Installation Manual MMI-20020994, Rev AA December 2013 Micro Motion ® Fork Viscosity Meters Direct insertion viscosity meter installation.
Safety and approval information This Micro Motion product complies with all applicable European directives when properly installed in accordance with the instructions in this manual. Refer to the EC declaration of conformity for directives that apply to this product.
Contents Chapter 1 Planning ........................................................................................................................... 1 1.1 Installation checklist ......................................................................
Contents ii Micro Motion Fork Viscosity Meter.
1 Planning Topics covered in this chapter: • Installation checklist • Best practices • Power requirements • Other installation considerations • Recommended installations for short-stem meters • Perform a meter check (pre-installation) 1.
1.2 Best practices The following information can help you get the most from your meter. • Handle the meter with care. Follow local practices for lifting or moving the meter. • Perform a Known Density Verification (KDV) check of the meter prior to installing the meter in your system.
Power cable recommendations for explosion-proof/flameproof meters Minimum wire gauge (AWG per feet) Figure 1-1: 300 600 900 1200 150 0 1800 2100 2400 2700 300 0 Dis t anc e of I nst all a t ion (f t) 21 .6V 24 V 14 15 16 17 18 19 20 21 22 23 24 25 26 AWG Maximum Minimum W ire Gauge Minimum wire area (mm 2 per meter) Figure 1-2: 0.
1.4 Other installation considerations A variety of external factors exist that affect the ability of the meter to operate successfully. To ensure that your system works correctly, consider the effects of these factors when designing your installation.
Region of measurement boundary or sensitivity Figure 1-3: B A C STATUS SCROLL SELECT A. Long axis B. Short axis C. Sensitive, or effective, region When installing the meter, if part of this effective region or volume is interfered with because of the pipework or fittings a boundary effect exists (see Figure 1-4 ).
Example of pipeline installation (with boundary effect) Figure 1-4: A STATUS SCROLL SELECT A. Pipe walls interrupt effective region of meter sensitivity 1.4.2 Flow rate considerations You must maintain flow rates and velocities to be relatively constant within the limits specified for the meter.
• Maintain a back pressure on the system sufficient to prevent gas break out. • Maintain flow velocity at the sensor within the specified limits. 1.4.4 Solids measurement considerations Consider the following to avoid issues related to solids contamination: • Avoid sudden changes of the fluid velocity that may cause sedimentation.
Standard installation types: short-stem meters Table 1-1: Installation type: Free stream T-Piece Flow-through chamber Meter placement Meter tines are inserted directly into the main fluid flow. The meter must always be installed horizontally and with the tines oriented to allow flow through or between the gap of the tines.
Standard installation types: short-stem meters (continued) Table 1-1: Installation type: Free stream T-Piece Flow-through chamber Recommendations Do not use with: • Dirty fluids • Low or unstable .
Power supply wiring terminals Figure 1-5: A A. 24 VDC 4. Perform a Known Density Verification (KDV) check. The Known Density Verification procedure is used to verify that the meter's current operation matches the factory calibration. If the meter passes the test, then it has not drifted or changed since its factory calibration.
2 Mounting Topics covered in this chapter: • Mount in free-stream application (flanged fitting) • Mount in free-stream application (weldolet fitting) • Mount with a T-piece (flanged fitting) •.
Free-stream (flanged fitting) meter installation Figure 2-1: B A STATUS SCROLL SELECT Plan view of a vertical pipe installation A. 4-inch pipe for horizontal installations; 6-inch (152 mm) pipe for vertical installations B. Size the recess mount so that the meter tines are inserted fully into the liquid [approximately 2.
Procedure See Figure 2-2 for information on installing the meter (with a weldolet fitting) in a free- stream application. Important You must always install the meter horizontally and oriented to allow flow in the gap between the tines, irrespective of the pipeline orientation (horizontal or vertical).
Note - Flow velocity at the pipe wall and fluid viscosity must be within the limits shown to ensure that the fluid within the pocket is refreshed in a timely manner. This installation will not respond as rapidly as the free-stream installation to step changes in viscosity.
2.4 Mount with a flow-through chamber Flow-through chambers are manufactured by Micro Motion, and are available with either weld-prepared ends or with flange or compression fittings for connection into the process pipelines. They are available with 1- inch NB, 2-inch NB, or 3-inch NB inlet and outlet pipes.
Flow-through chamber meter installation Figure 2-4: A A. Optional temperature port Note • This flow-through chamber is a direct-insertion type chamber that does not have a thermowell and uses a ¾ -inch Swagelok connection.
Open-tank meter installation (long stem) Figure 2-5: 2. Confirm the meter tines are away from the tank wall. Meter placement (away from tank wall) Figure 2-6: B A A B A.
Meter placement (immersed in fluid) Figure 2-7: 4. Confirm the meter tines are placed away from objects and disturbed flow. Meter placement (distance from objects and disturbed flow) Figure 2-8: A A A. 200 mm 5. If flow exists, confirm the meter tines are aligned so that the flow is directed towards or through the gap between the tines.
Meter placement (flow direction through tine gap) Figure 2-9: 6. Confirm the meter tines are kept away from deposit buildup. Meter placement (away from deposit buildup) Figure 2-10: 2.6 Mount in a closed tank (long-stem meter) 1. Attach the long-stem meter using the fitted flange attachment (shipped with the product).
Closed-tank installation (fitted flange attachment) Figure 2-11: 2. (Optional) To vary the insertion depth of the meter, mount the meter on a standoff section that attaches to the flange (not provided).
Closed-tank installation (with standoff) Figure 2-12: A. Standoff height can vary (provided by customer) 3. Confirm the meter tines are away from the tank wall. Meter placement (away from tank wall) Figure 2-13: B A A B A. 50 mm B. 200 mm 4. Confirm the meter tines are immersed in fluid.
Meter placement (immersed in fluid) Figure 2-14: 5. Confirm the meter placement has allowed for the flexing of the tank lid to prevent the meter from being pushed towards a tank wall or into the path of disturbed flow. Meter placement (allowance for tank lid flexing) Figure 2-15: A A A.
Meter placement (distance from objects and disturbed flow) Figure 2-16: A A A. 200 mm 7. If flow exists, confirm the meter tines are aligned so that the flow is directed towards or through the gap between the tines. Meter placement (flow direction through tine gap) Figure 2-17: 8.
Meter placement (away from deposit buildup) Figure 2-18: 2.7 Attach the PFA ring and circlip You attach the PFA ring (and circlip) around the boss on the underside of the meter flange to center the meter tines within a 2-inch Schedule 40 or 80 pipe. The circlip holds the ring in place.
Attaching a PFA ring and circlip Figure 2-19: B A C A. Circlip (not provided with self-locking PFA rings) B. PFA ring C. PFA ring and circlip attached 2.8 Rotate the electronics on the meter (optional) You can rotate the transmitter on the meter up to 90°.
2.9 Rotate the display on the transmitter (optional) The display on the transmitter electronics module can be rotated 90° or 180° from the original position. Display components Figure 2-21: B C D A D E A. Transmitter housing B. Sub-bezel C. Display module D.
7. If you have removed the display screws, line them up with the matching holes on the sub-bezel, then reinsert and tighten them. 8. Place the display cover onto the main enclosure. 9. Turn the display cover clockwise until it is snug. 10. Power up the meter.
Mounting 28 Micro Motion Fork Viscosity Meter.
3 Wiring Topics covered in this chapter: • Available output terminals and wiring requirements • Explosion-proof/flameproof or non-hazardous output wiring • Processor wiring for remote-mount 2700 FOUNDATION fieldbus ™ option • Wiring to external devices (HART multidrop) • Wiring to signal converters and/or flow computers 3.
3.2 Explosion-proof/flameproof or non-hazardous output wiring 3.2.1 Wire the Analog outputs version in an explosion-proof/ flameproof or non-hazardous area CAUTION! Meter installation and wiring should be performed by suitably trained personnel only in accordance with the applicable code of practice.
Wiring the Analog outputs version Figure 3-1: mA1+ HART RS-485 PWR mA2 A A B RS-485 A RS-485 B C D B B A A A A. 24 VDC B. R load (250 Ω resistance) C. HART-compatible host or controller; and/or signal device D. Signal device Note For operating the milliamp outputs with a 24V supply, a maximum total loop resistance of 657 Ω is allowed.
3.2.2 Wire the Discrete output version in an explosion-proof/ flameproof or non-hazardous area CAUTION! Meter installation and wiring should be performed by suitably trained personnel only in accordance with the applicable code of practice. Procedure Wire to the appropriate output terminal and pins (see Figure 3-2 ).
Wiring the Discrete output version Figure 3-2: mA1+ HART RS-485 PWR DO A A B RS-485 A RS-485 B C E D B A A A A. 24 VDC B. R load (250 Ω resistance) C. HART-compatible host or controller; and/or signal device D. R load (500 Ω resistance recommended) E.
• Metal cable glands should be used where the cables enter the meter amplifier box. Unused cable ports should be fitted with metal blanking plugs. 3.
RS-485 output and cable entity parameters (continued) Table 3-2: Maximum external inductance (L o ) 260 µH Maximum external inductance/resistance ratio (L o /R o ) 124.4 µH/ Ω 3.3.2 Prepare the 4-wire cable Important For user-supplied cable glands, the gland must be capable of terminating the drain wires.
4-wire cable preparation Figure 3-3: Cable layout Run conduit to sensor Metal conduit Wrap the drain wires twice around the shield and cut off the excess drain wires. Micro Motion cable gland Pass the wires through the gland. Terminate the drain wires inside the gland.
4-wire cable shielding Figure 3-4: Assemble the Gland 1. Fold the shield or braid back over the clamping insert and 1/8 inch (3 mm) past the O-ring. 2. Install the gland body into the conduit opening on the core processor housing. 3. Insert the wires through gland body and tighten the gland nut onto the gland body.
• Twisted pair construction. • Applicable hazardous area requirements, if the core processor is installed in a hazardous area. • Wire gauge appropriate for the cable length between the core processor and the transmitter. • Wire gauge of 22 AWG or larger, with a maximum cable length of 1000 feet.
3.4 Wiring to external devices (HART multidrop) You can wire up to three external HART devices with the meter. The following information provides wiring diagrams for making those connections in safe and hazardous environments.
3.4.1 Wire external HART devices in an explosion-proof/ flameproof or non-hazardous area Wiring external devices in an explosion-proof/flameproof or non-hazardous area Figure 3-6: 250 Ω 24 VDC mA1+ HART A B C E D A. HART Device 1 B. HART Device 2 C. HART Device 3 D.
3.5 Wiring to signal converters and/or flow computers For meters with a Time Period Signal (TPS) output, you can wire the meter to an signal converter or flow computer directly. The following information provides wiring diagrams for making those connections in safe and hazardous environments.
3.5.1 Wire to a signal converter/flow computer in an explosion-proof/flameproof or non-hazardous area Wiring to a signal converter/flow computer in an explosion-proof/ flameproof or non-hazardous area Figure 3-7: mA1+ HART RS-485 PWR TPS A A B 24 VDC RS-485 A RS-485 B A B A.
4 Grounding The meter must be grounded according to the standards that are applicable at the site. The customer is responsible for knowing and complying with all applicable standards.
Grounding 44 Micro Motion Fork Viscosity Meter.
Grounding Installation Manual 45.
*MMI-20020994* MMI-20020994 Rev AA 2013 Micro Motion Inc. USA Worldwide Headquarters 7070 Winchester Circle Boulder, Colorado 80301 T +1 303-527-5200 T +1 800-522-6277 F +1 303-530-8459 www.micromotion.com Micro Motion Europe Emerson Process Management Neonstraat 1 6718 WX Ede The Netherlands T +31 (0) 318 495 555 F +31 (0) 318 495 556 www.
デバイスEmerson Micro Motion Fork Viscosity Metersの購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
Emerson Micro Motion Fork Viscosity Metersをまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはEmerson Micro Motion Fork Viscosity Metersの技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。Emerson Micro Motion Fork Viscosity Metersの取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。Emerson Micro Motion Fork Viscosity Metersで得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
Emerson Micro Motion Fork Viscosity Metersを既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はEmerson Micro Motion Fork Viscosity Metersの不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、Emerson Micro Motion Fork Viscosity Metersに関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちEmerson Micro Motion Fork Viscosity Metersデバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。