Carrierメーカー58MXAの使用説明書/サービス説明書
ページ先へ移動 of 16
58MXA 4-Way Multipoise Fixed-Capacity Direct-Vent Condensing Gas Furnace Service and Maintenance Instructions → For Sizes 040—140, Series 130 NOTE: Read the entire instruction manual before performing any service or maintenance. This symbol → indicates a change since the last issue.
The ability to properly perform maintenance on this equip- ment requires certain expertise, mechanical skills, tools, and equipment. If you do not possess these, do not attempt to perform any maintenance on this equipment other than those procedures recommended in the User’s Manual.
Step 1—Cleaning and/or Replacing Air Filter The air filter arrangement may vary depending on the application or orientation. Never operate unit without a filter or with the blower access panel removed. Failure to follow this warning could result in a fire or personal injury.
11. Reinstall condensate trap and tubing if previously removed. a. Reinstall condensate trap in hole in blower shelf. b. Connect condensate trap drain tubes. See Fig. 8 or tubing diagram on main furnace door for proper tube location. (1.) Connect 1 tube (blue or blue and white striped) from collector box.
Never use matches, candles, flame, or other sources of ignition to check for gas leakage. Use a soap-and-water solution. Failure to follow this warning could result in a fire, personal injury, or death. 19. Replace main furnace door. Step 4—Cleaning Heat Exchangers The following items should be performed by a qualified service technician.
Never use matches, candles, flame, or other sources of ignition to check for gas leakage. Use a soap-and-water solution. Failure to follow this warning could result in a fire, personal injury, or death.
4. Disconnect pressure switch tubes. 5. Disconnect vent pipe from inducer housing outlet by loosen- ing coupling clamp on inducer outlet. 6. Disconnect drain tube from inducer housing. (See Fig. 8.) 7. Remove inducer housing assembly by removing 4 bolts attaching assembly to cell panel.
10. Replace main furnace door. Step 7—Electrical Controls and Wiring There may be more than 1 electrical supply to the unit. Check accessories and cooling unit for additional electrical supplies. The electrical ground and polarity for 115-v wiring must be maintained properly.
1. Leave 115-v power to furnace turned on. 2. Remove main furnace door. 3. Look into blower access panel sight glass for current LED status. NOTE: Leave blower access panel installed to maintain power to control center to view current LED status. 4. BRIEFLY remove either wire from the main limit switch until the LED goes out, then reconnect it.
NOTE: Heat tape, when used, should be wrapped around the condensate drain trap and drain line. There is no need to use heat tape within the furnace casing. Most heat tapes are temperature activated, and it is not practical to verify the actual heating of the tape.
PCB BLOWER OF F DELAY SELECTION CHART 90 SEC 135 SE C 180 SE C 225 SE C GVR HI / L O RE LA Y SEC-1 SEC-2 WHT PL1 32 1 6 5 4 9 87 LED TEST/TWIN BLOWER OFF DEL AY G R Y W C HUM H SIR ID R BL W R BLOWER SPEED SELECT FU1 COOL HEAT L2 PL3 PL2 VAC 120 L1 PR1 1 2 1 2 3 PR2 24 V A C -3A FUSE SPARE-2 SPARE-1 EAC-1 EAC-2 C 1.
→ Fig. 16—Service Label A99107 SER VICE COMP ON ENT TE ST To in iti a te th e co m po n ent test se que nc e, sh u t OF F th e r oom the rm o st at o r disconnect t he "R" t hermostat lead. Brie fly short the TEST ter minal to t he "Com 24V " ter mi nal .
Is circuit breaker closed? Close door switch and go to start. Is red LED status light on? Is door switch closed? Is red LED status light blinking rapidly without a pause? Is there 1 15v going to switch? Replace door switch. Replace control center . Replace transformer .
11 NO PREVIOUS F A UL T - Faults are erased after 48 hrs or whenever power (1 15v or 24v) is interrupted. Run system through a heating or cooling cycle to check system. 12 BLO WER ON AFTER PO WER UP (115V OR 24V) - Normal operation. Blower will run for 90 sec when furnace power is interrupted during a call for heat, R-W closed.
15.
A94328 SERVICE TRAINING Packaged Service Training programs are an excellent way to increase your knowledge of the equipment discussed in this manual, including: • Unit Familiarization.
デバイスCarrier 58MXAの購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
Carrier 58MXAをまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはCarrier 58MXAの技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。Carrier 58MXAの取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。Carrier 58MXAで得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
Carrier 58MXAを既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はCarrier 58MXAの不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、Carrier 58MXAに関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちCarrier 58MXAデバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。