Introduction The Field Interface Unit (FIU) provides the communications hardware link between the SitePro TM central computer , the SitePro compatible field satellite controllers and the SitePro Central Decoder System components. The FIU is available in four configu- rations to provide various combinations of wireline and radio communication paths.
6 5 5 7 15 8 9 10 11 13 16 14 17 18 20 12 19 22 21 23 24 1 2 3 4 Figure 2 - Model 2020 (two wireline ports) 1 - Central Computer 2 - Field Interface Unit 3 - COM Port 1 4 - COM Port 2 5 - DB-9/DB-9 Serial Cable 6 - Power Adapter 7 - Auxiliary Port (optional for sensors) 8 - Channel 2 (in) 9 - Channel 1 (in) 10 - 12 V d.
3 6 7 13 8 9 10 11 14 15 16 18 17 19 1 2 12 20 3 5 5 4 21 24 23 25 26 22 1 - Central Computer 2 - Field Interface Unit 3 - COM Port 1 4 - COM Port 2 5 - DB-9/DB-9 Serial Cable 6 - Power Adapter 7 - Auxiliary Port (optional for sensors) 8 - Channel 3 (in) 9 - Channel 1 (in) 10 - 12 V d.
7 8 19 17 9 10 12 11 13 20 21 22 24 23 25 27 26 28 1 2 6 6 6 18 14 16 3 4 5 15 31 30 32 33 29 1 - Central Computer 2 - Field Interface Unit 3 - COM Port 1 4 - COM Port 2 5 - COM Port 3 6 - DB-9/DB-9 Serial Cable 7 - Power Adapter 8 - Auxiliary Port (optional for sensors) 9 - Channel 3 (in) 10 - Channel 2 (in) 1 1 - Channel 1 (in) 12 - 12 V d.
Installing the Field Interface Unit, W all Plate Assembly and Sur ge Protection Unit 1. Position the Field Interface Unit within 6' (1.8 m) of the PC. Note: Maximum distance is 50' (15.2 m). 2. Using the serial cable(s) supplied, connect the PC to the FIU as illustrated in the appropriate configuration diagram Figure 1–5 .
7. A 25' (7.6 m) length interface cable is supplied for the connection of the modular wall plate to the SPU. Select an installa- tion site for the SPU on an outside wall, within the cable reach, and 3' to 5' (0.9 m to 1.5 m) above ground level for straight and easy access to an earth ground.
Procedure 1. Drive a 5/8" (16 mm) by 8' (2.5 cm) copper-clad steel ground rod into well-moistened soil not more than 8' (2.5 cm) from the SPU. The top of the ground rod should be 12" (30.5 cm) below grade level. 2. Install 3/4" (19 mm) conduit from the bottom of the SPU enclosure to approximately 12" (30.
Communication Cab le T est Correct installation of the communication cable is essential for proper operation of the wireline control system. The communi- cation cable must be tested for the presence of significant voltage, circuit continuity and excessive resistance.
Processor Read y: Indicator light will illuminate when the microprocessor in the FIU has received configuration instructions from PC and is ready to communicate with satellites or DIUs. Field T ransmit: Indicator light will illuminate or flash during transmission of data to field satellites or DIU(s).
Note: The Motorola radio service software screens shown in Figure 12 , 13 , and 14 are for example only . Later service software versions may not be formatted as shown, however , the items within boxes must be set as indicated to enable system operation.
Radio-Link System Setup 1. Reconnect power to the FIU and switch on all components. The central computer should be booted up and the SitePro pro- gram operational. See Figure 3 and 4 respectively for hardware configuration of model FIU-201 1 and FIU-2021.
SitePro Central Decoder System Connection The SitePro Central Decoder System (CDS) program works in conjunction with the SitePro Field Interface Unit Model 2010 and the Decoder Interface Unit (DIU). Connect the FIU, central computer , SPU and the DIU(s) as shown in Figure 16 .
4 5 6 6 5 4 2 7 Pin 2 Pin 2 Pin 1 Pin 1 2 3 3 1 Figure 16 - DIU Connection Overview Figure 17 RJ45 Cable to Wall Plate 13 Y ellow Y ellow Y ellow Gray Gray Gray 1 - Surge Protection Unit 2 - Communica.
14 Figure 18 - Illustrated Parts Listing, FIU Models 2010, 2020, 201 1 and 2021 See Detail B See Detail C Detail B Detail C Phone Jack View A-A (Bottom View of Item 9) A A.
15 Item No. P ar t No. Description Quantity P er Assy . Refer to Figure 18 for the f ollowing items: 1 - - - - - - - Housing, SNCX, FIU 1 2 - - - - - - - Bracket, FIU (See Service Item 102-0867) 1 3 - - - - - - - Front Plate, LED Display (See Service Item 102-0872) 1 4 360-0750 Holder , Fuse 1 5 360-0749 Fuse, 1.
T roubleshooting If a malfunction occurs, follow the suggested steps to identify and fix the problem. If the problem cannot be resolved there may be a problem with the FIU, the satellite or the DIU. If you have current NSN support, please call T oro NSN at 1-800-527- 4248.
デバイスToro 2011の購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
Toro 2011をまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはToro 2011の技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。Toro 2011の取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。Toro 2011で得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
Toro 2011を既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はToro 2011の不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、Toro 2011に関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちToro 2011デバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。