Carrierメーカー58RAVの使用説明書/サービス説明書
ページ先へ移動 of 12
58PAV, 58RAV Induced-Combustion Furnaces Service and Maintenance Instructions For Sizes 045-155, Series 131 NOTE: Read the entire instruction manual before performing any service or maintenance. This symbol → indicates a change since the last issue.
The ability to properly perform maintenance on this equip- ment requires certain expertise, mechanical skills, tools, and equipment. If you do not possess these, do not attempt to perform any maintenance on this equipment other than those procedures recommended in the User’s Manual.
Never operate unit without a filter or with filter access door removed. A failure to follow this warning could result in fire, personal injury, or death. 1. Downflow/Horizontal Each furnace requires 2 filters which are installed in the return-air duct.
9. Loosen setscrew holding blower wheel on motor shaft. 10. Remove bolts holding motor mount to blower housing and slide motor and mount out of housing. Disconnect ground wire attached to blower housing before removing motor. 11. Lubricate motor (when oil ports are provided).
8. Clean cells using field-provided small wire brush, steel spring cable, reversible electric drill, and vacuum cleaner. a. Assemble wire brush and steel spring cable. (1.) Use 48 in. of 1/4-in. diameter high-grade steel spring cable (commonly known as drain clean-out or Roto- Rooter cable).
ELECTRICAL CONTROLS AND WIRING There may be more than 1 electrical supply to the unit. Check accessories and cooling unit for additional electrical supplies. The electrical ground and polarity for 115-v wiring must be maintained properly. Refer to Fig.
Fig. 10—Heating and Cooling Application Wiring Diagram A78461 115-VOLT FIELD- SUPPLIED FUSED DISCONNECT AUXILIARY J-BOX CONTROL BOX 24-VOLT TERMINAL BLOCK TWO-WIRE HEATING-.
→ Fig. 12—Unit Wiring Diagram A94074 PCB BLO WER OFF DELAY SELE C TION C HART 90 SEC 135 SEC 180 SEC 225 SEC GVR HI/LO R E LAY SEC-1 SEC-2 PL 1 3 2 1 6 5 4 987 LED TEST/TWIN BLOW ER OFF D E LAY G .
Fig. 13—Service Label A93297 - Stuck gas valve relay on control or miswire to gas valve circuit. - Stuck-open gas valve or leaky gas valve. - Obstructed pressure tubing.- Defective pressure switch (stuck closed).
Close door switch and go to start. Is circuit breaker closed? Is red LED status light on? Is red LED status light blinking rapidly without a pause? Is door switch closed? Is there 115v going to switch? Replace control board.
11 NO PREVIOUS FAULT - Faults are erased after 48 hrs or whenever power (115V or 24V) is interrupted. Run system through a heating or cooling cycle to recheck system.
Copyright 1994 CARRIER Corp. • 7310 W. Morris St. • Indianapolis, IN 46231 58pr9sm Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations. Book 1 4 Tab 6a 8a PC 101 Catalog No.
デバイスCarrier 58RAVの購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
Carrier 58RAVをまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはCarrier 58RAVの技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。Carrier 58RAVの取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。Carrier 58RAVで得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
Carrier 58RAVを既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はCarrier 58RAVの不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、Carrier 58RAVに関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちCarrier 58RAVデバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。