State IndustriesメーカーCCVIT PR6 50の使用説明書/サービス説明書
ページ先へ移動 of 20
1 PRINTED IN U.S.A. 0305 P ART NO. 185172-000 KEEP THIS MANUAL IN THE POCKET ON THE HEATER FOR FUTURE REFERENCE WHENEVER MAINTENANCE ADJUSTMENT OR SERVICE IS REQUIRED.
2 GET TO KNOW YOUR W A TER HEA TER ( A ) VENT PIPE-EXHAUST (B) ANODE (C) HOT WA TER OUTLET (D) OUTLET (1 15 V AC) (E) FLUE BAFFLE (F) GAS SUPPL Y (G) MAIN MANUAL GAS SHUT OFF V AL VE (H) GROUND JOINT .
3 then call your gas supplier or service agent. Keep area clear until a service call has been made. At times you may not be able to smell an LP gas leak. One cause is odor fade, which is a loss of the chemical odorant that gives LP gas its distinctive smell.
4 AIR REQUIREMENTS Dilution air temperature must be 100°F or less. In calculating the free area of a vent opening, the blocking effect of screens, louvers and grills should be considered. Screens shall not be of a mesh smaller than 1/4 inch square. If the free area is not known, the current edition of National Fuel Gas Code ANSI Z223.
5 CAUTION In cold climates provide protection against freeze-up. THE HEA TER SHOULD BE LOCA TED IN AN AREA WHERE LEAKAGE OF THE T ANK OR CONNECTIONS WILL NOT RESUL T IN DAMAGE TO THE AREA ADJACENT TO THE HEA TER OR TO LOWER FLOORS OF THE STRUCTURE.
6 T o prevent damage, care must be taken not to apply too much torque when attaching gas supply pipe to gas valve inlet. The thermostat inlet has a pad for use with back up wrench. Apply joint compounds (pipe dope) sparingly and only to the male threads of pipe joints.
7 3. A) MASONRY SIDE WALLS Chisel an opening approximately one half inch larger than the marked circle. B) WOODEN SIDE WALLS Drill a pilot hole approximately one quarter inch outside of the marked circle. This pilot hole is used as a starting point for a saws-all or sabre saw blade.
8 FIGURE 6 d . ) Splice field wiring into existing wiring using code authorized method (wire nuts, etc.). e. ) Be certain that neutral and line connections are not reversed when making these connections. f .) Close panel on the side of control box, make sure that access panel is secured shut.
9 INST ALLA TION OF VENT SYSTEM (Refer to Figures 3, 4, 5, 7 and 8 as guides). 1. Plan the route of the vent system. Layout the total vent system to use minimum of vent pipe and elbows. The vent piping should be vented downward away from the blower per the required codes.
10 VERTICAL VENT THROUGH ROOF This unit is approved for venting through the roof with the type vent terminal that is included with the unit. A proper flashing or “BOOT” should be used to seal the pipe where it exits the roof. The total vent system should not exceed that which is specified in the table on page 9.
11 RECOMMENDED BRUSH* SIZE FOR PRIMER AND CEMENT APPLICA TIONS Nominal Pipe Size Brush Width (IPS) (INS.) 2 1-1/2 3 1-1/2 - 2-1/2 *USE ONL Y NA TURAL BRISTLE 3 . MAKING THE JOINT A. Cutting Pipe must be squarely cut to allow for the proper interfacing of the pipe end and the fitting socket bottom.
12 G . Cleanup and joint movement Remove all excess cement from around the pipe and fitting with a dry cotton rag. This must be done while the cement is still soft. The joint should not be disturbed immediately after the cementing procedure, and sufficient time should be allowed for proper curing of the joint.
13 FOR YOUR SAFETY READ BEFORE OPERA TING W ARNING: If you do not follow these instructions exactly , a fire or explosion may result causing property damage, personal injury or loss of life. A . This appliance does not have a pilot. It is equipped with an ignition device which automatically lights the burner .
14 TEMPERA TURE REGULA TION W ARNING THIS WA TER HEA TER IS EQUIPPED WITH AN ADJUST ABLE THERMOST A T TO CONTROL W A TER TEMPERA TURE. HOT W A TER TEMPERA TURES REQUIRED FOR AUT OMA TIC DISHW ASHER AND LAUNDR Y USE CAN CAUSE P AINFUL SCALDING WITH POSSIBLE SERIOUS AND PERMANENT INJURY .
15 W A TER HEA TING IGNITION SEQUENCE (Make sure gas and electric power are connected properly) 1) The ignition control module is powered and monitors the system, waiting for a call for heat from the thermostat. 2) The thermostat calls for heat by reading a resistance value within a given range directly proportional to water temperature.
16 VENTING SYSTEM HA VE VENTING SYSTEM CHECKED EVERY SIX MONTHS FOR OBSTRUCTIONS AND/OR DETERIORA TION IN VENT PIPING . BLOWER ASSEMBL Y MAINTENANCE CAUTION The air flow restrictor screen on the inlet side of the blower unit should be checked periodically for any accumulation of dust and lint.
17 TROUBLE SHOOTING Please check guidelines below. For your safety , water heater service should be performed only by a qualified service technicia n. Read the GENERAL SAFETY INFORMA TION section first. PROBLEM SOLUTION An open earth ground circuit to the 1.
18 TROUBLE SHOOTING (Continued) PROBLEM CAUSE SOLUTION 1) Blower will not run. A) “ON/OFF” control switch turned off. Turn switch to the “ON” position. B) Blower unplugged. Plug blower back into 1 15 V ac. outlet. C) No power at outlet. Repair service to outlet.
19 THIS W ARRANTY IS APPLICABLE TO THE ORIGINAL OWNER ONL Y . If the glass lined tank in this water heater shall prove upon examination by S t ate W ater Heaters (the warrantor) to have leaked during .
20 500 LINDAHL P ARKWA Y ASHLAND CITY , TN 37015 www.statewaterheaters.com.
デバイスState Industries CCVIT PR6 50の購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
State Industries CCVIT PR6 50をまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはState Industries CCVIT PR6 50の技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。State Industries CCVIT PR6 50の取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。State Industries CCVIT PR6 50で得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
State Industries CCVIT PR6 50を既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はState Industries CCVIT PR6 50の不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、State Industries CCVIT PR6 50に関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちState Industries CCVIT PR6 50デバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。