Raypakメーカー992BEの使用説明書/サービス説明書
ページ先へ移動 of 5
Project Name / Date Division 23 52 33.13 - 1 DIVISION 23 52 33.13 FINNED WATER-TU BE BOILERS PART 1 - GENERAL 1.1 SUMMARY A. Section includes gas-fired, copp er finned-tube hydronic heating boilers B. Related Sections Specifier Note: Use as needed 1. Building Services Piping – Division 23 21 00 2.
Project Name / Date Division 23 52 33.13 - 2 Fax: (800) 872-9725; Web site: www.ray pak.com 2. Product: Hi Delta ® copper finned-tube hydroni c boiler(s) 2.
Project Name / Date Division 23 52 33.13 - 3 d. Temperature and pressure gauge 2. The boiler(s) shall be equipped with an energy -saving pump control relay (Economaster II), mounted and wired, which a.
Project Name / Date Division 23 52 33.13 - 4 powder coat which is suita ble for outdoor insta llation, applied prior to assembly for complete coverage, and shall incorporate louve rs in the outer panels to divert air past heated su rfaces. 2. The boiler(s), if located on a combustible floor , shall not requi re a separate combustible floor base.
Project Name / Date Division 23 52 33.13 - 5 c. Inlet temperature error d. Sensor out of range 6. The controller shall have alarm contacts. Q. Low Gas Supply Pressure Manifold 1. The boiler(s) shall be CSA certified for full-i nput operation down to 4 .
デバイスRaypak 992BEの購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
Raypak 992BEをまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはRaypak 992BEの技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。Raypak 992BEの取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。Raypak 992BEで得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
Raypak 992BEを既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はRaypak 992BEの不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、Raypak 992BEに関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちRaypak 992BEデバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。