P art Number 550-141-816/0798 Contents I . New installation .......... 2 II . Existing installation .... 4 III. Water and steam trim components .................. 4 IV. Gas piping ................... 5 V. Wiring ........................... 5 Sequence of operation .
P art Number 550-141-816/0798 2 LGB -6 to LGB -20 Ser ies 2 – Control S upplement I New installation 1 . R emove all bu r ners from base bo x assembly . Remo ve 3.95 mm natural gas main burner orifices in manifold. Install 2.40 mm propane gas main burner orifices.
P art Number 550-141-816/0798 3 CSD-1 Control System – Propane gas Figure 1 Pilot burner assembly , typical Figure 2 Main flame sensor assembly I New installation – continued.
P art Number 550-141-816/0798 4 LGB -6 to LGB -20 Ser ies 2 – Control S upplement 1 . These instructions are for use with Propane Control Cartons as listed in Gas Control Arrangement, T able 2 (page 2). 2 . Remove jacket door(s) and access panel(s).
P art Number 550-141-816/0798 5 CSD-1 Control System – Propane gas IV Gas piping 1 . Contact gas supplier to siz e pip es, tanks and regulator . a. Inlet gas pressure to manual main shut-off gas valve — minimum 11” W .C., maxim um 13” W .C. b.
Part Number 550-141-816/0798 6 LGB-6 to LGB -20 Series 2 – Control Supplement P art Number 550-141-816/0798 7 CSD-1 Control System – Propane gas Figure 3 Wiring diagram SENSOR MAIN FLAME FIRING RATE CONTROL (WHEN USED) STAGE COMBINATION VALVE W/REGULATOR MAIN GAS VALVE - TWO MAIN GAS VALVE TERMINAL.
P art Number 550-141-816/0798 8 LGB -6 to LGB -20 Ser ies 2 – Control S upplement 1 . Operating control begins startup sequence. a. Limit control contacts are closed. 2 . Pilot proving module energized. a. Pilot solenoid opens. b. Pilot ignition spark begins.
P art Number 550-141-816/0798 9 CSD-1 Control System – Propane gas Figure 5 Field wiring diagram.
P art Number 550-141-816/0798 10 LGB -6 to LGB -20 Ser ies 2 – Control S upplement 1 . Remove red (MV) and blue (PV) wires from main gas valve. 2 . Close main test firing valve attached to the manifold. 3 . Check that both leak test valves are closed and remove plugs.
P art Number 550-141-816/0798 11 CSD-1 Control System – Propane gas This document is intended only as a supplement to the LGB Gas-Fired Boiler Manual . Follow all instructions in the Manual, including those regarding start-up (found in Section VIII, “Placing boiler in operation ”).
P art Number 550-141-816/0798 12 LGB -6 to LGB -20 Ser ies 2 – Control S upplement W eil-McLain 500 Blaine Street Michigan City , IN 46360-2388 http://www .
デバイスWeil-McLain LGB 6-20 Seriesの購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
Weil-McLain LGB 6-20 Seriesをまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはWeil-McLain LGB 6-20 Seriesの技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。Weil-McLain LGB 6-20 Seriesの取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。Weil-McLain LGB 6-20 Seriesで得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
Weil-McLain LGB 6-20 Seriesを既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はWeil-McLain LGB 6-20 Seriesの不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、Weil-McLain LGB 6-20 Seriesに関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちWeil-McLain LGB 6-20 Seriesデバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。