIMNEY SYSTEM T o ensure the safe and satisfactory operation of the boiler then the chimney system (which may be common or individual, in the case of twin or multiple boiler installations) must be capable of the complete evacuation of combustion products at all times.
INST ALLA TION 10 Concord CXSi/H - Installation & Servicing 5 CONCORD CXS i BOILER ASSEMBL Y - Exploded view Legend 1 . Cleanout cover 2. Collector hood 3. Middle section 4. Flow header 5. Section alignment rings & 'O' rings. 6. Thermostat pocket.
INST ALLA TION 11 Concord CXSi/H - Installation & Servicing 6 BOILER SECTION ASSEMBLY The site assembled boiler is supplied in the following packages: ! Combustion chamber / manif old / burner assembly . ! Platew o rk package. ! Casing package . ! Controls box pac kage.
INST ALLA TION 12 Concord CXSi/H - Installation & Servicing 7 BOILER SECTION ASSEMBLY - continued 12. Offer the downdraught deflector to the projecting studs at the back of the combustion chamber and fix, using the nuts and washers provided. 13. Fit the insulation brackets with the screws provided to the downdraught deflector .
INST ALLA TION 13 Concord CXSi/H - Installation & Servicing 8 BOILER ASSEMBL Y 1. Fit the distributor tube into the selected return connection. Ensure that the tube flange aligns horizontally and that the 2 sealing gaskets are correctly assembled on the tube - refer to alignment notches.
INST ALLA TION 14 Concord CXSi/H - Installation & Servicing 11 CASING ASSEMBL Y Con 1906 Overheat 'stat reset b utton 1. Fit the support angle to the collector hood and fasten, using the M5 screws and washers. 2. Fit the front fixing bracket(s) to the collector hood and fasten, using the M5 screws and washers through the slotted holes.
INST ALLA TION 15 Concord CXSi/H - Installation & Servicing 12 CONTROL BOX 1. Make the 3 electrical connections from the overheat thermostat (fixed to the upper front framework) to the terminals m.
INST ALLA TION 16 Concord CXSi/H - Installation & Servicing 8 Con 1914 LH Burner Flame detector NOx duct 7 Con 1915 13 CONTROL BOX - continued 7. Run the flame detector lead through the clips on the front of the combustion chamber base tray and plug it into the flame detector electrode on the LH end burner .
INST ALLA TION 17 Concord CXSi/H - Installation & Servicing 14 ELECTRICAL CONNECTIONS T o gain access to the inside of the control box remove the 2 M4 screws, lift up the plastic front panel and lower .
INST ALLA TION 18 Concord CXSi/H - Installation & Servicing 15 INTERNAL WIRING v violet pk pink y/g yellow/green or orange y yellow w white br brown r red LEGEND b blue bk black TEMPERA TURE CONTR.
INST ALLA TION 19 Concord CXSi/H - Installation & Servicing 16 ZONES WITH BI-DIRECTIONAL MOT ORISED V AL VES IMPORT ANT T erminal L2 may control the appropriate pump(s) directly , provided that th.
INST ALLA TION 20 Concord CXSi/H - Installation & Servicing 19 COMMISSIONING AND TESTING GENERAL Check that all drain cocks are closed, that any stop valves fitted to the flow and return pipes are open and that the system has been filled and properly vented.
INST ALLA TION 21 Concord CXSi/H - Installation & Servicing CXSi CONCORD Con 1495 OFF OFF 6 5 4 3 2 1 L O C K O U T R E S E T BOILER ON BOIL ER ON OVERHEA T OVER HEA T LOCKOUT LOCK OUT LEGEND 1. Boiler thermostat knob. 2. Control box. 3. Mains inlet gas cock.
INST ALLA TION 22 Concord CXSi/H - Installation & Servicing 21 MANIFOLD GAS PRESSURE - CXSi 1 10/H-160/H ONL Y SETTING THE HIGH BURNER PRESSURE 1. Remove the dust cover from the adjustment screw in the bottom valve and gently screw the adjustment in fully .
INST ALLA TION 23 Concord CXSi/H - Installation & Servicing SETTING THE HIGH BURNER PRESSURE 1. T urn the boiler thermostat knob to OFF . 2. Undo the screws holding the electrical plug on the bottom gas valve and pull it off.
SERVICING 24 Concord CXSi/H - Installation & Servicing 25 ADJUSTMENT OF W A TER FLOW RA TE THROUGH THE BOILER When commissioning the heating/domestic hot water system the shunt pump must be adjust.
SERVICING 25 Concord CXSi/H - Installation & Servicing LH burner 27 SER VICING Caradon Ideal Limited does not accept any liability resulting from the use of unauthorised parts or the repair and servicing of appliances not carried out in accordance with the Company’ s recommendations and specifications.
SERVICING 26 Concord CXSi/H - Installation & Servicing 1. Remove the burner tray from the boiler , as described in Frames 27-28. 2. Each burner can be removed by lifting it at the back and pushing it backward to clear the injector .
SERVICING 27 Concord CXSi/H - Installation & Servicing 32 BURNER AND CONTROLS ASSEMBL Y - Exploded view - CXSi 180/H 1. Pull out the spring clip in the thermostat pocket in the flow header and pull out the overheat thermostat phial and capillary .
SERVICING 28 Concord CXSi/H - Installation & Servicing 35 CONTROL SENSOR 1. Lift off the casing top p anel and front panel. 2. T race the sensor lead to the pocket in the flow header, remove the spring clip and remove the sensor phial. 3. Undo and remove the 2 screws securing the control box front panel.
SERVICING 29 Concord CXSi/H - Installation & Servicing 39 COMBUSTION CHAMBER INSULA TION REPLACEMENT The insulation boards used in the combustion chambers of these products contain man-made fibres, refractory fillers, organic and inorganic binders and as such are deemed to be harmless to humans.
FAUL T FINDING FAUL T FINDING FAUL T FINDING FAUL T FINDING FAUL T FINDING FAUL T FINDING FAUL T FINDING 30 Concord CXSi/H - Installation & Servicing Before attempting any electrical fault finding.
FAUL T FINDING FAUL T FINDING FAUL T FINDING FAUL T FINDING FAUL T FINDING FAUL T FINDING FAUL T FINDING 31 Concord CXSi/H - Installation & Servicing Is there a spark at the electrode? Are the gas.
SHORT LIST OF P ARTS 32 Concord CXSi/H - Installation & Servicing When ordering spare parts please quote: 1. Boiler model 2. Boiler serial no. (refer to the data plate on the combustion chamber) 3. Boiler P .I. No. (refer to the data plate on the combustion chamber) 4.
SHORT LIST OF P ARTS 33 Concord CXSi/H - Installation & Servicing 45 Control box complete 1 155 641 46 Thermistor 1 154 816 47.1 PCB S4561B1047 (ignition) 1 154 814 48.1 PCB W41 15A1020 (Aquastat ) 1 154 815 56 Casing assembly complete ...........
NOTES Concord CXSi/H - Installation & Servicing 34 Concord CXSi/H - Installation & Servicing 157294-3.pmd 11/8/2005, 9:59 AM 34.
NOTES Concord CXSi/H - Installation & Servicing 35 Concord CXSi/H - Installation & Servicing 157294-3.pmd 11/8/2005, 9:59 AM 35.
Ideal Boilers , P .O. Box 103, National A ve, Kingston upon Hull, HU5 4JN. T elephone: 01482 492 251 Fax: 01482 448 858. Registration No. London 322 137. November 2005 UIN 157 294 A03 T echnical T raining Caradon Ideal Limited pursues a policy of continuing improvement in the design and performance of its products.
デバイスIDEAL INDUSTRIES H CXSi 160の購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
IDEAL INDUSTRIES H CXSi 160をまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはIDEAL INDUSTRIES H CXSi 160の技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。IDEAL INDUSTRIES H CXSi 160の取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。IDEAL INDUSTRIES H CXSi 160で得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
IDEAL INDUSTRIES H CXSi 160を既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はIDEAL INDUSTRIES H CXSi 160の不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、IDEAL INDUSTRIES H CXSi 160に関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちIDEAL INDUSTRIES H CXSi 160デバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。