AmanaメーカーVR8205の使用説明書/サービス説明書
ページ先へ移動 of 29
RECOGNIZE THIS SYMBOL AS A SAFETY PRECAUTION. A TTENTION INST ALLING PERSONNEL As a professional installer you have an obligation to know the product better than the customer. This includes all safety precautions and related items. Prior to actual installation, thoroughly familiarize yourself with this Instruction Manual.
2 WARNING If the information in these instructions is not followed exactly, a fire or explosion may result causing property damage, personal injury or loss of life. – Do not store or use gasoline or other flammable vapors and liquids in the vicinity of this or any other appliance.
3 and masonry acid washing materials. If the furnace is installed near an area which will be frequently con- taminated by these substances, the furnace should be sealed from this area so that little contaminated air can reach the furnace.
4 • When installed in a residential garage, the furnace must be positioned so the burners and ignition source are located not less than 18 inches (457 mm) above the floor and protected from physical damage by vehicles.
5 (c) In addition to air needed for combustion, process air shall be provided as required for: cooling of equipment or material, controlling dew point, heating, drying, oxidation or dilution, safety exhaust, odor control, and air for compres- sors.
6 Figure 3 Equipment Located in Confined Spaces; All Air from Outdoors Through Ventilated Attic. See 5.3.3-b. 3. When communicating with the outdoors through hori- zontal ducts, each opening shall have a minimum free area of 1 square inch per 2,000 BTU per hour of total input rating of all equipment in the enclosure.
7 The minimum vent diameter for the Category I venting system is as shown below: MINI M UM V ENT DI A METER MO DEL G UI* GCI* 45 3 Inch 4 Inch 70 4 Inch 4 Inch 90 4 Inch 4 Inch 115 5 Inch 5 Inch 140 5 Inch 5 Inch Under some conditions, larger vents than those shown above may be required or allowed.
8 Figure 7 Blower Assembly 3. Remove and save the four screws which hold the rotation plate on the partition panel. Note that one of the screws which hold the induced draft blower on the rotation plate needs to be removed. 4. Turn the rotation plate 90 degrees counterclockwise.
9 CHECKLIST SUMMARY This checklist serves as a summary of the items to be checked before venting an Air Command 80 furnace into a masonry chimney. In addition, we recommend that a quali- fied serviceman use this checklist to perform a yearly inspection of the furnace venting system.
10 Wall or Parapet Ch imney NOTE : No Hei g ht abov e pa rap et re qu ire d w h en di s tan ce fr om wall s or par a pet is more than 10 fe et. More than 10 ' 3' Min . Rid g e 3' Min . Chimney 2' Min . More than 10 ' 10" Hei g ht ab ove an y roof surface within 10 f e et ho riz on ta lly .
11 Use a flashlight and small mirror at the cleanout or vent connector to inspect the clay tile liner. If any of the following problems are present: • Tile sections misaligned • Tile sections miss.
12 A B-vent installed as described in this section is considered to be an enclosed vent system, and the sizing tables in National Fuel Gas Code, NFPA 54/ANSI Z223.1 - latest edition and in the National Standard of Canada, CAN/CGA B149.1 and CAN/CGA B149.
13 NATURAL GAS CONNECTION Refer to Figure 11 for the general layout at the furnace. The following rules apply: 1. Use black iron or steel pipe and fittings for the building piping. 2. Use pipe joint compound on male threads only. Pipe joint compound must be resistant to the action of the fuel used.
14 When the gas piping enters through the left side of the furnace, the installer must supply the following fittings (starting from the gas valve): • Straight pipe to reach the exterior of the furnace (Fig- ures 14 & 15). • A ground joint union, drip leg, and manual shutoff valve must also be supplied by the installer.
15 CHECKING GAS PIPING CAUTION To prevent personal injury or property damage due to fire, the following instructions must be performed regarding gas connections, pressure testing, location of shutoff valve and installation of gas piping. Before placing in operation, leak test the unit and gas connections.
16 Si z i ng B et ween S i ngl e or S ec ond S t a ge Regulat or and A ppl i anc e* Max im um P ropane Capac i t i es Li s t ed are B as ed on 1/ 2" W . C. pres s ure drop at 11" W . C. s et t ing. Capac i t ies i n 1, 000 B TU/hour. Pipe or N omina l Pi pe S iz e Tubing Tubing Siz e , O.
17 WARNING To prevent death or personal injury due to electric shock, disconnect electrical power. 1. Remove both doors from the furnace. 2. Remove and save the screws holding the junction box to the left side of the furnace. 3. Disconnect the hose from the pressure switch.
18 HEAT ANTICIPATOR SETTING Adjust the heat anticipator in the room to obtain the proper number of heating cycles per hour. The heat anticipator is a wire-wound adjustable heater that prevents the room temperature from “overshooting” the room thermostat set- ting.
19 Min i mu m R e c o mme n d e d F i l t e r S i z e s Q ty . - N om i nal Si ze, I nc hes ( Sq. I n. Sur f ac e Ar ea) Si ze_Ai r Flow Di sposable Per m anen t 045_30 1 - 20 X 25 ( 500) 1 - 15 X 20 .
20 Secon ds 0 45 On Off On Off On Off Indoo r Fan Outdoor Fan And Comp res s or Ther mos tat T iming Chart for Normal Cooling Operation Integrated Ignition Control Diagnostic Signal Chart Heating T im.
21 9. After a 15 second delay while flue products are purged from the furnace heat exchanger, the induced draft blower motor is de-energized. 10. The air circulation blower has an adjustable delay-off timing of 60, 90, 120 or 180 seconds (starting from the time the gas valve closes).
22 Figure 33 Rollout Switch Relocation (Upflow) Figure 34 Rollout Switch Relocation (Counterflow) ROLLOUT PROTECTION DEVICE If the flames from the burners are not properly drawn into the heat exchanger, a protection device will open causing the gas valve to close.
23 BURNER BOX This furnace must use indoor air for combustion. It is not a direct vent furnace, and it cannot be installed as a direct vent furnace. The burner box (on some models) is present only to reduce the burner sound transmission.
24 5. Open Limit Control (Primary or Auxiliary) An open limit control can be caused by a low condi- tioned air flow due to dirty filter or resistance in duct work, a faulty blower, a blower speed set too low, or a faulty limit. When the limit control opens, the induced draft and air circulation blowers are turned on.
25 O F F ON M P C 1 3 2 WR INLET OUTLET Main Regulator Adjust Inlet Pressu re Tap (Side of Valve) Outlet Pr essure Tap (Side of Valve) Main Soleno id Redund ant Soleno id ON/Off Switch Figure 39 White.
26 3. INPUT = GAS HTG VALUE x 3600 SEC. PER CUBIC FOOT (3600 is a conversion factor- 3600 seconds = 1 hour.) Example: Natural gas with a heating value of 1000 BTU per cubic foot and 34 seconds per cub.
27 XI. Maintenance WARNING To prevent death or personal injury due to electric shock, disconnect electrical power before performing any maintenance. IMPORTANT NOTE: Handle the ignitor with care. Touch- ing the ignitor body with bare fingers, rough handling, or vibration could result in early ignitor failure.
28 The furnace-mounted filter rack includes a rack mounted on the top of the furnace. Two filters fit into the rack and rest against the sides of the return air plenum, forming a “V” above the furnace. The filters should be inspected frequently and cleaned or replaced when necessary.
29 BURNERS WARNING To prevent personal injury or death, do not remove any internal compartment covers or attempt any adjustment. Electrical components are contained in both compartments. Contact a qualified service agent at once if an abnormal flame appearance should develop.
デバイスAmana VR8205の購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
Amana VR8205をまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはAmana VR8205の技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。Amana VR8205の取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。Amana VR8205で得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
Amana VR8205を既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はAmana VR8205の不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、Amana VR8205に関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちAmana VR8205デバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。