Honeywellメーカー53034の使用説明書/サービス説明書
ページ先へ移動 of 54
ONYX®F IRST V ISION ™ Installation and Operation Manual Document 53034 10/29/07 Rev: A2 P/N: 53034:A2 ECN: 07-706.
2 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07 Fire Alarm System Limit ations While a fire alarm system m ay lower insurance rates, it is not a substitute f or fi.
3 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07 Inst allation Precautions Adherence to the following will aid in proble m- free installation with long-term reliability: W ARNING - Several diffe rent sour ces of power can be connected to the fire alarm cont rol panel.
4 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07 Document ation Feedback Y our feedback helps us keep our documentation up-to-dat e and accurate.
1 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07 T able of Content s Section 1 Introduction ............................................... .......................................................... ..... 3 1.1: F IRST V ISION Specifications .
Table of Contents 2 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07 Figure 3.8 Date and Time Properties .................. ...................... ....................... ...................... ....... ........21 Figure 3.
3 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07 Section 1 Introduction The contents of this manual are impo rtant and m ust be kept in close proximity to the hardware.
Introduction F IRST V ISION Specifications 4 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07 T able 1.2 F IRST V ISION LCD Specificat ions Part Number FIRSTVISION-LC.
F IRST V ISION De scriptions Introduction 5 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07 1.2 F IRST V IS ION Descriptions 1.2.1 Product Overview F IRST V ISION uses a graphical user interface (GUI) ap proach to life safety monitoring for your building.
Introduction F IRST V ISION Descriptions 6 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07 Compatibility F IRST V ISION is compatible with the node types li sted in the following table. Relative information abo ut existing nodes (its dev ice ID and custom labe l) can be imported into t he Configuration T ool.
F IRST V ISION De scriptions Introduction 7 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07 1.2.2 Networking The following figure illust rates a possible NOTI•FIRE•NET™ network that includes F IRST V ISION . Refer to “Make Connections to F IRST V ISION ” on page 15 fo r more information.
Introduction Agency Approvals 8 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07 1.2.3 Ordering Information Please verify part numbers with your sales repr esentative before and when you are ordering.
Conventions Used in this Manual Introduction 9 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07 1.4 Conventions Used in this Manual 1.4.1 Notes, Cautions, and W arnings This manual contains notes, cautions, and warnings to alert the reader as follows: 1.
Introduction Related Manuals 10 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07 •O N Y X ® F IRST V ISION ™ Cabinet Installa tion Instructions PID - 53105 • AMPS-24/E Power Supply Manual - 51907 • NOTI•FIRE•NET™ Manual (V ersion 4.
11 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07 Section 2 F IRST V ISION Inst allation Instructions 2.1 Power Sources and Output s Overview • Complete all mounting procedures and ch eck all wiring before applying power .
F IRST V ISION Installation Instruction s Enclosure Installation 12 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07 2.2 Enclosure Inst allation Refer to “LCD Installation” on page 14 if the enclosure is already installed.
Enclosure In stallation F IRST V ISION Installation Instruct ions 13 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07 Step 4.
F IRST V ISION Installation Instruction s LCD Installation 14 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07 Figure 2. 2 F IRST V ISION Power Wiring Diagram 2.3 LCD Inst allation Step 1. Install the F IRST V ISION LCD onto the enclosure’ s factory installed hinges (LCD hinges on the left).
15 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07 Section 3 Enabling F IRST V ISION to Monitor Y our Building 3.1 Process Overview The procedures documented in th e.
Enabling F IRST V ISION to Monitor Your Building Make Connections to F IRST V ISION 16 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07 .
Make Connections to F IRST V ISION Enabling F IRST V ISION to Monitor Your Building 17 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07 Figure 3.4 Example NFN Gateway Embedded System Con nections F IRST V ISION FACP FACP NFN Network (v5.
Enabling F IRST V ISION to Monitor Your Building Make Connections to F IRST V ISION 18 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07 Figure 3.5 Example NFN Ga teway PC System Connections F IRST V ISION FACP FACP NFN Network (v5.
Turn on Power to F IRST V ISION Enabling F IRST V ISION to Monitor Your Building 19 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07 3.3 T urn on Power to F IRST V ISION T urn-on the pow er supply connected to F IRST V ISION .
Enabling F IRST V ISION to Monitor Your Building Turn on Power to F IRST V ISION 20 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07 Screen Saver F IRST V ISION supports W indows Screen Saver settings that extend the display’ s life and prevent screen image burn in.
Set the F IRST V ISION Clock and Time Zone Enabling F IRST V ISION to Monitor Your Building 21 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07 3.4 Set the F IRST V ISION Clock and T ime Zone The F IRST V ISION system clock is set at the factory , ba sed on the factory time zone.
Enabling F IRST V ISION to Monitor Your Building Establish Communication Between Your LAN and F IRST V ISION 22 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07 3.5 Est ablish Communication Between Y our LAN and F IRST V ISION The following steps are performed using Windows operations on F IRST V ISIO N .
Establish Gateway Communication Enabling F IRST V ISION to Monitor Your Building 23 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07 Step 6. Select the “Use the following IP address” radio button. The “Obtain an IP address automatically” can NOT be used.
Enabling F IRST V ISION to Monitor Your Building Establish Gateway Communication 24 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07 It is anticipated that the factor.
Copy Your Exported Building Design to F IRST V ISION Enabling F IRST V ISION to Monitor Your Building 25 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07 3.7 Copy Y our Exported Building Design to F IRST V ISION This copying task can be accomplished using various methods.
Enabling F IRST V ISION to Monitor Your Building Display Your Building Design on F IRST V ISION 26 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07 3.8 Display Y our Building Design on F IRST V ISION Step 1. Locate the F IRST V ISION icon displayed on the Desktop.
Test Your Building Design on F IRST V ISION Enabling F IRST V ISION to Monitor Your Building 27 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07 3.
Enabling F IRST V ISION to Monitor Your Building Touch Screen Calibration 28 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07.
29 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07 Section 4 Operating Basics of F IRST V ISION Experiment with F IRST V ISION to gain a basic familiarity with its operation . This helps you ensure F IRST V ISION is set up and co nfigured correctly .
Operating Basics of F IRST V ISION Normal Operation (No Events Being Reported) 30 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07 Figure 4. 1 F IRST V ISION Display Example: No Alarms W ith the front door open ; touching a floor number button displays the corresponding floor in the building layout.
Normal Operation (No Events Being Reported) Operating Basics of F IRST V ISION 31 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07 W ith the front door open ; touching one of the miscellaneous buttons will displ ay an information window or site plan.
Operating Basics of F IRST V ISION Normal Operation (No Events Being Reported) 32 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07 W ith the front door open; touchi ng a place on the floor will open a window that displays an enlarged or zoomed view.
Normal Operation (No Events Being Reported) Operating Basics of F IRST V ISION 33 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07 W ith the front door open ; touching inside the Zoomed Floor Plan window near th e left side, right side, top, or bottom changes the point of reference of the zoomed area.
Operating Basics of F IRST V ISION Investigating Gate way Disconnection 34 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07 W ith the front door open ; touching an icon will display info rmation about the image. Figure 4.
Operation When a Fi re Alarm i s Received Operating Basics of F IRST V ISION 35 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07 4.
Operating Basics of F IRST V ISION Operation When a Fire Alarm is Rece ived 36 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07 W ith the fron t door open; t ouching the display near the device i cons being displayed w ill zoom to the area.
Operation After a Fire Alarm Has Been Cleared Operating Basics of F IRST V ISION 37 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07 W ith the front doo r open; touching the Event List butt on will display a listing o f the current alarms.
Operating Basics of F IRST V ISION Accessing t he Log File 38 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07 4.5 Accessing the Log File F IRST V ISION maintains a log of the most recent 1,000 events from att ached devices.
39 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07 Section 5 The Development of F IRST V ISION 5.1 The Current Situation for a Firefighter When Firefighters arrive on the scene of a building fire emergency , they must gather inform ation to accurately assess the situation and pl an their attack on the fire.
The Development of F IRST V ISION Expected Firefighter In teraction with the F IRST V ISION 40 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07 5.3 Expected Firefighter Interaction with the F IRST V ISION F IRST V ISION supports tasks that hel p Firefighters determine wh ether a fire is occurrin g.
Expected Firefighter In teraction with the F IRST V ISIO N The Development of F IRST V ISION 41 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07 10 seconds 4. Af ter verif ying the building and seeing fire location, the C ommander radios firefighting team.
The Development of F IRST V ISION Expected Firefighter In teraction with the F IRST V ISION 42 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07 20 seconds 5.
Expected Firefighter In teraction with the F IRST V ISIO N The Development of F IRST V ISION 43 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07 Fire Scene 2 In this scenario, the fire is near the front of the building and the main entrance drive, so trucks can be positioned easily .
The Development of F IRST V ISION Expected Firefighter In teraction with the F IRST V ISION 44 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07 If hazardous materials.
Expected Firefighter In teraction with the F IRST V ISIO N The Development of F IRST V ISION 45 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07 If the mate rials wer.
The Development of F IRST V ISION Expected Firefighter In teraction with the F IRST V ISION 46 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07.
1 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07 Index B Building Design Copy to Terminal 25 C Commissioning 39 Computer Specifications 3 , 4 D Display Properties p.
Index 2 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07.
3 F IRST V ISION ™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07 Limited W arranty Honeywell International Inc. warrants products manufa ctured by it to be free from defects in materials and workmanship for eighteen (18) months from the date of manufacture, under normal use and service.
Wor ld Headquarters 12 Clintonville Road Northford, CT 06472-1 610 USA 203-484-7161 fax 203-484-71 18 www .notifier . com.
デバイスHoneywell 53034の購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
Honeywell 53034をまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはHoneywell 53034の技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。Honeywell 53034の取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。Honeywell 53034で得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
Honeywell 53034を既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はHoneywell 53034の不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、Honeywell 53034に関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちHoneywell 53034デバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。