ParaBodyメーカー426103の使用説明書/サービス説明書
ページ先へ移動 of 45
1 Part # 6860801 Revision: 10/12/99 426103 ELASTIC CORD CONVERSION KIT.
2 P AR TS LIST PA R T # 3102903 6122702 3201501 6271801 3118701 KEY 1 2 3 4 5 QTY 2 4 4 4 4 KEY 6 7 8 9 10 PA R T # 3102501 3102802 3102701 6535001 3102909 DESCRIPTION 3/8” W ASHER 3/8” LOCK NUT 3.
3 STEP 3 • Remove the three 1/4” CAP NUTS and each TENSION CORD from the TOP BOOM as shown in FIGURE 3. FIGURE 3 CORD CAP NUT • Remove the three TENSION CORDS from the D-RING by removing the three KEYHOLE CLEVIS, CLEVIS PINS, and COTTER PINS as shown in 4.
FIGURE 5 STEP 5 • Remove the 3/8 X 2” BOL T , two 3/8” W ASHERS, one 2-7/8” L-BRACKETS, one 4-1/2” PULLEY , and one 3/8” LOCK NUT from the upper flat on the BASE as shown in FIGURE 5.
FIGURE 7 STEP 7 • Assemble two 3/8” HEX NUTS (8), two SWIVEL SNAP (3), and two 3/8” LOCK NUTS (7) to the 3/8” THREADED SHAFT (9) as shown in FIGURE 7. BASE 5 10 9 8 HEX NUT 3 7 • Position two 3/8 X 1/2” SP ACERS (2) inside the bracket on the BASE and slide one 3/8” THREADED SHAFT (9) through the bracket.
FIGURE 8 STEP 8 FIGURE 9 STEP 9 6 • Remove the 3/8 X 2-1/4” BOL T , two 3/8” W ASHERS, one 3/8” LOCK NUT , and 3-1/2” PULLEY from the bracket on the T OP BOOM as shown in FIGURE 8.
7 FIGURE 10 STEP 10 STEP 1 1 • Assemble three 72” ELASTIC CORDS to the KEYHOLE CLEVIS as shown in FIGURE 11. • Position two 3/8 X 1/2” SP ACERS (2) inside the rear bracket of the TOP BOOM and slide one 3/8” THREAD SHAFT (9) through th e bracket.
FIGURE 12 STEP 12 8 TOP BOOM • Assemble the 22” ELASTIC CORD (4) from the PRESS CABLE around the 2” PULLEY (5) in the TOP BOOM as shown in FIGURE 12.
FIGURE 13 STEP 13 9 TOP BOOM • Assemble the 22” ELASTIC CORD (4) from the LEG CABLE around the 2” PULLEY (5) in the TOP BOOM as shown in FIGURE 13.
FIGURE 14 STEP 14 10 TOP BOOM • Assemble the 22” ELASTIC CORD (4) from the LA T CABLE around the 2” PULLEY (5) in the T OP BOOM as shown in FIGURE 14.
FIGURE 15 STEP 15 11 • Assemble the ELASTIC CORD (4) from the PRESS CABLE to the SWIVEL SNAP (3) on the BASE as shown in FIGURE 15. 3 BASE 4 PRESS CABLE.
FIGURE 16 STEP 16 12 • Assemble the ELASTIC CORDS (4) from the LA T & LEG CABLES to the corresponding SWIVEL SNAPS (3) on the BASE as shown in FIGURE 16.
13 STEP 18 FIGURE 17 STEP 17 3/8” X 1” BUTTON HEAD CAP SCREW 3/8” X 1” BUTTON HEAD CAP SCREW SHROUD FIGURE 18 • SECUREL Y attach the bottom of the front SHROUD (with label) & rear SHROUD to the T OP BOOM using the four previously removed 3/8” X 1” BUTTON HEAD CAP SCREWS.
• If the 445 WEIGHT ST ACK OPTION IS INST ALLED PROCEED T O P AGE 27. • If the 832 LEG PRESS OPTION & 445 WEIGHT ST ACK OPTION ARE INST ALLED PROCEED T O P AGE 35. 425103 with 832 LEG PRESS OPTION INST ALLED 14 STEP 3 • Remove the 1/4” CAP NUTS and each TENSION CORD from the TOP BOOM as shown in FIGURE 3.
FIGURE 4 STEP 4 • Remove the TENSION CORDS, CLEVIS PINS and COTTER PINS as shown in FIGURE 4. 15 D-RING KEYHOLE CLEVIS CLEVIS PIN COTTER PIN.
FIGURE 5 STEP 5 • Remove two 3/8 X 2” BOL TS, four 3/8” W ASHERS, two 2-7/8” L-BRACKETS, two 4-1/2” PULLEYS, and two 3/8” LOCK NUTS from the upper flats on the BASE as shown in FIGURE 5.
FIGURE 7 STEP 7 • Remove one 3-1/2” PULLEY , one 3/8 X 2” BOL T , two 3/8” W ASHERS and one 3/8” LOCK NUT from the BASE as shown in FIGURE 7.
FIGURE 9 STEP 9 FIGURE 10 STEP 10 18 • Remove the 3/8 X 2-1/4” BOL T , two 3/8” W ASHERS, one 3/8” LOCK NUT , and 3-1/2” PULLEY from the bracket on the T OP BOOM as shown in FIGURE 9.
19 FIGURE 1 1 STEP 1 1 STEP 12 • Position two 3/8 X 1/2” SP ACERS (2) inside the rear bracket of the TOP BOOM and slide one 3/8” THREAD SHAFT (9) through th e bracket.
FIGURE 14 STEP 14 20 TOP BOOM • Assemble the 72” ELASTIC CORD (4) from the PRESS CABLE around the 2” PULLEY (5) in the TOP BOOM as shown in FIGURE 14. 4 LEG EXT CABLE LA T CABLE PRESS CABLE 5 STEP 13 • Assemble four 72” ELASTIC CORDS to the KEYHOLE CLEVIS as shown in FIGURE 13.
STEP 15 21 • Assemble the 72” ELASTIC CORD (4) from the LEG PRESS CABLE around the 2” PULLEY (5) in the TOP BOOM as shown in FIGURE 15. FIGURE 15 TOP BOOM 4 LEG EXT CABLE LA T CABLE PRESS CABLE .
FIGURE 16 STEP 16 TOP BOOM • Assemble the 72” ELASTIC CORD (4) from the LEG EXT CABLE around the 2” PULLEY (5) in the TOP BOOM as shown in FIGURE 16.
STEP 17 23 • Assemble the 72” ELASTIC CORD (4) from the LA T CABLE around the 2” PULLEY (5) in the T OP BOOM as shown in FIGURE 17. FIGURE 17 TOP BOOM 4 5 LEG EXT CABLE LA T CABLE PRESS CABLE LE.
FIGURE 18 STEP 18 24 • Assemble the ELASTIC CORDS (4) from the PRESS CABLE and the LEG PRESS CABLE to the corresponding SWIVEL SNAPS (3) on the BASE as shown in FIGURE 18.
FIGURE 19 STEP 19 25 • Assemble the ELASTIC CORDS (4) from the LA T & LEG CABLES to the corresponding SWIVEL SNAPS (3) on the BASE as shown in FIGURE 19.
26 STEP 21 FIGURE 20 STEP 20 3/8” X 1” BUTTON HEAD CAP SCREW 3/8” X 1” BUTTON HEAD CAP SCREW SHROUD FIGURE 21 • SECUREL Y attach the bottom of the front SHROUD (with label) & rear SHROUD to the T OP BOOM using the four previously removed 3/8” X 1” BUTTON HEAD CAP SCREWS.
• If the 832 LEG PRESS OPTION & 445 WEIGHT ST ACK OPTION ARE INST ALLED PROCEED T O P AGE 35. 425103 with 445 WEIGHT ST ACK OPTION 27 STEP 3 • Remove the 1/4” CAP NUTS and each TENSION CORD from the TOP BOOM as shown in FIGURE 3.
28 FIGURE 4 STEP 4 • CAREFULL Y remove the TENSION CORDS by pulling the COTTER PIN and CLEVIS PIN from the KEYHOLE CLEVIS as shown in FIGURE 4. KEYHOLE CLEVIS CLEVIS PIN LEG CURL/EXTENSION CABLE (67247) LA T CABLE (67248) COTTER PIN D-RING • Please discard the previously removed PRESS TENSION CORDS, COTTER PINS and CLEVIS PINS.
FIGURE 7 STEP 7 • Assemble two 3/8” HEX NUTS (8), two SWIVEL SNAP (3), and two 3/8” LOCK NUTS (7) to the 3/8” THREADED SHAFT (9) as shown in FIGURE 7. BASE 29 10 9 8 HEX NUT 3 7 • Position two 3/8 X 1/2” SP ACERS (2) inside the bracket on the BASE and slide one 3/8” THREADED SHAFT (9) through the bracket.
FIGURE 8 STEP 8 30 • Remove the 3/8 X 2-1/4” BOL T , two 3/8” W ASHERS, one 3/8” LOCK NUT , and 3-1/2” PULLEY from the bracket on the T OP BOOM as shown in FIGURE 8.
FIGURE 1 1 STEP 1 1 31 TOP BOOM • Assemble the 72” ELASTIC CORD (4) from the LA T CABLE around the 2” PULLEY (5) in the T OP BOOM as shown in FIGURE 1 1. 4 LEG EXT CABLE LA T CABLE 5 STEP 10 • Assemble two 72” ELASTIC CORDS to the KEYHOLE CLEVIS as shown in FIGURE 10.
FIGURE 12 STEP 12 32 TOP BOOM • Assemble the 72” ELASTIC CORD (4) from the LEG EXT CABLE around the 2” PULLEY (5) in the TOP BOOM as shown in FIGURE 12.
FIGURE 13 STEP 13 33 • Assemble the ELASTIC CORDS (4) from the LA T & LEG EXT CABLES to the corresponding SWIVEL SNAPS (3) on the BASE as shown in FIGURE 13.
34 STEP 15 FIGURE 14 STEP 14 3/8” X 1” BUTTON HEAD CAP SCREW 3/8” X 1” BUTTON HEAD CAP SCREW SHROUD FIGURE 15 • SECUREL Y attach the bottom of the front SHROUD (with label) & rear SHROUD to the T OP BOOM using the four previously removed 3/8” X 1” BUTTON HEAD CAP SCREWS.
• If the 445 WEIGHT ST ACK OPTION IS INST ALLED PROCEED TO P AGE 27. • If the 832 LEG PRESS OPTION IS INST ALLED PROCEED T O P AGE 14. 425103 with 832 LEG PRESS OPTION & 445 WEIGHT ST ACK OPTION INST ALLED 35 STEP 3 • Remove the 1/4” CAP NUTS and each TENSION CORD from the TOP BOOM as shown in FIGURE 3.
FIGURE 4 STEP 4 • Remove the TENSION CORDS, CLEVIS PINS and COTTER PINS as shown in FIGURE 4. 36 D-RING KEYHOLE CLEVIS CLEVIS PIN COTTER PIN.
FIGURE 5 STEP 5 • Remove two 3/8 X 2” BOL TS, four 3/8” W ASHERS, two 2-7/8” L-BRACKETS, two 4-1/2” PULLEYS, and two 3/8” LOCK NUTS from the upper flats on the BASE as shown in FIGURE 5.
FIGURE 7 STEP 7 • Remove one 3-1/2” PULLEY , one 3/8 X 2” BOL T , two 3/8” W ASHERS and one 3/8” LOCK NUT from the BASE as shown in FIGURE 7.
FIGURE 9 STEP 9 39 • Remove the 3/8 X 2-1/4” BOL T , two 3/8” W ASHERS, one 3/8” LOCK NUT , and 3-1/2” PULLEY from the bracket on the TOP BOOM as shown in FIGURE 9.
FIGURE 1 1 STEP 1 1 40 TOP BOOM 3/8” X 1” 10 6 5 7 3/8” LOCK NUT • SECUREL Y assemble one 3/8 X 1” BOL T (10), one 3/8” W ASHER (6), one 2” PULLEY (5) and one 3/8” LOCK NUT (7) to the bracket on the TOP BOOM as shown in FIGURE 11.
FIGURE 15 STEP 15 TOP BOOM • Assemble the 22” ELASTIC CORD (4) from the LEG EXT CABLE around the 2” PULLEY (5) in the TOP BOOM as shown in FIGURE 15. 4 5 LEG EXT CABLE LA T CABLE 41 LEG PRESS CABLE STEP 14 • Assemble three 72” ELASTIC CORDS to the KEYHOLE CLEVIS as shown in FIGURE 14.
FIGURE 16 STEP 16 TOP BOOM • Assemble the 72” ELASTIC CORD (4) from the LA T CABLE around the 2” PULLEY (5) in the T OP BOOM as shown in FIGURE 16.
FIGURE 17 STEP 17 43 • Assemble the ELASTIC CORDS (4) from the PRESS CABLEand the LEG PRESS CABLE to the coresponding SWIVEL SNAPS (3) on the BASE as shown in FIGURE 17.
FIGURE 18 STEP 18 44 • Assemble the ELASTIC CORDS (4) from the LA T & LEG CABLES to the corresponding SWIVEL SNAPS (3) on the BASE as shown in FIGURE 18.
45 STEP 20 FIGURE 19 STEP 19 3/8” X 1” BUTTON HEAD CAP SCREW 3/8” X 1” BUTTON HEAD CAP SCREW SHROUD FIGURE 20 • SECUREL Y attach the bottom of the front SHROUD (with label) & rear SHROUD to the T OP BOOM using the four previously removed 3/8” X 1” BUTTON HEAD CAP SCREWS.
デバイスParaBody 426103の購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
ParaBody 426103をまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはParaBody 426103の技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。ParaBody 426103の取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。ParaBody 426103で得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
ParaBody 426103を既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はParaBody 426103の不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、ParaBody 426103に関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちParaBody 426103デバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。