AllardメーカーEB120の使用説明書/サービス説明書
ページ先へ移動 of 12
EB120 Advanced Ethanol Boiler 1 EB120 Advanced Ethanol Boiler Allard Research and Development Copyright © 2008 – Allard Research and Development, LLC.
EB120 Advanced Ethanol Boiler 2 FOREWORD Thank you for purchasing the Allard Research and Development EB120 – Advanced Ethanol Boiler . Please take the time to read these instructions before you begin as they contain important information about the installation and maintenance requirements, as well as safety instructions.
EB120 Advanced Ethanol Boiler 3 Chapter One : Specifications Model Power (kw) V oltage (V) Phase (N~) Current (A) Dimensions ( W× W × H) EB-120 12.0 230/400 1/3 52.
EB120 Advanced Ethanol Boiler 4 6 Heat element Heat element 7 Proportional Solenoid Automatically controls the cooling water flow 8 Cooling W ater Out Output that connects to the Still cooling water i.
EB120 Advanced Ethanol Boiler 5 3 Drain Control Operates Drain, and used to set Cooling W ater Flow Rate 4 Set Preset Run T ime and Distillation Control T emperature 5 △ Increase button 6 ▽ Decrease button 7 C/F & Enter Enter Key .
EB120 Advanced Ethanol Boiler 6 Beer, Water, and Steam connections a. The water supply pipe and steam pipe should comply with local standards. b. Connect the cooling water inlet of the EB120 to the main water supply using a flexible hose with 3/4-inch fittings.
EB120 Advanced Ethanol Boiler 7 EB120 T emperature Probe Installations of power supply and control cables 1. Confirm the correct voltage of power supply and wires.
EB120 Advanced Ethanol Boiler 8 EB120 Circuit Board Chapter Four : T esting and operation (1) Once the installation has been completed and checked, turn on power and water supplies and carry out the following test.
EB120 Advanced Ethanol Boiler 9 drain valve opens (drain indicator LED green). (9) Y ou can also drain the boiler manually by pressing the drain key when the system has stopped heating. The drain indicator LED will indicate as red during this operation.
EB120 Advanced Ethanol Boiler 10 The water flow control can be fine tuned to help tightly control the specific characteristics of your particular still, and can help regulate varying input water pressures. There are four different presets that can be chosen for use during operation.
EB120 Advanced Ethanol Boiler 11 control panel is normal, and indicator LED for heating is on, but there is no steam output 1. Main circuit board 2. Relay circuit board 3.
EB120 Advanced Ethanol Boiler 12 kettles from most hardware stores, brew supply stores, and are available online from Allard Research and Development. Follow the instructions supplied with the crystals and allow sufficient time for the solution to dissolve the scale before flushing out the boiler.
デバイスAllard EB120の購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
Allard EB120をまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはAllard EB120の技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。Allard EB120の取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。Allard EB120で得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
Allard EB120を既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はAllard EB120の不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、Allard EB120に関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちAllard EB120デバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。