APCメーカー10-40 KVA 380/400/415 Vの使用説明書/サービス説明書
ページ先へ移動 of 32
Inst allation Smart-UPS ® VT XR Battery Enclosure 10-40 kV A 380/400/415 V 10-30 kV A 208/220 V 10-30 kV A 200/208 V.
.
Content s Smart-UPS VT ® 10-40 kVA 380/4 00/415 V, 2 08/220 V, 200/208 V Battery Ins tallation i Safety .......... ............ ......... ................ ............... ............. .... 1 IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS . .
Smart-UPS VT ® 1 0-40 kVA 380/400/41 5 V, 208/220 V, 200 /208 V Bat tery Insta llation ii Final Mechanical Assemb ly ........ ......... ......... ................ 20 Level the Enc losures (L-shaped Floor Anchoring Brackets) and Instal l Batteries . .
1 Smart-UPS VT ® 10-40 k VA 380/400/415 V, 208/220 V, 200/208 V Battery Installation Safety IMPORT ANT SAFETY INSTRUCTIONS - S A VE THESE INSTRUCTIONS W arning: • ALL safety instructio ns in the Safety Sheet (9 90-2822) must be r ead, understoo d, and followed when instal ling the UPS s ystem.
Smart-UPS VT ® 10-40 kVA 380/400 /415 V, 208/220 V, 2 00/208 V Batte ry Installation 2 Prep are for Floor-Anchoring (optional) Note: If floor anchoring and batter y securing is required, rea d this section. If not, see “Pr epar e for Cables ” on page 5.
3 Smart-UPS VT ® 10-40 k VA 380/400/415 V, 208/220 V, 200/208 V Battery Installation Hole positions for a stand-alone UPS en closu re with L-shaped anchoring br ackets Note: Recommende d minimum number of scre ws per encl osure for the L-shaped bra ckets is four; one in each corner .
Smart-UPS VT ® 10-40 kVA 380/400 /415 V, 208/220 V, 2 00/208 V Batte ry Installation 4 Hole position s for up to four UPS unit s in p arallel with U-shaped an choring brackets. Note: Recommended minimum number of f loor screws for the below two configurati ons is 10.
5 Smart-UPS VT ® 10-40 k VA 380/400/415 V, 208/220 V, 200/208 V Battery Installation Prep are for Cables Remove the front panel 1. T urn th e scre w to t he right t o the un locked position . 2. Pul l the top of the front panel away from the UPS. 3. Lif t the fr ont panel free of the two slots at th e bottom o f the encl osure.
Smart-UPS VT ® 10-40 kVA 380/400 /415 V, 208/220 V, 2 00/208 V Batte ry Installation 6 Remove the cable landin g cover and bo ttom plates T o access the cable landing ar ea in the UPS and th e XR Battery Enclosu re(s), f ollow this procedure : 1.
7 Smart-UPS VT ® 10-40 k VA 380/400/415 V, 208/220 V, 200/208 V Battery Installation Remove the XR Battery Modu les Heavy: Use t wo people t o lift the batter y modules.
Smart-UPS VT ® 10-40 kVA 380/400 /415 V, 208/220 V, 2 00/208 V Batte ry Installation 8 Anchor the UPS and additional XR Battery or UPS Enclos ure( s) (op tiona l) Note: Enclos ures can be kept apart or assembled and anchored with in terconnection p lates and brackets : SUVTOP T004: 352 mm (13.
9 Smart-UPS VT ® 10-40 k VA 380/400/415 V, 208/220 V, 200/208 V Battery Installation Note: The U-s haped interconne ction bra ckets are 1-2 mm hig her than the openi ng below the enclosur e to inact ivate the cast ers. Ther efore, the enclo sure must be til ted when pla cing the U- shaped int erconnection br ackets un der the enclosur e.
Smart-UPS VT ® 10-40 kVA 380/400 /415 V, 208/220 V, 2 00/208 V Batte ry Installation 10 6. In sert the interco nnection plates betwee n the two enclosur es.
11 Smart-UPS VT ® 10-40 kV A 380/400/4 15 V, 208/220 V, 20 0/208 V Battery Ins tallation Run the Cables Connect Power in Inst allations wi th Busbars W arning: Befo re carry ing out t he ste ps b elow , you m ust foll ow th e T ota l Pow er O ff proce dure in the Oper ation manual.
Smart-UPS VT ® 10-40 kVA 380/400 /415 V, 208/220 V, 2 00/208 V Batte ry Installation 12 Inst a ll busbars 523 mm (20 .59 in) UPS Sys tem with the UPS placed to the l eft ( seen fr om the fro nt).
13 Smart-UPS VT ® 10-40 kV A 380/400/4 15 V, 208/220 V, 20 0/208 V Battery Ins tallation 523 m m (20. 59 in) U PS sys tem w ith the UP S pla ced to the righ t (seen from the front ).
Smart-UPS VT ® 10-40 kVA 380/400 /415 V, 208/220 V, 2 00/208 V Batte ry Installation 14 352 m m (13. 85 in) U PS sys tem w ith the UP S plac ed to th e righ t (seen fro m the fro nt).
15 Smart-UPS VT ® 10-40 kV A 380/400/4 15 V, 208/220 V, 20 0/208 V Battery Ins tallation 352 m m (13. 85 in) U PS sy stem w ith the UPS pla ced to the left (see n from the fron t).
Smart-UPS VT ® 10-40 kVA 380/400 /415 V, 208/220 V, 2 00/208 V Batte ry Installation 16 Connect Power in Inst allations wi th Cables Inst a ll power cables See “Recomme nded cable sizes” on p age 23 . Inst all po wer cables bet ween the U P S and t he XR Bat t ery En closure.
17 Smart-UPS VT ® 10-40 kV A 380/400/4 15 V, 208/220 V, 20 0/208 V Battery Ins tallation Inst all po wer cable s betw een two XR B attery Enclos ures. 1. Fee d the cable up throu gh the condu it box on XR1 or throu gh the transpar ent cable route br acket (not show n) to the cable connec tion area .
Smart-UPS VT ® 10-40 kVA 380/400 /415 V, 208/220 V, 2 00/208 V Batte ry Installation 18 Connect Co mmunicatio n Cables 1. Fee d the cable from pi n connect ion J10 6 in the UPS do w n throu gh the conduit (i f appliccable ). 2. Run t he cable u p into the XR condui t and conne ct it to pin con nection J200 in t he XR Batter y Enclosure .
19 Smart-UPS VT ® 10-40 kV A 380/400/4 15 V, 208/220 V, 20 0/208 V Battery Ins tallation Connect the EPO Connect the EPO to the UPS and the XR Battery Enclosure 1. Conne ct the EPO ( Em er gency Power Off) to J10 8 in the UPS a nd to J203 in the XR Bat tery Enclosure by guiding the cable th rough conduits .
Smart-UPS VT ® 10-40 kVA 380/400 /415 V, 208/220 V, 2 00/208 V Batte ry Installation 20 Final Mechanical Assembly Level the Enclosures ( L-shaped Floor Anchoring Bracket s) and Inst all Bat teries No.
21 Smart-UPS VT ® 10-40 kV A 380/400/4 15 V, 208/220 V, 20 0/208 V Battery Ins tallation Inst a ll battery-secu ring and floor-ancho ring brackets 1. In stall the batt eries by pushing them al l the way i nto th e enclosur e. 2. If requir ed, install t he battery s ecuring bra ckets t o hold the bat teries firml y in pla ce.
Smart-UPS VT ® 10-40 kVA 380/400 /415 V, 208/220 V, 2 00/208 V Batte ry Installation 22 Reinst all the Enclosure Plat es Reinstall the cable landing cov er plates and the bottom plates 1. Rei nstall t he cable landin g cover plates on the XR Battery Encl osure(s) 2.
23 Smart-UPS VT ® 10-40 kV A 380/400/4 15 V, 208/220 V, 20 0/208 V Battery Ins tallation S pecifications Bat ter y volt age and cu rrent Recommended cab le sizes Note: Power t erminal lug di ameter: minimum 6 mm (0.2 in). T orque value: 45 lbf-in/ 7 Nm.
Smart-UPS VT ® 10-40 kVA 380/400 /415 V, 208/220 V, 2 00/208 V Batte ry Installation 24 Post-Inst allation Checklist Use the f ollowing checkli st to ver ify that the XR Batt ery Enclos ure has been inst alled cor rectly: Note: If a problem occurs, cal l Customer Support (see the back cover).
.
.
.
11 / 2 0 0 9 990-1740D-001 *990-1740D-001* APC W orldwide Customer Support Customer s upport for this or any oth er APC product i s availab l e at no c harge in any of the followin g ways: • V isit the APC W eb site to a ccess docu m ents i n the APC Knowled ge Base and to s ubmit custo m er support requests.
デバイスAPC 10-40 KVA 380/400/415 Vの購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
APC 10-40 KVA 380/400/415 Vをまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはAPC 10-40 KVA 380/400/415 Vの技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。APC 10-40 KVA 380/400/415 Vの取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。APC 10-40 KVA 380/400/415 Vで得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
APC 10-40 KVA 380/400/415 Vを既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はAPC 10-40 KVA 380/400/415 Vの不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、APC 10-40 KVA 380/400/415 Vに関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちAPC 10-40 KVA 380/400/415 Vデバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。