MarathonメーカーRJ-100SCの使用説明書/サービス説明書
ページ先へ移動 of 39
PLA Y IT SAFE! OPERA TIONAL, MAINTENANCE, AND INST ALLA TION MANUAL FOR RJ-88SC RJ-100SC RJ-250SC RJ-250VL Includes HT (Hydraulic T ailgate) Units and SL (StreamLine, Liquid Removal) Units RAM-JET SELF-CONT AINED COMP ACT OR CONT AINER VERNON, AL • F A YETTE, AL YERINGTON, NV • CLEARFIELD, P A Marathon Equipment Company • OMI Manual No.
CONTENTS SECTION 1 - Operation Introduction ............................................................................. ..................... 1-1 Specifications ........................................................................................
1 OPERATION INTRODUCTION 1-1 THANK YOU FOR PURCHASING A MARATHON SELF-CONTAINED COMPACTOR/CONTAINER. This product is designed to give you reliable service and superior performance for years to come.
1 OPERATION SPECIFICATIONS 1-2 SIDE VIEW “A”, Clear Top Opening “B” “C” “D” “E” Fire Port - Each Side Model 88SC 100SC 250SC 250VL “A”, Clear Top Opening 30 1/2 x 48 35 x 60 40.5 x 58 35 x 60 (L x W) “B” 70 76 1/8 68 76 1/2 “C” 42 49 5/8 52 1/2 51 1/2 “D” (max.
1 OPERATION PRE-OPERATION INSTRUCTIONS 1-3 NEVER ENTER ANY PART OF THE COMPACTOR UNLESS THE DISCON - NECT SWITCH HAS BEEN LOCKED-OUT AND TAGGED-OUT. See Lock- Out & Tag-Out instructions in the Maintenance section. Before starting the compactor, be sure no one is inside.
1 OPERATION OPERATOR STATION 1-4 OPERATOR STATION FOR 88SC, 100SC, 250SC, & 250 VL KEYED START SWITCH REVERSE EMERGENCY STOP KEYED START SWITCH - This switch requires a key for operation. Insert the key and turn clockwise to the start position. Depress and hold the key for one to two seconds and release.
1 OPERATION OPERATING INSTRUCTIONS FOR RJ-88SC, RJ-100SC, & RJ-250SC 1-5 First, place the material to be discarded into the compactor. Note: If you are loading the compactor through a door or gate, close it before starting the compactor.
1 OPERATION OPERATING INSTRUCTIONS FOR RJ-250VL 1-6 First, place the material to be discarded into the compactor. Note: If you are loading the compactor through a door or gate, close it before starting the compactor. Refer to “Optional Loading Configurations” in the Decal Placement section to determine how your compactor is set up.
SUSTAINED MANUAL PRESSURE CONTROL BUTTON (Hold-To-Run, Release- To-Stop) - This option requires the compactor operator to remain at the push button station while the compactor is in use. Actuation requires depressing the "Hold-To- Run" and "Start" buttons.
WARNING DECAL REQUIREMENTS When your compactor leaves the factory, several WARNING DECALS are installed for protection. These labels are subject to wear and abuse due to the nature of the refuse handling operation. THESE DECALS MUST BE MAINTAINED . Additional decals may be purchased from your distributor or from Marathon Equipment Company.
1 OPERATION DECAL PLACEMENT for RJ-88SC, RJ-100SC, RJ-250SC, or RJ-250VL 1-9 REMOTE POWER UNIT.
OPTIONAL LOADING CONFIGURATIONS 1 OPERATION 06-0040 ACCESS GATE & HOPPER EACH OUTSIDE WALL DOCK 06-0039 06-0039 06-0039, 06-0052 EACH INSIDE WALL DOGHOUSE THRU-THE-WALL SECURITY CHUTE 06-0039 06-0.
1 OPERATION ADDITIONAL DECALS and DECAL PLACEMENT for HYDRAULIC TAILGATE (HT) UNITS 1-11 In addition to the decals and their placement specified on the previous pages, the self-contained units with the hydraulic tailgate option require the following decals located as shown below.
LOCK-OUT & TAG-OUT INSTRUCTIONS 2-1 ELECTRICAL: The motor control panel contains high voltage components. Only authorized service person - nel should be allowed inside the panel. Authorized ser - vice personnel should be allowed inside the panel only after the compactor has been locked-out and tagged- out.
Check external hoses for chafing, rubbing, or other deterioration and damage. Check for any obvious unsafe conditions in the compactor area. Check oil level in hydraulic reservoir. Level should be 3/4 of sight gauge. Clean out or wash out debris from behind compactor ram.
When the hydraulic cylinders used in the RJ-88SC, RJ-100SC, RJ-250SC, and RJ- 250VL are fully extended or retracted, they bypass internally. This makes it impossi - ble for the hydraulic system to reach relief pressure. Follow the recommendations below for proper pressure setting.
2 MAINTENANCE PROCEDURES 2-4 RAM CONTROL TIMER ADJUSTMENT Determine the cycle time of your machine. This can be found in the “CHARTS” section of this manual under “TIMER SETTINGS”.
MULTI-CYCLE TIMER ADJUSTMENT - OPTION Determine the cycle time of your machine. This can be found in the CHARTS section of this manual under TIMER SETTINGS. Next multiply the cycle time by the number of cycles the machine should run and subtract one fourth of the cycle time.
STANDARD SYSTEM OPERATING CHARACTERISTICS, 5 hp & 10 hp The system uses special cylinders to move the ram and two timers to control the opera - tion of the ram. When the hydraulic cylinders used in the RJ-88SC, RJ-100SC, RJ- 250SC, and RJ-250VL are fully extended or retracted, they bypass internally.
2 MAINTENANCE TAILGATE SEAL REPLACEMENT 2-7 FRONT VIEW - DOOR SEAL ON DOOR NEW SEAL A PRY BAR A SECTION A-A NEW SEAL SEAL RETAINER - PRY SLIGHTLY UPWARD SO NEW SEAL CAN BE INSERTED USE A PLASTIC OR RU.
2 MAINTENANCE CHARTS 2-8 TIMER SETTINGS RAM STOP REAR RAM STOP FORWARD MODEL NO. T1 T2 T1 T2 RJ-88SC 27 17 17 27 RJ-100SC 21 16 16 21 RJ-250SC 19 13 13 19 RJ-250VL 21 16 16 21 Includes HT units and SL units. FUSES AND CIRCUIT BREAKERS MOTOR FULL DUAL ELEMENT CIRCUIT SERVICE SIZE VAC LOAD FUSE BREAKER DISCONNECT AMP.
2 MAINTENANCE MOTOR STARTERS AND HEATER ELEMENTS MOTOR VOLTAGE STARTER HEATER ELEMENT SIZE SIZE A-B JOSLYN CLARK 5 HP, 1 PH 208 2 W-61 2452 230 2 W-60 2451 5 HP, 3 PH 208 1 W-55 2447 230 1 W-55 2446 4.
2 MAINTENANCE PARTS LIST 2-10 PART # PART DESCRIPTION 88SC 100SC 250SC 250VL 88HT 250HT 02-0050 SUCTION FILTER X X X X X X 02-0157 DIRECTIONAL VALVE X X X X X X 02-0184 CHECK VALVE X X X X 02-0197 BRE.
2 MAINTENANCE MOTOR CONTROL PANEL - TYPICAL 2-11 * Motor Starter brand and size determined by model number and voltage. *.
2 MAINTENANCE POWER UNIT - STANDARD 5 HP 2-12 DETAIL B DETAIL A DETAIL A DETAIL B DRAIN PLUG.
2 MAINTENANCE POWER UNIT - STANDARD 10 HP 2-13.
2 MAINTENANCE HYDRAULIC SCHEMATIC - TYPICAL 2-14 * SINGLE CYLINDER UNIT SHOWN. FOR DUAL CYLINDER UNITS, CONNECT IDENTICAL CYLINDER IN PARALLEL..
2 MAINTENANCE TROUBLE-SHOOTING CHART 2-15 PROBLEM UNIT WILL NOT START UNIT WILL NOT CONTINUE RUNNING WHEN START BUTTON IS RELEASED MOTOR RUNS BUT RAM DOES NOT MOVE NORMALLY UNIT WILL NOT REVERSE CAUSE.
2 MAINTENANCE TROUBLE-SHOOTING CHART 2-16 PROBLEM PUMP MAKES NOISE-SOUNDS LIKE GRAVEL PUMP SHAFT SEAL LEAKING EXCESSIVE HEAT RAPID WEAR ERRATIC OPERATION OVERLOADS TRIP FREQUENTLY CAUSE ( 1 ) Partly c.
REVIEW THIS MANUAL BEFORE MAKING THE INSTALLATION. STUDY THE JOB - SITE AND INSTALLATION REQUIREMENTS CAREFULLY TO BE CERTAIN ALL NECESSARY SAFEGUARDS AND OR SAFETY DEVICES ARE PROVIDED TO PROTECT ALL PERSONNEL AND EQUIPMENT DURING THE INSTALLATION AND AS A COMPLETED SYSTEM.
If the appropriate accessories are ordered from Marathon Equipment Co., the com - pactor/container will be furnished with either a four-sided hopper or a three-sided hop - per with a hinged gate. THESE ACCESSORIES SHOULD NOT BE ALTERED AS THEY ARE MANUFACTURED IN ACCORDANCE WITH THOSE STANDARDS WHICH PRE - VAIL AT THE TIME OF MANUFACTURE.
A lockable fused disconnect switch (customer furnished) must be installed and be within sight of the compactor motor control panel location, not to exceed 50'0" from the com - pactor. This fused disconnect switch should be sized in accordance with the compactor (see Fuse and Circuit Breaker Chart).
If a remote operator station is furnished, it will be factory wired using Sealtite. If it is necessary to disconnect it from the wires (to install the operator station inside a build - ing), exercise care that these wires are reconnected as originally furnished.
3 INSTALLATION THROUGH-THE-WALL POWER UNIT INSTALLATION 3-5 If the remote power unit is to be mounted through-the-wall, the following list of material and diagram is the suggested method.
4 HAULER INFORMATION HAULER INSTRUCTIONS - GENERAL 4-1 Before hauling to the landfill: Disconnect all hoses and electrical connections (if applicable) between the power unit and the compactor. Make sure they are laid in an area where they will not get damaged.
4 HAULER INFORMATION HAULER INSTRUCTIONS - DOOR/LATCH OPERATION 4-2 LATCH SIDE VIEW OF CONTAINER LATCH ASSEMBLY ACTUATED BY RATCHET CONTAINER DOOR RATCHET FOR OPENING AND CLOSING THE LATCH ASSEMBLY SAFETY CHAIN - ALWAYS FASTEN CHAIN IN KEYHOLE WHEN DOOR IS CLOSED.
4 HAULER INFORMATION HAULER INSTRUCTIONS - HYDRAULIC TAILGATE OPERATION (FOR OPTIONAL HT UNITS) 4-3 06-0105 WHEN LIFTED DANGER STAND CLEAR OF TAILGATE CAUTION STAND CLEAR OF TAILGATE WHEN LIFTED. TRUCK MUST BE ON FIRM, LEVEL SURFACE BEFORE LIFTING TAILGATE.
4 HAULER INFORMATION LOCKING PIN RETRACTED MAINTENANCE BAR POSITION COLLAR POSITION COLLAR EXTENDED MAINTENANCE BAR DRAWING B DRAWING A LOCKING PIN EXPLODED VIEW DRAWING A INSTRUCTIONS FOR USING MAINTENANCE BAR. 1. Lower tailgate approximately 24” between container bottom and compactor tailgate.
4 HAULER INFORMATION HAULER INSTRUCTIONS - LIQUID REMOVAL (FOR OPTIONAL SL UNITS) 4-5 The Ram Jet Self-Contained Streamline compactor/containers are designed with an internal drain system for liquid removal, ported to each corner of the machine. The unit comes standard with one ball valve.
デバイスMarathon RJ-100SCの購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
Marathon RJ-100SCをまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはMarathon RJ-100SCの技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。Marathon RJ-100SCの取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。Marathon RJ-100SCで得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
Marathon RJ-100SCを既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はMarathon RJ-100SCの不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、Marathon RJ-100SCに関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちMarathon RJ-100SCデバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。