Weil-McLainメーカーLGB-11の使用説明書/サービス説明書
ページ先へ移動 of 11
P art Number 550-141-797/0798 Contents I . New installation ........... 2 II . Existing installation ..... 4 III. Gas piping ..................... 5 IV. Wiring ............................ 5 Sequence of operation ..... 8 Wiring procedure .............
P art Number 550-141-797/0798 2 LGB -6 to LGB -23 Series 2 – Control Su pplement New installation I 1 . R emove all bu r ners from base bo x assembly . Remo ve 3.95 mm natural gas main burner orifices in manifold. Install 2.40 mm propane gas main burner orifices.
P art Number 550-141-797/0798 3 U niv ersal Control Syst em – Pr opane gas Figure 1 Pilot burner assembly , typical LGB-A84-B Locating Slot Igniter Sensor UCS Pilot Burner 10-32 x 5/16“ Machine Sc.
P art Number 550-141-797/0798 4 LGB -6 to LGB -23 Series 2 – Control Su pplement 1 . These instructions are for use with Propane Control Cartons as listed in Gas Control Arrangement, T able 2 (page 2). 2 . Remove jacket door(s) and access panel(s). 3 .
P art Number 550-141-797/0798 5 U niv ersal Control Syst em – Pr opane gas 1 . Contact gas supplier to siz e pip es, tanks and regulator . a. Inlet gas pressure to manual main shut-off gas valve — minimum 11” W .C., maximum 13” W .C. b. If pressure to gas valv e exc eeds 13” W .
P art Number 550-141-797/0798 6 LGB -6 to LGB -23 Series 2 – Control Su pplement P art Number 550-141-797/0798 7 U niv ersal Control Sy stem – P ropane gas Figure 3 Wiring diagram.
P art Number 550-141-797/0798 8 LGB -6 to LGB -23 Series 2 – Control Su pplement Wiring Procedure IV Wiring – continued 1 . Determine right or left electrical supply wiring. 2 . Attach electrical junction box(es) to inside jacket end panel. Screws and nuts are provided.
P art Number 550-141-797/0798 9 U niv ersal Control Syst em – Pr opane gas This document is intended only as a supplement to the LGB Gas-Fired Boiler Manual . Follow all instructions in the Manual, including those regarding start-up (found in Section VIII, “Placing boiler in operation ”).
P art Number 550-141-797/0798 10 LGB -6 to LGB -23 Series 2 – Control Su pplement VI P arts list - U .S . boilers Figure 5 U .S. parts drawing Ref. No.
P art Number 550-141-797/0798 11 U niv ersal Control Syst em – Pr opane gas VII P arts list - Canadian boilers Figure 6 Canadian parts drawing Ref. No.
P art Number 550-141-797/0798 12 LGB -6 to LGB -23 Series 2 – Control Su pplement W eil-McLain 500 Blaine Street Michigan City , IN 46360-2388 http://www .
デバイスWeil-McLain LGB-11の購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
Weil-McLain LGB-11をまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはWeil-McLain LGB-11の技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。Weil-McLain LGB-11の取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。Weil-McLain LGB-11で得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
Weil-McLain LGB-11を既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はWeil-McLain LGB-11の不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、Weil-McLain LGB-11に関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちWeil-McLain LGB-11デバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。