JacuzziメーカーSUMMER RAINTM 2 WALL & 3 WALL WALK-IN SHOWER SYSTEMSの使用説明書/サービス説明書
ページ先へ移動 of 32
SUMMER RAIN ™ 2 W ALL & 3 W ALL W ALK-IN SHOWER SYSTEMS INST ALLA TION AND OPERA TING INSTRUCTIONS.
Note: This is a professional grade product. A knowledge of construction techniques, plumbing and electrical installation according to codes are required for proper installation and user satisfaction. We recommend that a licensed contractor perform the installation of all Jacuzzi Whirlpool Bath products.
Owner's Record Save These Instructions for Future Use. Date Purchased ____________________________________________________________ Purchased From _________________________________________________.
Important: Read complete instructions before beginning installation. Each unit arrives ready for installation, equipped with base, glass and associated hardware. Remove the unit from the carton. Retain the shipping carton until satisfactory inspection of the product has been made.
3 2 W ALL ROUGH-IN REFERENCE 60" 42-5/16" 33-3/4" 27-15/16" 84" 23" 21-1/2" FRONT VIEW TOP VIEW 1/2" RIGID COPPER PIPE UNDER BASE COLD SUPPL Y 1-1/2" TILE .
2 W ALL COMPONENT IDENTIFICA TION 4 HEX WRENCH (1) (PROVIDED) STRAIGHT GLASS W ALL MOUNTING POST STRAIGHT GLASS P ANEL MOUNTING POST CAP (2) 3 SCREWS AND 3 W ALL ANCHORS PER MOUNTING POST CURVED GLASS.
5 PRELIMINARY ROUGH-IN SPREAD MORT AR OR LEVELING COMPOUND ETC. EVENL Y OVER ENTIRE AREA STRAINER DRAIN ASSEMBLY SILICONE SEALANT SHOWER BASE RUBBER W A SHER FIBER W A SHER NUT APPL Y LUBRICANT The floor structure beneath the unit must be able to support a total weight of the unit and bather.
6 TIGHTEN SEALING NUT TOOL (INCLUDED) GAP TILE FLANGE INCORRECT SHIM STUD CORRECT TILE FLANGE STUD USE SCREWS (PROVIDED) USE SCREWS (PROVIDED) STEP 5 With a large screwdriver and the tool included with the drain, tighten the inside compression nut to seal the drain pipe connection.
7 2 W ALL BASE INST ALLA TION STUD CEMENT BOARD 1/4" MINIMUM GAP SILICONE SEALANT TILE TILE ADHESIVE 1/4" MINIMUM GAP SILICONE SEALANT STUD CEMENT BOARD 1/8" GAP GROUT STUD SHIM IF NECE.
8 STEP 1 Position the wall posts so the edge of the post is set back 3/4" (19 mm) in from the edge of the base STEP 2 Level both wall posts in their proper position and mark where screw holes are to be drilled. Drill 3/16" holes and secure with wall anchors and screws provided.
STEP 5 Place the tower onto base. Ensure the curved glass locates into the glazing channel. Install bolt but do not tighten. STEP 6 Insert tower support rail into glass panel rail but do not tighten at this time. 9 STEP 4 Slide the glass panel into the wall post.
STEP 11 Secure the rails. 10 AT T ACH RAIL BRACKET T O W ALL SECURE RAIL T O BRACKET (TURN CW TO TIGHTEN) MOVE COVER CAP OVER BRACKET STEP 9 Place the front rail and tower support rail against the walls. Check level and mark the position for the rail mounting bracket.
11 2 W ALL: T OWER, FIXED W ALL AND CURVED GLASS INST ALLA TION STEP 13A Insert fixed glass support rail into panel post and tighten set screw. GLASS P ANEL SUPPORT RAIL DRILL 1/8" PILOT HOLE AND SCREW M3.5X9.5 mm SCREW INTO HOLE STEP 13B Drill a 1/8" pilot hole into tower support rail using the hole in the glass panel support rail.
2 W ALL: TOWER, FIXED W ALL AND CUR VED GLASS INST ALLA TION TOWER COVER INSERT THIS SIDE FIRST TOWER COVER T OWER T OP PLA TE 12 STEP 16 Turn on water supply and check for leaks. Correct any leaks before installing tower cover. STEP 17 Install tower cover as shown.
13 Important: Read complete instructions before beginning installation. Each unit arrives ready for installation, equipped with base, glass and associated hardware. Remove the unit from the carton. Retain the shipping carton until satisfactory inspection of the product has been made.
3 W ALL ROUGH-IN REFERENCE 60" 42-5/16" 33-3/4" 27-15/16" 84" 23" 21-1/2" FRONT VIEW TOP VIEW 1/2" RIGID COPPER PIPE UNDER BASE COLD SUPPL Y 1-1/2" TILE FL.
3 W ALL COMPONENT IDENTIFICA TION HEX WRENCH (1) (PROVIDED) MOUNTING POST CAP 3 SCREWS AND 3 W ALL ANCHORS CURVED GLASS W ALL MOUNTING POST TOWER WITH PLUMBING, FIXTURES, MAGNETIC GASKET , BOTTOM PLA .
3 W ALL BASE INST ALLA TION The floor structure beneath the unit must be able to support a total weight of the unit and bather. Refer to the table under total weight. STEP 1 Provide an opening in the subfloor no less than 5" x 5" square. This opening should be located on the center lines of the shower base drain hole (See Product Chart).
3 W ALL BASE INST ALLA TION STEP 5 With a large screwdriver and the tool included with the drain, tighten the inside compression nut to seal the drain pipe connection. After drain is fully installed, test for proper drainage. If the shower base does not drain properly, rectify this condition before proceeding with the installation.
STEP 7 With a large screwdriver and the tool included with the drain, tighten the inside compression nut to seal the drain pipe connection. After drain is fully installed, test for proper drainage. If the shower base does not drain properly, rectify this condition before proceeding with the installation.
3 W ALL: T OWER AND CUR VED GLASS INST ALLA TION STEP 1 Position the wall post so the edge of the post is set back 3/4" (19 mm) in from the finish wall. STEP 2 Level the post in its proper position and mark where screw holes are to be drilled. Drill 3/16" holes and secure with wall anchors and screws provided.
3 W ALL: TOWER AND CURVED GLASS INST ALLA TION STEP 5 Insert support rails into brackets in top moulding of tower but do not tighten at this time. STEP 6 Slide mounting bracket covers and mounting brackets onto front rail and tower support rail.
3 W ALL: T OWER AND CUR VED GLASS INST ALLA TION STEP 9 Secure the rails. STEP 10 Tighten the tower base bolt. Two shut-off valves are provided. To hook up supply lines, unscrew valves from braided line. Using thread sealant, screw valve to stub outs at bottom of tower.
STEP 13 Turn on water supply and check for leaks. Correct any leaks before installing tower cover. STEP 14 Install tower cover as shown. Insert cover at top first. 3 W ALL: TOWER AND CURVED GLASS INST ALLA TION TOWER COVER INSERT THIS SIDE FIRST TOWER COVER T OWER T OP PLA TE STEP 15 Seal all around the base of tower with silicone sealant.
2 & 3 W ALL OPERA TION 23 STOP RELEASE T emperature V alve The temperature of the mixed water is adjusted by means of the graduated handle. This handle has a safety stop set at 100 ° F (38 ° C). T o increase the temperature, press the red button to release the stop and keep turning the handle.
24 2 & 3 W ALL MAINTENANCE To remove any lime scale from the shower head and body sprays , rub with your finger the outer ring of nozzles on the shower head and all nozzles on the body spray. To clean the foot temperature tester, unscrew the nozzle and back flush the wire mesh filter.
T OWER FIXTURES REP AIR P ARTS 1. C546000 Lock Nut, 1/2" NPT WP (5X) 2. G559000 Ring Compression SS (5X) 3. G560000 W asher Rubber (5X) 4. U546000 (Part of U547000) Nut T ransfer V alve, Chrome 5. U566000 Gasket, 1.41 ID X .063 Thick 6. U547000 V alve, Mixer/T ransfer Assembly 7.
T OWER PLUMBING REP AIR P ARTS 1. A944000 (9X) Spring Clamp, .625 OD Hose 2. U405000 L=31.0" T ubing, PVC Reinforced, 10mm Barb 3. U405000 L=5.5" T ubing, PVC Reinforced, 10mm Barb 4. A945000 (7X) Spring Clip, .75 OD Hose 5. U400000 FTG, Straight, 1/2" FTS X 10mm Barb 6.
1 2 3 4 5 (2X) 6 (2X) 7 (6X) 8 9 10 11 12 13 (6X) 15 17 16 18 20 21 14 (6X) 1. U134827 Rail Back W alk-in 2. U133827 Rail 2 W all W alk-in 3. U245827 Rail Assembly Walk-in 4. U149000 Bracket, Mounting Rail 5. U1 19827 W all Post, Panel 6. U138827 Cap, W all Post 7.
3 W ALL UNIT REP AIR P ARTS 1. U134827 Rail Back W alk-in 3 W all 2. U245827 Rail Assembly Walk-in 3 W all 3. U149000 Bracket, Mounting Rail 4. U1 19827 W all Post, Panel 5.
Jacuzzi Whirlpool Bath P .O. Drawer J W alnut Creek, CA 94596-9885 WARRANTY COVERAGE Jacuzzi Whirlpool Bath (the “Company”) offers the following express limited warranty to the original purchaser of any Jacuzzi Whirlpool Bath Designer Collection Bath Product (“unit”) who purchases the product for personal or single family use (“user”).
RESPONSIBILITIES OF OTHERS Inspecting the unit prior to installation is the responsibility of the installer or building contractor who acts on behalf of the user. They are responsible for ensuring the unit is free of defect or damage. Notices are placed on and in the unit and on the shipping carton advising the installer of this responsibility.
デバイスJacuzzi SUMMER RAINTM 2 WALL & 3 WALL WALK-IN SHOWER SYSTEMSの購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
Jacuzzi SUMMER RAINTM 2 WALL & 3 WALL WALK-IN SHOWER SYSTEMSをまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはJacuzzi SUMMER RAINTM 2 WALL & 3 WALL WALK-IN SHOWER SYSTEMSの技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。Jacuzzi SUMMER RAINTM 2 WALL & 3 WALL WALK-IN SHOWER SYSTEMSの取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。Jacuzzi SUMMER RAINTM 2 WALL & 3 WALL WALK-IN SHOWER SYSTEMSで得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
Jacuzzi SUMMER RAINTM 2 WALL & 3 WALL WALK-IN SHOWER SYSTEMSを既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はJacuzzi SUMMER RAINTM 2 WALL & 3 WALL WALK-IN SHOWER SYSTEMSの不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、Jacuzzi SUMMER RAINTM 2 WALL & 3 WALL WALK-IN SHOWER SYSTEMSに関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちJacuzzi SUMMER RAINTM 2 WALL & 3 WALL WALK-IN SHOWER SYSTEMSデバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。