PB HeatメーカーWBV Seriesの使用説明書/サービス説明書
ページ先へ移動 of 26
WB V/WV Boilers Series Oil Installation, Operation & Maintenance Manual As an E NERGY S TA R ® Partner, PB Heat, LLC has determined that certain firing rates of this product meet the E NERGY S TA R ® guidelines for energy efficiency .
USING THIS MANUAL 1 A . INST ALLA TION CLEARANCE . . . . . . . . . . . . .1 B . SPECIAL A TTENTION BOXES . . . . . . . . . . . .1 1. PREINST ALLA TION 2 A . CLEARANCES . . . . . . . . . . . . . . . . . . . . . . . .2 B . AIR FOR COMBUSTION AND VENTILA TION .
1 A. INST ALLA TION CLEARANCE F ollow the installation instructions provided in this manual in the order shown. The order of these instructions has been set in order to provide the installer with a logical sequence of steps that will minimize potential interferences and maximize safety during boiler installation.
2 A. CLEARANCES Unit may be installed on combustible flooring, provided the boiler is not set on carpet and a metal drip pan is placed under the appliance. Unit may be installed in a closet with the above clearances. See also Section B, Air for Combustion and V entilation.
3 C. CHIMNEY / VENT AND DRAFT CONTROL 1. Draft Requirement – Minimum draft r equir ed in the vent system is -.03" to -.06" W .C. depending on boiler model, see T able 7.1 (Section 7). This draft is necessary to provide the necessar y draft over fire of -.
4 A. SETTING THE BOILER 1. Provide a level foundation, located as close as possible to the center of the heating system. 2. Refer to Figur es 2.1 and 2.
BOILER PLA CEMENT AND ASSEMBL Y (See T able 8.1 for parts identification). Figure 2.1: Steam boiler 5 Figure 2.2: W ater boiler.
A. PRESSURE TEST BLOCK ASSEMBL Y 1. Make up cold water supply connection to the boiler . 2. Install pressur e gauge or pr essure-temperatur e gauge in tapping provided. See Boiler Dimensional drawing, Figur es 7.1 and 7.2 (Section 7) 3. Plug all open tappings in the boiler and fill with water .
7 E. T ANKLESS HEA TER OR CO VERPLA TE 1. If a tankless coil is used (item 9), install as pictured. On water boilers, install in opening in front section. On steam boilers, install in opening in rear section. F or suggested piping of tankless water heaters refer to Figur es 3.
8 Figure 3.6: Piping with P eerless Indirect Water T ank Figure 3.7: Float Low Water Cut -off PIPING AND CONTROLS Figure 3.5: Piping to Isolate Boiler from Chilled Medium on Chiller Systems.
9 A. GENERAL All electrical wiring shall be done in accordance with the National Electrical Code and Local Requirements. Single pole switches including those of safety controls or protective devices shall not be wired in a grounded line. B. BURNER WIRING 1.
10 ELECTRICAL Figure 4.3: Water Boilers, P ackaged Figure 4.2: Water Boilers, Knockdown.
11 ELECTRICAL Figure 4.5: Steam with Probe Low W ater Cut -off Figure 4.4: Steam with Float Low Water Cut - Off.
12 ELECTRICAL Figure 4.6: Zoning with Circulators Figure 4.7: Zoning with Zone V alves.
13 BURNER SETUP & BOILER OPERA TION A. BURNER INST ALLA TION 1. The oil burner is supplied with a mounting flange fixed in position. 2. Mount the burner to the bur ner mounting plate (item 5) with four (4) 5/16" studs and nuts provided.
14 BURNER SETUP & BOILER OPERA TION E. CLEAN THE BOILER (STEAM BOILERS ONL Y) 1. Clean the boiler within one week after initial start-up. Cleaning will be more effective if boiler operates a day or two to loosen sediment and impurities in system. 2.
15 BURNER SETUP & BOILER OPERA TION BECKETT BURNER SPECIFIC A TIONS Boiler Model No . Burner Model No . Burner Head Static Plate Nozzle Size Pum p Pressure Start-up Settings Head Setting Air Shutter Air Band WBV -03-085 AFG- F3¹ F3 3-3/8" 0.
16 MAINTENANCE 6. MAINTENANCE W ARNING Product Saf ety Inf ormation Refractory Ceramic Fiber Product This appliance contains materials made from refractory ceramic fiber s (RCF). Airborne RCF , when inhaled, ha ve been c lassified by the International Agency f or Resear ch on Cancer (IARC), as a possib le carcinogen to humans.
17 MAINTENANCE A. GENERAL 1. Check pipes adjacent to cold walls or in unheated spaces. Insulate and tape them if necessary to be sure they can't fr eeze up.
18 MAINTENANCE 2. T o thoroughly clean the boiler it must be brushed down from the top. Alternatively , for limited space or minimum clearance to combustible installations, cleaning the heat e xchanger from the combustion chamber side is acceptable. If unit is e xtremely dirty , it may be necessary to brush from both directions.
19 BOILER DIMENSIONS & RA TINGS 7. BOILER DIMENSIONS & RA TINGS Figure 7.1: Boiler Dimensions, Water Boiler Figure 7.2: Boiler Dimensions, Steam Boiler Boiler Model Number Jack et Depth ".
20 T able 7.1: Boiler Ratings ✸ As an ENERG Y ST AR ® P artner , PB Heat, LLC has determined that these firing rates meet the ENERG Y ST AR guidelines for energy efficiency . ✝ T op venting only . ✚ Nozzles for these firing rates not provided as standard equipment.
21 R E PA I R PA R T S 8. REP AIR P ARTS Repair par ts are available from your installer or by contacting PB Heat, LLC, 131 S. Church St, Bally , P A 19503. Note: Remember to include boiler model number and serial number when ordering par ts. T able 8.
22 NOTES.
23 NOTES.
PP8046 R26 (8/08-10M) Pri nte d i n U.S.A . ©2008 WB V/WV Boilers Series Oil Installation, Operation & Maintenance Manual TO THE INST ALLER: This manual is the property of the owner and must be affixed near the boiler for future reference. TO THE OWNER: This boiler should be inspected annually by a Qualified Service Agency.
デバイスPB Heat WBV Seriesの購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
PB Heat WBV Seriesをまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはPB Heat WBV Seriesの技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。PB Heat WBV Seriesの取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。PB Heat WBV Seriesで得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
PB Heat WBV Seriesを既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はPB Heat WBV Seriesの不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、PB Heat WBV Seriesに関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちPB Heat WBV Seriesデバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。