Pellaメーカー801W0103の使用説明書/サービス説明書
ページ先へ移動 of 8
INST ALLA TION INSTRUCTION - INSTRUC CIONES DE INST ALACIÓN FOR CLAD SLIDING P A TIO DOOR PUERT A C ORREDERA P ARA P A TIO Installation Instructions for T ypical W ood F rame Construction. ese instructions were developed and tested for use with typical wood frame wall construction in a wall system designed to manage water .
D. F old the water resistiv e barrier (1D). Fold side aps into the opening and staple to inside wall. F old top ap up and temporarily fasten with ashing tape. YOU WILL NEED T O SUPPL Y : T OOLS REQUIRED: • Cedar or Impervious shims/spacers (12 to 20) • 2" galvanized roong nails (1/4 lb .
2 PREP ARE THE DOOR FOR INST ALLA TION A. Remo v e the plastic wrap and cardboar d packaging from the door . N ote: If screens, grilles or har dwar e are r emoved fr om the door at this time, label them and store them in a protected ar ea. 1 ROUGH OPENING PREP ARA TION (C ONTINUED) 2D 1H 1" 1G 1F 1" 1/2" 1/2" 6" 1E E.
3 SETTING AND F AS TENING THE DOOR A. Place three 3/8" beads of sealant. e rst bead should be approximately 3/4" from the exterior of the rough opening, the second 2-1/2" in from the rst bead of sealant. Place a third bead of sealant in the groov e of the sill support or 1/4" from the exterior edge of the wood blocking.
4 INTEGRA TING THE DOOR TO THE WA TER RESIS TIVE BARRIER A. Apply side ashing tape. C ut two pieces of ashing tape 4" longer than the frame height of the door . Apply one piece 1/2" onto the frame cladding, over the nailing n and onto the water resistive barrier on each side.
6 INTERIOR SEAL Caution: Ensur e use of low pr essur e polyurethane windo w and door insulating foams and strictly follow the foam manufactur er ’ s r ecommendations for application. Use of high pressur e foams or improper application of the foam may cause the door frame to bo w and hinder operation.
7 SEALING THE DOOR T O THE EXTERIOR WALL CLADDING When applying siding, brick veneer or other exterior nish material, leave adequate space between the door frame and the material for sealant. Refer to the illustr ation that corresponds to your nish material.
EXTERIOR FINISH e exterior frame and sash are protected by aluminum cladding with our tough E nduraClad® or EnduraClad Plus baked-on factory nish that needs no painting. Clean this surface with mild soap and water . Stubborn stains and deposits may be remo ved with mineral spirits.
デバイスPella 801W0103の購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
Pella 801W0103をまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはPella 801W0103の技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。Pella 801W0103の取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。Pella 801W0103で得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
Pella 801W0103を既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はPella 801W0103の不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、Pella 801W0103に関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちPella 801W0103デバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。