Cisco SystemsメーカーD200の使用説明書/サービス説明書
ページ先へ移動 of 86
CH A P T E R 19-1 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 19 DLPs D200 to D299 DLP-D201 Apply a Lock-On Note T o apply a lock -on to a protect card in a 1:1 or 1:N protection grou p, the protect card must b e acti ve. If the prote ct card is in standby , th e Lock On button is disa bled.
19-2 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D202 Apply a Lockout The Lock On stat e has been applied and t raf f ic cann ot be switch ed to the w orking car d. T o clear t he Lock On state, see the “DLP-D203 Clear a Lock-O n or Lockout” task on page 19-3 .
19-3 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D203 Clear a Lock-On or Lo ckout DLP-D203 Clear a Lock-On or Lockout Step 1 In node vie w , click the Maintenance > Protection tabs. Step 2 In the Protection Groups list , click the protectio n group that contains the card you w ant to clear .
19-4 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D205 Clean Fiber Conne ctors with CLETOP Step 3 Blo w-dry using filtered air . Step 4 Use an inspection microscope to inspect each fiber connector for dirt, cracks, or scratches.
19-5 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D206 Clean the Fiber Adapters DLP-D206 Clean the Fiber Adapters Step 1 Remov e the dust plu g from the f iber adapter . Step 2 Insert a CLET OP stick swab (1410 0400) into the adapter op ening and rotate the swab .
19-6 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D208 Change External Al arms Using the AIC-I Card DLP-D208 Change External Alarms Using the AIC-I Card Step 1 Confir m that e xternal-de vice relay s are wired to the ENVIR ALARMS IN p ins on the MIC-A/P Front Mount Electrical Connection (FMEC).
19-7 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D210 Change AIC-I Card Orderwire Settings Step 3 On the External Controls subtab, modify any of t he follo wing f ields for each external contro l wired to the ONS 1545 4 SDH MIC-A/P card.
19-8 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D211 Provision CE- 1000-4 Ethernet Ports DLP-D211 Provision CE-1000-4 Ethernet Ports Note Y ou can provisi.
19-9 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D212 Create a User Data Channel Circuit Note Reprovision ing an Ethernet port on the CE-1000- 4 card does not reset the Ethernet statistics for that port. Step 6 Return to your ori ginating procedure (NTP).
19-10 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D213 Provision th e Card Mode for ML-Series Ethernet Cards DLP-D213 Provision the Card Mode for ML-Series Ethernet Cards Step 1 In node vie w , double-click the ML-Series Ethernet card graphic to open the card.
19-11 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D215 Consolidate Links in Network View Step 2 Click the Pro visioning > Line tabs for all cards except the G-Series card. For the G-Series card, click the Provisio ning > Port tabs.
19-12 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D215 Consolidate Links in Ne twork View Step 1 From the V iew men u, choose Go to Network V i ew . CTC shows the link icons by default. Step 2 As needed, perfo rm one or more o f the follo wing steps: • T o toggle link icons on and of f, go to Step 3 .
19-13 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D215 Consolidate Links in Network View Figur e 19-2 Consolidated Links in Networ k View Figure 19-3 sh o ws a dif feren t network vie w with local DCC link consolidation between t wo nodes.
19-14 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D216 Change the STM-N Card ALS Maintenance Settings b. Check the check box es ne xt to the links t hat you want to display . c. Click OK . Step 10 Return to your ori ginating procedure (NTP).
19-15 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D216 Change the STM-N Card ALS Maintenance Settings Step 4 Click Apply . If the change affects traf f ic, a warning message displays. Click Ye s to complete the change.
19-16 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D217 MS-SPRing Exercise Ring Test DLP-D217 MS-SPRing Exercise Ring Test Step 1 From the V iew men u, choose Go to Network V i ew . Step 2 Click the Pro visioning > MS-SPRing tabs.
19-17 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D217 MS-SPRing Exercise Ring T est Step 5 Exercise the east port: a. Right-click the east port o f any MS-SPRing node and choose Set East Pr otection Opera tion .
19-18 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D218 Provision SNCP Ring Se lectors During Circuit Creation DLP-D218 Provision SNCP Ring Selectors During.
19-19 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D219 Provision a Low-Order Tunnel Route DLP-D219 Provision a Low-Order Tunnel Route Step 1 In the Circuit Creation wizard i n th e Route Revie w and Edit area, click the source node icon if it is not already selected.
19-20 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D221 Provision E-Series Ethe rnet Ports for VLA N Membership Note Both 1000 Full and Au to modes set the E1000-2- G port to the 1000 Mbps and Full duple x operating mode; ho wever , flow con trol is disabled when 1000 Full is selected.
19-21 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D221 Provision E-Series Ether net Ports for VLAN Membership • If a port is a member of only one VLAN, cho ose Untag from the Port column in the VLAN’ s row .
19-22 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D222 Provision G-Series Ethern et Ports DLP-D222 Provision G-Series Ethernet Ports Step 1 In node vie w , double-click the G-Series card graphic to open the card.
19-23 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D223 Download an Alarm Severity Profile Note Reprovision ing an Ethernet po rt on the G-Series card does n ot reset the Ethernet statistics for that port. Step 6 Return to your ori ginating procedure (NTP).
19-24 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D224 Adjust the Java Virtual Memory Heap Size Note The Default alarm profile list contains alarm and condition se v erities that correspond when applicable to default valu es esta blished in T elcordia GR-253-CORE.
19-25 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D225 Enable Alarm Filtering Step 7 Ty p e 512 in the V ariable V alue field. Step 8 Click OK . Step 9 Reboot your PC. Step 10 Return to your ori ginating procedure (NTP).
19-26 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D227 Disable Alarm Filtering DLP-D227 Disable Alarm Filtering Step 1 At node, network, or car d vie w , click the Alarms tab . Step 2 Click the Filter tool at the lo wer -ri ght side of the bottom to olbar .
19-27 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D230 Change a Circuit State In the Circuits on Span dialog bo x, you can vie w the follo wing in formation about the cir cuits that tra verse th e span. The information t hat appears depends on the circuit type.
19-28 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D231 Edit a Circuit Name Step 5 In the Set Circuit State di alog box, choose the administrati v e state fr om the T arget Circuit Admin State drop-do wn list: • Unlocked—Puts the circuit cr oss-connects in the Unlock ed-enabled service state.
19-29 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D232 Change Active and Standby Spa n Color Step 2 Click the circuit you wa nt to rename, then cli ck Edit .
19-30 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D233 Edit SNCP Circuit Path Selectors c. Click OK to close the Pick a Color dialog box. If you wa nt to change th e standb y span color , continue with Step 5 .
19-31 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D234 Roll the Source or De stination of One Optical Circuit • (VC4 circuits onl y) In the VC LO Circuit s Only area, set the follo wing t hresholds: – SF threshold—Sets the SNCP si gnal failure BER threshold.
19-32 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D234 Roll the Source or Destination of One Op tical Circuit Figur e 1 9-5 Selecting Single Roll At tr ibut es Step 6 Click Next .
19-33 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D234 Roll the Source or De stination of One Optical Circuit Figur e 1 9-7 Selecting a New Endpoint Step 10 Click Finish . On the Circuits tab, t he circuit status for the Roll Fro m port changes from DISCO VERED to R O LL_PENDING.
19-34 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D235 Roll One Cross-Connec t from an Optical Circuit to a Second Optical Circuit Figur e 19-8 Viewing the Rolls T ab Step 12 If you selected Manual in Step 5 , click the rolled f acility on the Roll s tab and then click Complete .
19-35 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D235 Roll One Cross-Connect from an Op tical Circuit to a Second Optical Circuit b. From the Circuit Roll T y pe drop-do wn list, choose Single to indicate that yo u want t o roll a single connection from the Roll Fro m circuit to the Roll T o circuit.
19-36 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D236 Roll Two Cross-Conn ects on One Optic al Circuit Using Automatic Ro uting • A roll can be forced onto th e Roll T o Circuit destination without a v a lid signal by using t he Force V alid Signal button.
19-37 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D236 Roll Two Cross-Connects on One Optical Circuit Using Automatic Routing Figur e 1 9-1 0 Selecting Dual Roll At tr ibutes Step 6 Click Next .
19-38 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D236 Roll Two Cross-Conn ects on One Optic al Circuit Using Automatic Ro uting Figure 1 9-1 1 Setting Roll Routing Pr efer enc es Step 13 T o route the circuit ov er a protected path, check Fully Protected Path .
19-39 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D236 Roll Two Cross-Connects on One Optical Circuit Using Automatic Routing Step 16 If you check ed Re vie w Route Before Creation in Step 12 : a. In the Roll Route Re vie w an d Edit area, re vie w the circuit rout e.
19-40 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D237 Roll Two Cross-Conn ects on One Optic al Circuit Using Manual Routing DLP-D237 Roll Two Cross-Connects on O ne Optical Circuit Using Manual Routing Step 1 From the V iew men u, choose Go T o Network V iew .
19-41 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D237 Roll Two Cross-Connects on One Optical Circuit Using Manual Routing Step 13 Set the circuit path protect ion: • T o route the circuit on a protected path, leav e Fully Protected Path check ed and continue with Step 14 .
19-42 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D238 Roll Two Cross- Connects from One O ptical Circuit to a Secon d Optical Cir cuit Note Y ou cannot complete a ro ll if you cancel led the sibling roll. Y ou must complete the two rolls together .
19-43 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D238 Roll Two Cross-Connects from One Op tical Circuit to a Second Optical Circuit Step 9 Complete one of the follo wing : • If multiple Roll Fro m paths exist, th e Select Roll From dialog box appears.
19-44 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D239 Delete a Roll DLP-D239 Delete a Roll Step 1 From the V iew men u, choose Go T o Network V iew . Step 2 Click the Circ uits > Rolls tabs. Step 3 Click the rolled circuit that you w ant to delete.
19-45 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D241 Clear an MS-SPRing Manual Ring Switch Step 1 From node or netw ork vie w , click the Cir cuits > Rolls tabs. Step 2 Click the rolled circuit that you w ant to cancel.
19-46 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D242 Create an MS -SPRing on a Single Node DLP-D242 Create an MS-SPRing on a Single Node Step 1 In node vie w , click the Pr ovisioning > MS -SPRing tabs.
19-47 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D243 Create a VLAN DLP-D243 Create a VLAN Step 1 From the V iew men u, choose Go to Network V i ew . Step 2 From the T ools menu, ch oose Manage VLANS . Step 3 In the All VLANs dialog box, click Cr eate .
19-48 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D244 Use the Reinitialization Tool to Clea r the Database and Up load Software (Windows) DLP-D244 Use the.
19-49 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D244 Use the Re initializa tion Tool to Clear the Database an d Upload Software (Windows) • User ID—Enter the user ID needed to access the node. • Password—Enter the password for the user ID.
19-50 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D245 Use the Reinitialization Tool to Cl ear the Database and Upload Software (UNIX) DLP-D245 Use the Rei.
19-51 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D246 Provision E-Series Ethernet Card Mode Step 5 Click Go . Caution Before continuing with t he next st ep, verify t hat the database to upload is corr ect.
19-52 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D247 Change an STM- N Card Step 6 Repeat Steps 1 through 5 for other nodes, as ne cessary .
19-53 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D248 Delete VLANs Step 5 Complete the “NTP-D16 Install STM-N Card s and Connectors” procedure on page 2-7 . Step 6 Return to your ori ginating procedure (NTP).
19-54 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D249 Provision IP Settings Step 2 Click the Pro visioning > Network > General tabs. Step 3 Complete the follo wing informati on in the f ields listed: • IP Address—T ype the IP address assigned to the ONS 154 54 SDH node.
19-55 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D249 Provision IP Settings • Net/Subnet Mask Length—T ype the subnet mask length (decimal number representin g the subnet mask length in bits) or click the arro ws to adjust th e subnet mask length.
19-56 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D249 Provision IP Settings Step 6 Click OK . The network vie w appears. The node icon appears in gray , during which time you cannot access the node. Step 7 Double-click the node icon when it b ecomes green.
19-57 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D250 Set Up or Change Open Shortest Path First Protocol DLP-D250 Set Up or Change Open Shortest Path First Protocol Step 1 In node vie w , click the Pr ovisioning > Netw ork > OSPF tabs.
19-58 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D250 Set Up or Change Open Shortest Path First Protocol Step 5 Provision the OSPF pr iority and interv al settings: The OSPF priority and interv al defaults are ones most commonly used b y OSPF routers.
19-59 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D251 Set Up or Change Routing Information Protocol • Retransmit Int (sec)—Sets the time th at will elapse before a packet is resent. Fi ve seconds is the default.
19-60 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D254 TCC2/TCC2P Card Active/Standby Switch Test Step 6 If you want to complete an address summary , comp lete the following steps. If not, con tinue with Step 7 .
19-61 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D255 Cross-Connect Card Side Switch Test Step 9 After the node ic on turns gree n (within 1 to 2 minutes), dou ble-click it. On t he shelf graphi c, observe the following: • The pre vious standby TCC2/TCC2P card has a green A CT LED.
19-62 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D256 View Ethernet Statistics PM Parameters Step 5 Click the Maintenance > Cross-Connect tabs. Step 6 In the Cross-Connect Cards area, make a note of the activ e and standb y slots.
19-63 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D257 View Ethernet Utilizatio n PM Parameters Step 3 Click the Statistics subtab . Step 4 Click Refresh . Performance monitoring statistics appear for each port on the card.
19-64 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D258 View Ethernet History PM Parameters DLP-D258 View Ethernet History PM Parameters Step 1 In node vie w , double-click the E-Se ries or G-Series Ethernet card where you w ant to vie w PM counts.
19-65 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D260 Set Auto-Refresh In terval for Displayed PM Counts • 15 min : This option displays the specif ied PM counts in fi fteen-minute time interv als. • 1 hour : This optio n displays th e specified PM coun ts in one- hour time i ntervals.
19-66 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D261 Refresh PM Counts for a Different Port DLP-D261 Refresh PM Counts for a Different Port Step 1 In node vie w , double-cl ick the STM-N card where you w ant to vie w PM counts.
19-67 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D262 Filter the Display of Circuits • Direction—Choose one to f ilter circui ts based on direction: An y (direction not used t o filt er circuits), 1-way (display only o ne-way circuits), or 2-way (display only two-way circuits).
19-68 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D263 Edit S NCP Dual-Ring Inte rconnect Circuit Hold-Off Timer Step 5 Click OK . Circuits match ing the attrib utes in th e Filter Circuit s dialog box appear in th e Circuits wi n d ow .
19-69 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D264 Provision a J1 Path Trace o n Circuit Source and Destination Ports DLP-D264 Provision a J1 Path Trac.
19-70 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D264 Provision a J1 Path T race on Circuit Source and Destination Ports Note If neither port is on a transmi t/recei ve card , you will not be ab le to complete this p rocedure.
19-71 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D264 Provision a J1 Path Trace o n Circuit Source and Destination Ports d. (Check box visibility depends o n card selection) Click the Disable AIS on C2 Mis-Match check box if you w ant to suppress the A IS when a C2 mismatch occurs.
19-72 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D265 Change the Login Legal Disclaimer When you di splay the de tailed circuit window , path trace is indicated b y an M ( manual path trace) or an A (automatic path trace) at the circuit source and destination p orts.
19-73 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D266 Change IP Settings Step 4 Click Apply . Step 5 Return to your ori ginating procedure (NTP). DLP-D266 Change IP Settings Caution Changing the node IP address, subnet mask, or II OP listener port causes the TCC2/TCC2P cards to reboot.
19-74 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D268 Apply a Custom Networ k View Backgr ound Map If you changed a netw ork f ield that will cause the no de to reboot, the Change Netw ork Conf iguration confi rmation dialog box appears.
19-75 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D269 Enable Dialog Bo x Do-Not-Display Option DLP-D269 Enable Dialog Box Do-Not-Display Option Note If an.
19-76 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D271 Change Node Se curity Policy on a Single Node Step 2 If you want to modify th e idle user timeout pe.
19-77 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D272 Change Node Security Poli cy on Multiple Nodes DLP-D272 Change Node Security Policy on Multiple Nodes Step 1 From the V iew men u, choose Go to Network V i ew .
19-78 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D273 Modify SNMP Trap De stination • Disable Inacti v e User—If check ed, disables users wh o do not log into the nod e for the period of time specified i n the Inacti v e Duration box.
19-79 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D293 Perform a Manual Span Upgrade on a Two-Fiber MS-SPRing Step 9 SNMP settings are no w co nf igured. T o view SNMP information f or each node, highligh t the node IP address in the T rap Destinations area of the SNMP windo w .
19-80 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D294 Perfor m a Manual Span Upgr ade on a Four-Fi ber MS-SPRing Step 10 When cards in both endpoi nt node.
19-81 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D295 Perform a M anual Span Upgrade on an SNCP Step 8 V erify that the transmit signal f alls wit hin the acceptabl e range. See T able 2-4 on page 2-17 for STM-N card transmit and recei v e le v els.
19-82 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D296 Perfor m a Manual Span Up grade on a 1+1 Protec tion Group Step 10 Complete the “DLP-D198 Clear an.
19-83 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D297 Perform a Manual Spa n Upgrade on an Unprotected Span Step 9 V erify that the transmit signal f alls wit hin the acceptabl e range. See T able 2-4 on page 2-17 for STM-N card transmit and recei v e le v els.
19-84 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D298 Check th e Network for Alar ms and Conditions Step 6 When you ha ve f inished Steps 3 through 5 for bo th nodes, install the ne w STM-N cards in both endpoints and attach the f iber to t he cards.
19-85 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D299 Initiate an M S-SPRing Span Lockout DLP-D299 Initiate an MS-SPRing Span Lockout Caution T raf f ic is not protected during a span lockout. Step 1 From the V iew men u, choose Go to Network V i ew .
19-86 Cisco ONS 15454 SDH Procedure Guide, R7.2 October 2007 Chapter 19 DLPs D200 to D299 DLP- D299 Initiate an MS-SPRing Span Lockout Step 6 From the File menu, choose Close .
デバイスCisco Systems D200の購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
Cisco Systems D200をまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはCisco Systems D200の技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。Cisco Systems D200の取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。Cisco Systems D200で得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
Cisco Systems D200を既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はCisco Systems D200の不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、Cisco Systems D200に関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちCisco Systems D200デバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。