HO T W A TER MODELS V -33 THR OUGH V -180 INST ALLA TION AND OPERA TING INSTR UCTIONS GAS-FIRED CAST -IR ON BOILERS FOR NA TURAL AND L.P . PR OP ANE GASES CONTENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .P A GE Ratings and Dimensions .
2 V ICTOR Y Dimensions (inches) Figure 1. Left End View Figure 2. Front View Figure 3. Right End View NO TE: Height Dimension increases to 30-3/16" and depth dimension increases to 22-1/4" when combustib le floor kit is used.
V ICTOR Y 3 I NST ALLA TION REQUIREMENTS The installation must conf or m to the requirements of the a uthority having jurisdiction or , in the absence of such requirements, to the National Fuel Gas Code , ANSI Z223.1- l atest edition. This installation must also conf or m to the additional require- ments in this Slant/Fin instruction book.
4 V ICTOR Y Reference T able No. * Appliance Connector Requirements* (ANSI Z223.1) Victor y Boilers T ype “B” See table 11-1 f or minimum and maximum of v ent 11-1 (V -90, V -120, V -150 and V -180) height and lateral length restriction.
V ICTOR Y 5 HORIZONT AL PRESSURE VENTING All VICT OR Y models are cer tified for horizontal pressure venting with the f ollowing restrictions: 1. V ent Material A . The vent system f or horizontal venting m ust be UL list- ed single wall Saf-T 3" diameter #AL 29-4C s stainless steel manuf actured by Heat-F ab, Inc.
Model/V ent Siz e V -90, V -120, V -150 and V -180 boilers ma y be vented into a chimney (see “Chimney and type “B” v enting” paragraph on page 4) or into a type “B” v ent, ONL Y when converted to the 5" dia.
V ICTOR Y 7 Figure 6b. V enting with “B” vent or metal-lined chimney for V -90, V -120, V -150 and V -180 only Minim um vent connector s diameter is 5 inches.
8 V I CTOR Y Figure 7. Horizontal V enting (3 IN.): All Victor y Models All items shown belo w are REQUIRED. All vent joints must be LIQUID and PRESSURE TIGHT . Use only 3" dia. Saf-T vent (#AL 29-4C* stainless steel) venting materials by Heat-F ab Inc.
V I CTOR Y 9 Figure 8. Horizontal V enting (3 IN.): All Victor y Models All items shown belo w are REQUIRED. All vent joints must be LIQUID and PRESSURE TIGHT . Use only 3" dia. Saf-T vent (#AL 29-4C* stainless steel) venting materials by Heat-F ab Inc.
1 0 V ICTOR Y Figure 9. V ertical V enting (3 IN.): All Victory Models All items shown belo w are REQUIRED. All vent joints must be LIQUID and PRESSURE TIGHT . Use only 3" dia. Saf-T vent (#AL 29-4C* stainless steel) venting materials by Heat-F ab Inc.
V ICTOR Y 1 1 at test pressures equal to or less than 1/2 PSIG. D . All gas piping used should be inspected thoroughly f or cleanliness bef ore makeup .
1 2 V ICTOR Y B . PUMP LOCA TION-Locating low-head pump(s) on return to boiler is acceptable for smaller boiler siz es in residences of one or two stories. The alter nate pump location shown in illustration on page 11 is required in l arge, multi-story building installations, especially when high-head pumps are used.
V ICTOR Y 1 3 8. T urn on all electr ic power to the appliance . 9. Set ther mostat to desired setting. 10. If the appliance will not operate, f ollow the instructions "T o T ur n Off Gas T o Appliance" and call your service technician or gas supplier .
1 4 V ICTOR Y 2. Safety Shutdown Chec kout a. For proper operation the pilot should engulf the thermocouple, powerpile generator or flame sen- sor as shown belo w .
V ICTOR Y 1 5 burners as described on page 13. * T o clean burners run a clean flue brush up the tube until all f oreign matter is removed. IV . SAFETY CHECK FOR CONTR OL SYSTEM 1. Remove Control Co ver T o remov e control cov er , remov e the two sheet metal screws in the top of the top co ver .
1 6 V ICTOR Y A PPENDIX A Remov al Of Existing Boiler From Common V ent System "At the time of remov al of an existing boiler , the follo wing s teps shall be f ollowed with each appliance remain.
V ICTOR Y 1 7 Sequence of Operations Wiring Diagrams CA UTION: Label all wires prior to disconnection when servicing controls. Wiring errors can cause improper and dangerous operation. “V er ify proper oper ation after ser vicing. ” THERMOST A T CALLS FOR H EA T C IRCULA TOR CONTINUES TO RUN.
1 8 V I CTOR Y PUMP OR V AL VE ZONING OF W A TER BOILERS COMBINA TION CONTROLS WITH T TV Z TERMINALS* Pump Zoning system using R845 Rela y . One R-845A needed f or each circulator . NO TE: Pumps are powered from C1. T otal pump load must not e xceed 7.
V ICTOR Y 1 9 B URNERS F AIL T O OPERA TE C A USE 1. Safety pilot out, or flame too lo w . 2. Gas supply valv e shut off . 3. Electric switch open. 4. Blown or def ective line fuse . 5. Operating or limit control contacts open or dir ty . 6. Defectiv e gas v alve or pressure regulator; or plugged bleed l ine.
20 V I CTOR Y PIPING A HEA TING - COOLING SYSTEM T O A W A TER BOILER AND CHILLER Figure below illustrates a method of piping a heating-cooling system to a water boiler and a chiller . Hand valves (sho wn) or automatic valv es must be installed to prev ent circulation of c hilled water in the boiler or hot w ater in the chiller .
デバイスSlant/Fin V-180の購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
Slant/Fin V-180をまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはSlant/Fin V-180の技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。Slant/Fin V-180の取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。Slant/Fin V-180で得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
Slant/Fin V-180を既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はSlant/Fin V-180の不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、Slant/Fin V-180に関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちSlant/Fin V-180デバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。