PVI IndustriesメーカーPV500-26の使用説明書/サービス説明書
ページ先へ移動 of 10
PV500-26 10/07 INSTALLATION & MAINTENANCE MANUAL QuickDraw ® Storage and Semi-instantaneous Boiler Water Heaters Installation and service must be performed by a qualified service installer, service agency or the utility supplier.
QUICKDRAW ® Boiler Water Heater 2 CHECKING EQUIPMENT BEFORE YOU INSTALL Inspect the unit completely upon receipt from the freight carrier before signing the bill of lading. Inspect the appliance and all accompanying parts for signs of impact or mishandling.
QUICKDRAW ® Boiler Water Heater 3 INSTALLATION WARNING: Use industry standard safe rigging methods when attempting to lift or move this product. Failure to follow these instructions could result in property damage, serious injury or death.
QUICKDRAW ® Boiler Water Heater 4 Typical QuickDraw ® Storage Construction Typical QuickDraw ® Instantaneous Construction 1. U-tube Heat Exchan g e r 5. Potable Water Inlet 2. Tank Drain 6. Steam Inlet 3. Control Enclosure 7. Potable Water Outlet 4.
QUICKDRAW ® Boiler Water Heater 5 IMPOR T ANT SAFETY NOTE It takes only 5 seconds of skin contact with 140°F water to cause a second degree burn! You must protect against high water temperatures at all lavatories, tubs, showers and other points of hot water contact.
QUICKDRAW ® Boiler Water Heater 6 WATER INLET / OUTLET CONNECTIONS Important: Do not use galvanized or steel pipe nipples when making waterside connections. Use non-ferrous nipples only. Make inlet and outlet water connections directly to the threaded bolt-on bronze tank flanges.
QUICKDRAW ® Boiler Water Heater 7 3. When the demand is satisfied, the limit operating circuit opens and the valve actuator is de-energized. The actuator motor stops running and the actuator shaft spring returns to the retracted position causing the boiler water to divert through the bypass ports and return to the boiler water supply loop.
QUICKDRAW ® Boiler Water Heater 8 6. In all installations, there should be no pulsation or water hammer since this causes vibration and strain with resulting leaks. 7. Retighten bolting on all gasketed joints after the heat exchanger has reached temperature to prevent leaks and gasket failures.
QUICKDRAW ® Boiler Water Heater 9 and cleaning frequency is established, initially inspect the tank every six months or more frequently if higher scaling conditions are present. Flush the tank at two or three-month intervals depending on water conditions in your location to help prevent the accumulation of scale.
QUICKDRAW ® Boiler Water Heater 10 4. When replacing the heat exchanger head, use a torque wrench to tighten the bolts/studs and nuts. Use the following chart as a guide. All torque values apply to well-lubricated nut bearing surfaces. TIGHTENING TORQUES COMPRESSED FIBER GASKETS Bolt Dia.
デバイスPVI Industries PV500-26の購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
PVI Industries PV500-26をまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはPVI Industries PV500-26の技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。PVI Industries PV500-26の取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。PVI Industries PV500-26で得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
PVI Industries PV500-26を既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はPVI Industries PV500-26の不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、PVI Industries PV500-26に関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちPVI Industries PV500-26デバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。