Raypakメーカー265の使用説明書/サービス説明書
ページ先へ移動 of 14
OPERA TING AND INST ALLA TION INSTRUCTIONS Models 185, 265, 335, 405 Swimming Pool and S pa Heaters 181/182, 260/261, 330/331, 400/401 W ater Heaters and Boilers D-2 POWER VENT (FOR ELECTRONIC IGNITION MODELS ONLY) CATALOG NO.
POWER VENT ASSEMBL Y INST ALLA TION, ST ART -UP AND OPERA TION 1. RECEIVING EQUIPMENT On receipt of your equipment it is suggested that you visually check for external damage to the carton. If the carton is damaged, it is suggested that a note be made on the Bill of Lading when signing for equipment.
3 3. INSTALLATION REQUIREMENTS The equipment must be installed in accordance with local codes, or in the absence of local codes with the latest edition of the National Fuel Gas Code, ANSI Z223.
4 WIRING A POWERVENT ASSEMBL Y TO AN APPLIANCE WITH IID IGNITION. W ARNING : Disconnect all electrical power to the unit before servicing to avoid potential shock injury or damage to the unit. T o change voltages, follow wiring diagram for correct voltage connections.
VENTING The vent pipe must be the same size or larger than what is indicated. The D-2 Power V ent are capable of 360-degree discharge rotation and operate with a positive vent st atic pressure and with a vent gas temperature less than 400°F . The tot al length of horizontal run shall not exceed an equivalent of 40 feet including termination cap.
6 The Raypak Power Vent operates with a positive vent static pressure and with a vent gas temperature that avoids excessive condensate production in the vent and as such it is listed as a CATEGORY III appliance. Exception: When a Power Vent is connected to a vertical vent of sufficient height to generate a negative draft in the system.
7 185-405 POOL HEA TER (A TMOSPHERIC).
8 185-405 POOL HEA TER ( Low NOx).
9 182-260 WH1 (A TMOSPHERIC).
181-261 WH1 (Low NOx) 10.
SEQUENCE OF OPERA TION On call for heat, the D-2 Power Vent fan (and appliance pump) start. When the flow switch circuits close, the ignition system consisting of an electronic spark module, pilot gas system and flame sensor, are energized.
START UP PROCEDURES The water system, the gas system and the electrical system for the heater should be completed and checked as per the heater installation manual and associated documents. 1. Turn on power to the heater with the manual main gas valve and pilot gas valve off.
ILLUSTRA TED P ARTS LIST 13 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15.
Raypak, Inc. , 2151 Eastman Avenue, Oxnard, CA 93030 (805) 278-5300 FAX (800) 872-9725 Raypak Canada LTD , 2805 Slough Street, Mississauga, Ontario, Canada L4T 1G2 (905) 677-7999 FAX (905) 677-8036 Raypak Australia Pty. Ltd , 7 Geddes St., Mulgrave, Victoria, Australia 3170 (6139) 560 4944 FAX (6139) 560 4974 Litho in U.
デバイスRaypak 265の購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
Raypak 265をまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはRaypak 265の技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。Raypak 265の取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。Raypak 265で得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
Raypak 265を既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はRaypak 265の不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、Raypak 265に関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちRaypak 265デバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。