GiantメーカーTriplex Ceramic Plunger Pumpの使用説明書/サービス説明書
ページ先へ移動 of 12
Contents: Installation Instructions: page 2 Pump Specifications: pages 3-7 Parts List / Kits: page 8 Torque Specifications: page 8 Exploded View: page 9 Repair Instructions: page 10-11 Warranty Inform.
INSTALLATION INSTRUCTIONS 4. Use of a dampener is necessary to minimize pulsation at drive elements, plumbing, connec- tions, and other system areas. The use of a dampener with Giant Industries, Inc. pumps is optional, although recommended by Giant Industries, Inc.
P217A-3100/5100 HORSEPOWER REQUIREMENTS RPM GPM 800 PSI 1200 PSI 1500 PSI 1700 PSI 2000 PSI 1725 1.7 0.9 1.4 1.7 2.0 2.3 3000 3.0 1.7 2.5 3.1 3.5 4.1 3200 3.
P218A-3100/5100 HORSEPOWER REQUIREMENTS RPM GPM 800 PSI 1200 PSI 1500 PSI 1700 PSI 2000 PSI 1150 2.1 1.2 1.7 2.2 2.5 2.9 1450 2.6 1.5 2.2 2.7 3.1 3.6 1750 3.
V olume ....................................................................................................... Up to 4.2 GPM Discharge Pressure ..................................................................................... Up to 2000 PSI Inlet Pressure .
Specifications Model P220A-3100/5100 V olume ....................................................................................................... Up to 4.7GPM Discharge Pressure ......................................................................
Specifications Model P221A-3100 NOTE: In order to drive the pump from the side opposite the present shaft extension, simply remove the valve casing from the crank- case and rotate the pumps 180 degrees to the desired position. Be certain to rotate the seal case (item #20) as well, so that the weep holes are down at the six o'clock position.
ITE M PART NO. DESCRIPTION QTY. 1 08300 Crankcase 1 2 08301 Dipstick (Except P217, black ) 1 2 08480 Dipstick (P217, red ) 1 3 08302 Crankcase Plug Cover 1 3A 07190 Drain Plug & Gasket 1 4 08005 O-Ring 1 5 08185 Oil Drain Plug 1 6 07188-0100 Screw, 316 S.
Exploded View - P200A-3100/5100 Series Unique for P221- 3100 or.
REPAIR INSTRUCTION - P200A-3100/5100 SERIES Disassembly sequence of fluid end of P200A-3100/5100 series pump Note: Always take time to lubricate all metal and nonmetal parts with a light film of oil before reassembly. This step will ensure proper fit, at the same time protecting the pump nonmetal parts (i.
Disassembly sequence of the back end of the P200A-3100/5100 series pump. 1 ) Before you begin, drain the oil from the crankcase. 2) Remove the crankcase cover (3) and o-ring (4) from the crankcase (1). To remove the crankshaft (13), remove the bearing cover (7) and sight glass (8).
GIANT INDUSTRIES, INC. , 900 N. Westwood Ave., P.O. Box 3187, Toledo, Ohio 43607 PHONE (419) 531-4600, FAX (419) 531-6836, www.giantpumps.com Copyright 1998 Giant Industries, Inc. P200A-3100/5100 DIMENSIONS (mm) 3/98 P200A-3100.PM6 GIANT INDUSTRIES LIMITED WARRANTY Giant Industries, Inc.
デバイスGiant Triplex Ceramic Plunger Pumpの購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
Giant Triplex Ceramic Plunger Pumpをまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはGiant Triplex Ceramic Plunger Pumpの技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。Giant Triplex Ceramic Plunger Pumpの取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。Giant Triplex Ceramic Plunger Pumpで得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
Giant Triplex Ceramic Plunger Pumpを既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はGiant Triplex Ceramic Plunger Pumpの不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、Giant Triplex Ceramic Plunger Pumpに関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちGiant Triplex Ceramic Plunger Pumpデバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。