CoscoメーカーSLRの使用説明書/サービス説明書
ページ先へ移動 of 40
Oct. 2005, Rev. 9 UL325 COMPLIANCE REQUIRES THE USE OF CONT ACT EDGES OR PHOTOELECTRIC CONTROLS ON ALL AUTOMA TIC OR REMOTEL Y -CONTROLLED GA TE OPERA TORS.
SLR • SLC • SLD OPERATOR INSTALLATION GUIDE - 2 - TABLE OF CONTENTS PRE-INST ALLA TION INFORMA TION Gate Operator Classifications .....................................................................................................................
SLR • SLC • SLD OPERATOR INSTALLATION GUIDE - 3 - Read the following before beginning to install OSCO slide gate operators: 1. Read the yellow “Safety Instructions” brochure enclosed with the packet of information. If you do not have one, please call OSCO at 1-800-333-1717 to request one.
SLR • SLC • SLD OPERATOR INSTALLATION GUIDE - 4 - 10-04-6 WIRING SPECIFICATIONS 1. Select from the chart at the bottom of this page corre- sponding to the model, voltage and horsepower rating of your operator . 2. The distance shown on the chart is measured in feet from the operator to the power source.
SLR • SLC • SLD OPERATOR INSTALLATION GUIDE - 5 - PAD MOUNTING INSTRUCTIONS FOR MODELS SLR, SLC & SLD Before installing, make sure the gate rolls or slides freely , and that all exposed rollers are properly covered.
SLR • SLC • SLD OPERATOR INSTALLATION GUIDE - 6 - GATE BRACKET AND CHAIN ASSEMBLY INSTRUCTIONS Assemble a gate bracket (1) to the front edge of the gate, using two U-bolts (2), and mounting hardware (3). Before tightening down completely , be sure the bracket is p arallel to the gate.
SLR • SLC • SLD OPERATOR INSTALLATION GUIDE - 7 - VENT PLUG INSTALLATION Gear reducers used in OSCO gate operators will have solid plugs installed prior to shipment in order to keep the oil inside fro m spilling out during shipping. A vent plug has been provided to replace this plug during installation.
SLR • SLC • SLD OPERATOR INSTALLATION GUIDE - 8 - ELECTRICAL CONNECTION AND ADJUSTMENTS All OSCO gate operators are supplied with a power disconnect switch to turn on and off the power supply available to the operator .
SLR • SLC • SLD OPERATOR INSTALLATION GUIDE - 9 - Auto Close Timer Adjustment: This 270-degree adjustable potentiometer will signal the operator to close automatically , provided no open, reversing or obstruction signals are present from the fully-open position.
SLR • SLC • SLD OPERATOR INSTALLATION GUIDE - 10 - Y ou must follow all required safety precautions and instructions at all times. Review the safety brochure included with the operator . If any pages are missing or unreadable, cont act OSCO at 1-800-333-1717 to request additional copies.
SLR • SLC • SLD OPERATOR INSTALLATION GUIDE - 11 - CURRENT SENSING ADJUSTMENTS Because gates vary in construction and may have different force requirements in the open and close directions to move, the OSCO control board has separate Multi-turn potentiometers for adjusting in both directions independently .
SLR • SLC • SLD OPERATOR INSTALLATION GUIDE - 12 - ONBOARD L.E.D. INDICATOR DESCRIPTIONS Control Board L.E.D. Indicators: OPEN This indicator is lit when an open signal is present. This signal can come from such devices as button stations, radio receivers, keypads and telephone entry systems.
SLR • SLC • SLD OPERATOR INSTALLATION GUIDE - 13 - IMPORTANT NOTES FOR INSTALLATION OF MASTER/SLAVE APPLICATIONS When setting up Master/Slave gate operators, it is best to make adjustments and run each operator individually . T o do this, simply: a.
SLR • SLC • SLD OPERATOR INSTALLATION GUIDE - 14 - CHARGER BOARD SLEEP MODE When primary AC power is not available, the operator will continue to operate in battery only mode if the charger board is set in its RUN mode ( see Battery Backup Charger Configuration ).
SLR • SLC • SLD OPERATOR INSTALLATION GUIDE - 15 - CONTROL and ACCESSORY CONNECTION ILLUSTRATIONS.
SLR • SLC • SLD OPERATOR INSTALLATION GUIDE - 16 - CONTROL and ACCESSORY CONNECTION ILLUSTRATIONS.
SLR • SLC • SLD OPERATOR INSTALLATION GUIDE - 17 - CONTROL and ACCESSORY CONNECTION ILLUSTRATIONS.
SLR • SLC • SLD OPERATOR INSTALLATION GUIDE - 18 - 12-06-12 CONTROL and ACCESSORY CONNECTION ILLUSTRATIONS AC MODELS ONL Y.
SLR • SLC • SLD OPERATOR INSTALLATION GUIDE - 19 - LOOP LAYOUT ILLUSTRATION Refer to Connection Descriptions on page 10 and Loop Accessory Connections on page 18 for details.
SLR • SLC • SLD OPERATOR INSTALLATION GUIDE - 20 - EDGE LAYOUT ILLUSTRATION #1 Refer to Connection Descriptions on page 10 and Contact Edge Connections on page 17 for details.
SLR • SLC • SLD OPERATOR INSTALLATION GUIDE - 21 - EDGE LAYOUT ILLUSTRATION #2 Refer to Connection Descriptions on page 10 and Contact Edge Connections on page 17 for details.
SLR • SLC • SLD OPERATOR INSTALLATION GUIDE - 22 - PHOTO EYE ILLUSTRATION Refer to Connection Descriptions on page 10 and Photo Eye Connections on page 17 for details.
SLR • SLC • SLD OPERATOR INSTALLATION GUIDE - 23 - PICKET GATE ILLUSTRATION Refer to Connection Descriptions on page 10 and Accessory Connections on pages 15-18 for additional details.
SLR • SLC • SLD OPERATOR INSTALLATION GUIDE - 24 - TRACK GATE ILLUSTRATION.
SLR • SLC • SLD OPERATOR INSTALLATION GUIDE - 25 - TROUBLESHOOTING Operator fails to start: A . If the operator has been running a large number of cycles, the motor may have gotten hot and tripped the overload. Allow the motor to cool down and the overload will reset automatically .
SLR • SLC • SLD OPERATOR INSTALLATION GUIDE - 26 - MODEL SLR MECHANICAL PARTS EXPLODED VIEW 10-04-6.
SLR • SLC • SLD OPERATOR INSTALLATION GUIDE - 27 - MODEL SLR MECHANICAL PARTS LIST REF NO. P ART NO. DESCRIPTION 1 2300-907 Operator Cover 2510-354 Plunger Reset Assembly 2500-2240 Plunger Reset B.
SLR • SLC • SLD OPERATOR INSTALLATION GUIDE - 28 - MODEL SLC MECHANICAL PARTS EXPLODED VIEW 10-04-6.
SLR • SLC • SLD OPERATOR INSTALLATION GUIDE - 29 - MODEL SLC MECHANICAL PARTS LIST REF NO. P ART NO. DESCRIPTION 1 2300-907 Operator Cover 2510-354 Plunger Reset Assembly 2500-2240 Plunger Reset B.
SLR • SLC • SLD OPERATOR INSTALLATION GUIDE - 30 - 10-04-6 MODELS SLR • SLC CONTROL BOX PARTS LIST REF NO. P ART NO. DESCRIPTION 1 2100-1778-PL T Control Box Wrapper 2 2100-1762 T erminal S trip Bracket, output side 3 2100-1761 T erminal S trip Bracket, input side 4 2300-735 Heyco Bushing, 1.
SLR • SLC • SLD OPERATOR INSTALLATION GUIDE - 31 - MODEL SLD MECHANICAL PARTS EXPLODED VIEW 10-04-6.
SLR • SLC • SLD OPERATOR INSTALLATION GUIDE - 32 - MODEL SLD MECHANICAL PARTS LIST REF NO. P ART NO. DESCRIPTION 1 2300-907 Operator Cover 2510-354 Plunger Reset Assembly 2500-2240 Plunger Reset B.
SLR • SLC • SLD OPERATOR INSTALLATION GUIDE - 33 - 10-04-6 MODEL SLD CONTROL BOX PARTS LIST REF NO. P ART NO. DESCRIPTION 1 2100-1778-PL T Control Box Wrapper 3 2100-1762 T erminal S trip Bracket, output side 4 2100-1761 T erminal S trip Bracket, input side 5 2200-122 Heyco Bushing, .
SLR • SLC • SLD OPERATOR INSTALLATION GUIDE - 34 - BATTERY MAINTENANCE The gel-cell batteries in this operator require no routine maintenance. For assured continued performance, they should be replaced every year .
MA TERIAL SAFETY DA T A SHEET MOBIL SHC 634 1 . PRODUCT AND COMP ANY IDENTIFICA TION PRODUCT NAME: MOBIL SHC 634 SUPPLIER: EXXONMOBIL CORPORA TION 3225 GALLOWS RD.
sso 3 Imperial Oil MA TERIAL SAFETY DA T A SHEET Date Prepared: June 12, 1997 Supersedes: February 02, 1996 MSDS Number: 08068 Cette fiche signaletique ast aussi disponible en francais 1. PRODUCT INFORMA TION Product Identifier: ESSO GEAR OIL GX 75W-90 Application and Use: Transmission adn gear lubricant.
SLR • SLC • SLD OPERATOR INSTALLATION GUIDE - 37 -.
SLR • SLC • SLD OPERATOR INSTALLATION GUIDE - 38 - PREVENTATIVE MAINTENANCE GENERAL: OSCO gate operators are designed for many years of trouble-free operation and, under recommended operating conditions, will require only minimal maintenance.
SLR • SLC • SLD OPERATOR INSTALLATION GUIDE - 39 - This page intentionally left blank..
SLR • SLC • SLD OPERATOR INSTALLATION GUIDE - 40 - By signing this installation checklist, I/we hereby certify that each item listed and checked above has been covered by the installer and is clearly understood by the customer .
デバイスCosco SLRの購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
Cosco SLRをまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはCosco SLRの技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。Cosco SLRの取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。Cosco SLRで得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
Cosco SLRを既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はCosco SLRの不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、Cosco SLRに関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちCosco SLRデバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。