ParaBodyメーカー445103の使用説明書/サービス説明書
ページ先へ移動 of 14
Serious Ste~ 445103 425 SECOND STACK OPTION ASSEMBLY INSTRUCTIONS Part # 6747401 I l~evision: 09/25/97.
NOTE: BOLT LENGTH IS MEASURED FROM THE UNDERSIDE OF THI~ HEAD OF THE BOLT. Iliiiii!!1 BOLT LENGTH BOLT LENGTH RULER: 2 4 5 6 [IMPORTANT NOTES[ WELCOME TO THE WORLD OF Seeiou~ Please note: * Thank you for purchasing the Parabody 445103 Second Stack Option.
I 2 3 4 5 6 8 9 PART# DESCRrPT~Or~ 6523401 GUIDE ROD 6266001 WEIGHT STACK SHAFT ’" 6375902 1-i/4 SQ. X 4-7/8 ~E 671~601 ~ PLA~BLA~ 6747501 P~SS-S~ACK ~LE 3’116101 4~’i/~" P~LEY *h~4o~ .
PLATE CABLE FIGURE 3 STEP 3 ¯ Unscrew the threaded ends of the HEAD PLATE CABLE from the WEIGHT STACK SHAFT & the D-RING and remove HEAD PLATE CABLE. The HEAD PLATE CABLE will be used later. See FIGURE 3. (NOTE: Remove pulleys for ease of removal.
PRESS TENSION CORD i t COTTERPIN~ KEYI-IOLE CLEVIS,,~~ PRESS C (67249) LAT CABLE (667248) LEG CURL/EXTENSION CABLE (67247) FIGURE 4 STEP 4 ¯ CAREFULLY remove the PRESS TENSION CORD and PRESS CABLE by pulling the COTTER PIN and CLEVIS PIN from the KEYHOLE CLEVIS as shown in FIGURE 4.
FIGURE 5 (67249) PRESS CABLE (67249) STEP 5 ¯ Carefully remove and discard the PRESS CABLE as shown in FIGURE 5. ~3/8" LOCK NUT 3-1/2" P~LEY ~ ~3/8 X 2-1/4" BOLT FIGURE 6 Remove the existing 3-1/2" PULLEY, 3/8 X 2-1/4" BOLT, 3/8" WASHERS, and 3/8" LOCK NUTS from the TOP BOOM.
" ~" "-. ~ ~ TOP BOOM @ ~ 318 X 2-3/4" FIGURE 7 STEP 7 ¯ LOOSELY assemble one 4-1/2" PULLEY (6) to the TOP BOOM using one 3/8 X 2-3/4" BOLT (13), two 3/8" FLANGE SPACERS (12), and one 3/8" LOCK NUT (11).
FIGURE 9 PRESS-STACK CABLE (67475) PRESS-STACK CABLE (67475) STEP 10 ¯ Route the PRESS-STACK CABLE (5) around the pulleys and 1-brackets as shown in STEP 9, (Remove pulleys for ease ins tal- lationo).
STEP 12 ¯ Insert two WEIGHT PLATE BUSHINGS (17) into the "PARABODY" side of each of the f’tfteen WEIGHT PLATES (16) as shownin FIGURE 11. FIGURE 11 FIGURE 12 STEP 12 BOOM ¯ ---- LOOSEN LOOSEN the bolts holding the TOP BOOM to the UPRIGHTS.
X 1-114" FIGURE 13 BASE ;TEP 13 ¯ Insert four CAP PLUGS (9) into the top and bottom ends of the GUIDE RODS (1) as shown in FIGURE13. ¯ SECURELY assemble the WEIGHT STACK SHAFT (2) to the I-[EAD PLATE (4) using one 3/8 X 1-1/4" BOLT (14) and one WASHER (10).
(NOTE: Make; sure LAT CABLE runs over top of bolts in TOP BOOM.) FIGURE 14 STEP 14 ¯ CAREFULLY lift ortilt the TOP BOOM and insert all GUIDE RODS into the bushings. See FIGURE 14. ¯ With the GLT[DE RODS (1) securely held in the TOP BOOM. Tighten all TOP BOOM connections.
STEP 15 ~) ¯ Screw one of the threaded ends of the previously removed HEAD PLATE CABLE approximately I" into the end of the WEIGHT STACK SHAFT. See FIGURE 15. FIGURE 15 HEAD PLATE CABLE (67250) STEP 16 ¯ Route the thread end of HEAD PLATE CABLE up and over the PULLEYS in the TOP BOOM above the WEIGHT STACK.
FIGURE 17 STEP 17 If the 435103 LEG PRESS ADAPTER KIT is not installed the rear SHROUD opening must be removed. AI~ply pressure to the bottom of the SHROUD where the "V" groove is and carefuly remove the weight stack opening on the plastic SHROUD as show~.
FIGURE 18 FRONT 3/8" X 1" BUTI’ON HEAD CAP SCREW STEP 18 ¯ SECURELY attach the four previously removed 3/8" X 1" BUTTON HEAD CAP SCREWS from the top of the front SHROUD & rear SHROUD.
デバイスParaBody 445103の購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
ParaBody 445103をまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはParaBody 445103の技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。ParaBody 445103の取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。ParaBody 445103で得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
ParaBody 445103を既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はParaBody 445103の不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、ParaBody 445103に関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちParaBody 445103デバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。