GEメーカーZV48Rの使用説明書/サービス説明書
ページ先へ移動 of 16
1 If you have questions , call 800.GE.CARES or visit our website at: www .monogram.com In s tall a ti o n I nst ru ct i o ns 30", 36" and 48" Professional Restaurant Style V ent Hoods M.
2 Installation Instructions W ARNING: TO REDUCE THE RISK OF FIRE, ELECTRICAL SHOCK OR INJURY TO PERSONS, OBSERVE THE FOLLOWING: A. Use this unit only in the manner intended by the manufacturer . If you have any questions, contact the manufacturer . B.
3 12" 22-1/2" 35-15/16" 35-15/16" 25" 10" Installation Instructions PRODUCT DIMENSIONS Model ZV36R Model ZV48R Model ZV30R CONTENTS Product Dimensions ......................................................... 3 Installation Clearances .
4 Advance Planning INST ALLA TION CLEARANCES These vent hoods are designed to be installed onto a wall or beneath a soffit or cabinet. Installation with Warming Shelf • Hoods must be installed 32" Min., 38" Max over any type cooking sur face when warming shelf is used.
5 Advance Planning DETERMINE INST ALLA TION HEIGHT , DUCT COVER ACCESSORIES Restaurant-Style Hoods Restaurant-Style Hoods without Warming Shelf Installed with Shelf Installed 1 *Possible *Possible Act.
6 Advance Planning ADV ANCE PLANNING Ductwork Planning • These vent hoods are equipped for 10" round ductwork. For best per formance, use 10" round ductwork on the 48" wide hoods. 30" and 36" hoods may be transitioned to 8" round.
7 Advance Planning DUCT FITTINGS Equivalent Quantity T otal Duct Piece Length* Used Length 10" round to 8" round 5 ft. Round, 1 ft. straight (per foot length) 90 ° elbow 8" Dia. 52 ft. 10" Dia. 24 ft. 45 ° elbow 8" Dia. 31 ft.
8 Installation Preparation REMOVE THE P ACKAGING • Remove packages from the “V” shaped cardboard section. Remove shipping pads. • Lift the hood out of the box. IMPOR T ANT : Lift the hood by grasping the outside edges of the exhaust opening on the top.
9 P AR TS PROVIDED Locate the parts packed with the hood. 2 Stainless Steel Grease Filters (3 filters with 48" models) Allen W rench For Implement Rods Installation Preparation Duct T ransition with Damper Backguard 2 Implement Rods and 4 Stand-offs Heat Lamp (2 with 48" models) 10 Phillips head screws.
10 • Use a level to draw the cooktop centerline location. Draw the line to ceiling height. • Measure desired distance from the bottom of the hood to the cooking sur face. Note: If you are installing the hood with duct covers, be sure to read “Using Duct Cover Accessories” page 7.
11 1/4" Gap Original Mounting Screws as Shipped Installation Instructions STEP 2A INST ALL HOOD ONTO W ALL • Secure the wood support to 2 or more vertical studs, using at least 2 of the 4 supplied long screws. IMPORT ANT: Screws must penetrate at least 1-1/2" into vertical studs.
12 Installation Instructions STEP 2B Alternate Mounting Method “ A ”“ B ” Centerline to Stud Hood Width and Keyhole Slots At the T op ZV48R 23-9/16" 47-15/16" ZV36R 17-9/16" 35-.
13 Installation Instructions STEP 3 CONNECT DUCTWORK • Install ductwork, making connections in direction of air flow as illustrated. • Secure joints in ductwork with sheetmetal screws. • Wrap all duct joints with duct tape for an airtight seal. • Use duct tape to seal the flange connection.
14 Installation Instructions STEP 7 INST ALL FIL TERS • T o remove the filters, grasp the latch, pull the filter up and lift out. • Drop grease tray into the hood.
15 Installation Instructions STEP 10 INST ALL IMPLEMENT RODS • Use a flat blade screwdriver to install stand-offs into the bottom of the hood. • Align implement rod to stand-offs with the screw hole towards the inside of the hood. Secure the rod to the stand-offs with the supplied Allen wrench.
16 Note: While performing installations described in this book, safety glasses or goggles should be worn. For Monogram ® local service in your area, call 1.800.444.1845. Note: Product improvement is a continuing endeavor at General Electric. Therefore, materials, appearance and specifications are subject to change without notice.
デバイスGE ZV48Rの購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
GE ZV48Rをまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはGE ZV48Rの技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。GE ZV48Rの取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。GE ZV48Rで得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
GE ZV48Rを既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はGE ZV48Rの不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、GE ZV48Rに関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちGE ZV48Rデバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。