Vanguard HeatingメーカーPM400の使用説明書/サービス説明書
ページ先へ移動 of 28
INSTALLATION & OPERATION MANUAL DO NOT DISCARD THIS MANUAL! P OWER M AX tm GAS INFRA-RED WATER BOOSTER HEATERS Model PM200 and PM400 IMPORTANT FOR YOUR SAFETY WARNING: IF THESE INSTRUCTIONS ARE NO T FOLLOWED EXACTLY, FIRE OR EXPLOSION MAY RESULT, CAUSING PRO PERTY DAMAGE, PERSONAL INJURY OR DEATH.
ii TABLE OF CONTENTS Page General Information 1 Installation Codes 2 Unpacking 2 Locating 2 Combustion Air/Ventilation 3 Exhaust Venting 3 Gas Piping 5 Water Requirements 6 Water Piping 7 Electrical 9.
1 GENERAL INFORMATION The POWERMAX tm gas fired, infra-red water boos ter heater provides 180 degree sanitizing rinse water for commercial dishwa shing machines. Dishware and utensils used in the preparation and servi ng of food are required by H ealth Codes and the National Sanitation Foundation (NSF) to be sanitized by hot (min.
2 INSTALLATION CODES Installation must be performed in accordance with state and local codes, or, in the absence of local codes, with the following: National Fuel Code, ANSI Z223.1 (latest edition) the National Electric Code (NEC) ANSI/NFPA 70 (latest edition).
3 COMBUSTION AIR / VENTILATION The POWERMAX tm must be provided with an adequate supply of air for proper combustion and ventilation as r equired by the National Fuel Gas Code, ANSI Z 223.1 or any local codes that supercede the National Code. Do not obstruct the combustion and/or ventilation air supply openings.
4 2. Through the ceiling/roof (see fig.3) or through a sidewall (s ee fig. 4). Type B-1 vent pipe (inch min. diameter) may be used w hen venting vertically through the roof, provided a one inch minimum clearance to combustible material is maintained throughout and the vent terminates into a listed wind cap above the roof.
5 any door, opening window or gravity air inlet into any building. It shall also have a minimum horizontal clearance of four feet from any electric meter, gas meter, regulator, relief valve or other equipment. -The vent terminal shall be located not less than seven feet above grade when it is adjacent to public walkways.
6 The gas valve is provided with a pressure tap to measure gas pressure downstream , which is also the manifold pressure (fig. 5.). The gas piping must have a sediment trap ahead of the heater gas controls and an approved manual shut-off valve (pr ovided by others) located outside the jacket and easily accessible.
7 Recommended water hardness is 4-6 grains of hardness per gallon. Chlorides must NOT exceed 50 parts per million. Water hardness above 6 grains per gallon should be treated with a proper water conditioner (water softener or in-line treatment). Water hardness below 4 grains per gallon also requires water treatment to reduce its corrosive effects.
8 Follow instructions on the tag located on t he Temperature and Pressu re Relief valve to avoid contact with hot water discharge and to prevent water damage from operation of the valve. Repair or alteration of the Te mperature and Pressure Relief valve in any way is prohibited by National Safety Standards and local code s.
9 ELECTRICAL The electrical power supply requirement for the booster heater is 120 volts, AC, 60Hz, 6.0 amps or less. Field wiring connections and electrical grounding must comply with local codes, or, in the absence of local codes, with the latest edition of the National Electric Code (NEC), ANSI/NFPA 70.
10.
11.
12 OPERATING SEQUENCE The booster heater is design ed to produce 180-190 degree sanitizing rinse water for commercial dishwashing machines. Specif ic performance depends upon the exact water flow and supply water temperature. (See table) PowerMax200 tm Performance Data Temperature rise Gallons per Minute Gallons per Hour 40 o F 8.
13 POWERMAX tm START-UP PROCEDURE For your safety, read completely before operating. CAUTION: DO NOT turn Power Switch ‘on’ until the booster has been filled with water and all air has been purged from the water lines and accumulator tank.
14 FOR YOUR SAFETY, READ BEFORE OPERATING WARNING! - IF YOU DON’T FO LLOW THESE INSTRUCTIONS EXACTLY, A FIRE OR EXPLOSION MAY RESULT CAUSING PROPERTY DAMAGE, PERSONAL INJURY OR DEATH. A. This appliance DOES NOT have a standing pilo t ignition system.
15 TO TURN OFF GAS TO APPLIANCE 1. Turn off all electric power to the boos ter heater if service is to be performed. 2. Turn off manual gas valve in gas supply piping. 3. Remove front access panel by lifting panel to release bottom, tilting panel away from unit and removing panel.
16 MAINTENANCE Lubrication The water pump motor and the combustion ai r blower are permanently lubricated and require no periodic maintenance. Auxiliar y power vent motor (depending upon model) may or may not need periodic adj ustment or lubrication. Consult power vent manual.
17 TROUBLE SHOOTING CAUTION : Label all wires prior to disconnection when servicing controls. Wiring errors can cause im proper and dangerous operation. Verify proper operation after servicing. PROBLEM CAUSE REMEDY 3. On-Off switch powered, Unit does not operate.
18 REPLACEMENT PARTS LIST When ordering parts, always refer to the Model number and Serial Number. The data plate is mounted on the electrical panel face behind the front cover panel. NOTE- Part numbers may change wit hout notification. To obtain the most recent part numbers contact the Factory or your authorized Vanguard service agency.
19 LIMITED WARRANTY: Products manufactured by Vanguard T echnology. Inc. are warranted to be free from defects in material and workmanship, when installed and ma intai ned in accordance with Vanguard.
20 APPENDIX A TYPICAL SPECIAL STAINLESS STEEL VE NTING For use with Categor y II, III, IV appliances Contact Local Building or Fire Officials About Restrictions and Installa tion Inspections in your area as well as National codes: USA -National fuel gas code ANS1-Z223.
21 Appendix A JOINT PROCEDURE (see illustration #1 below) 1. The outside of male end and inside of female end of pipe must be cleaned before applying sili cone bead. Remove dirt, grease, and moisture from surface to be sealed. Dry surface or allow to dry thoroughly.
22 Appendix A SIDE WALL VENTING INSTALLATION SIDE WALL VENTING INSTALLATION (see illustration #2) 1. Install wall thimble into wall, observing the aforem entioned rules and/or local buildi ng codes. Select the point of wall penetration where the minimum 114” per foot of slope (6.
23 Appendix A 3. The system must be supported alo ng its hori zontal length at all elbow locations and joints (e very forty- eight inches or less) using straps around pipe s mainta ining clearance to combustible s as p er table.
24 2949 5 A i r por t R oad, Eu gene , O R 974 02 T el : ( 541) 461-6020 Fa x: ( 5 41) 461-6023 T ol l F r e e : 1- 8 00- 624- 48 09 Factory Authorized PowerMax Start-Up Verification Worksheet Job Nam.
25 Page 2 Vanguard Technology Inc. Factory Authorized Start-Up - Ve rification Worksheet - continued ! Bleed air from accumulator and heat exch anger through temperatu re/pressure relief valve. ! Turn power switch ‘on’. ! Burner(s) will activate un til accum ulator temp erature setting is reached.
26.
デバイスVanguard Heating PM400の購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
Vanguard Heating PM400をまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはVanguard Heating PM400の技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。Vanguard Heating PM400の取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。Vanguard Heating PM400で得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
Vanguard Heating PM400を既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はVanguard Heating PM400の不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、Vanguard Heating PM400に関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちVanguard Heating PM400デバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。