Liebertメーカー110Vの使用説明書/サービス説明書
ページ先へ移動 of 31
(07/04) N N e e t t w w o o r r k k P P o o w w e e r r S S w w i i t t c c h h S S i i n n g g l l e e P P o o l l e e 1 1 1 1 0 0 V V U U s s e e r r M M a a n n u u a a l l HOT SWAP Net w o rk P ow.
(07/04) Dear Customer, Please accept our thanks for givi ng us the privilege to serve y ou by choosing a Liebert make product. If this is your first Liebert product, we hope it is the beginning of a long relationship which delivers value to your organisation.
USER MANU AL N N e e t t w w o o r r k k P P o o w w e e r r S S w w i i t t c c h h Page i ENGLISH This manual desc ribes install ation and operation procedures for the N N e e t t w w o o r r k k P P o o w w e e r r S S w w i i t t c c h h. All relevant parts of the m anual should be read pri or to com mencing inst allation.
.
USER MANU AL N N e e t t w w o o r r k k P P o o w w e e r r S S w w i i t t c c h h Page i REGISTERED HEAD OFFICE EMERSON NETWORK POWER (India) Pvt. Ltd.
USER MANUAL N N e e t t w w o o r r k k P P o o w w e e r r S S w w i i t t c c h h Page ii Branch Offices: BARODA 39 / 2, Arunodaya Society, Alkapuri, BARODA-390 005 Tel : 0265-314296, 330383 Fax: 0265-314296, 330383 JAMSHED PUR Kashi kunj, Road no. 2, Gr.
USER MANU AL N N e e t t w w o o r r k k P P o o w w e e r r S S w w i i t t c c h h Page iii Safety Precautions WARNING Personnel operating on any apparatus referred i n this manual must k now extensively t he product. The Network Power Swi tch must be commissioned and serviced by an engineer approved by the manuf acturer (or his agent).
USER MANUAL N N e e t t w w o o r r k k P P o o w w e e r r S S w w i i t t c c h h Page iv Table of Contents 1 Chapter 1 – General descri ption ............ ........... ............. .............. ........... .............. ........... .......... .
USER MANU AL N N e e t t w w o o r r k k P P o o w w e e r r S S w w i i t t c c h h Page v This manual describes th e following equipment: EQUIPMENT PART NUMBER 3kVA, 110V, 25A, 1 Pole Networ k Power.
.
User Manual Chapter 1 - General Descr iption N N e e t t w w o o r r k k P P o o w w e e r r S S w w i i t t c c h h Page 1-1 1 Chapter 1 – General description 1.
Chapter 1 - General Descr iption User Manual N N e e t t w w o o r r k k P P o o w w e e r r S S w w i i t t c c h h Page 1-2 1.2 Design Concept Fig 1.2 - Power Circuit Diagram for Network Power Switch Figure 1.2 shows the Power circuit diagram for Network Power Switch.
User Manual Chapter 1 - General Descr iption N N e e t t w w o o r r k k P P o o w w e e r r S S w w i i t t c c h h Page 1-3 1.3 Mechanical Design Description Fig 1.3 – Hot swappable and Fixe d Unit The Network Power Switch consists of two module s.
Chapter 1 - General Descr iption User Manual N N e e t t w w o o r r k k P P o o w w e e r r S S w w i i t t c c h h Page 1-4 1.4 Mimic Indications Fig 1.4 – Mimic and LED Indications LED INDICATION Mimic indi cations: Ten LEDs are mounted on the mim ic plate; Glowing LED’s i ndicate the status of the Network Power Switch.
User Manual Chapter 1 - General Descr iption N N e e t t w w o o r r k k P P o o w w e e r r S S w w i i t t c c h h Page 1-5 1.5 Manual Bypass Switch Operation Fig 1.
Chapter 1 - General Descr iption User Manual N N e e t t w w o o r r k k P P o o w w e e r r S S w w i i t t c c h h Page 1-6 1.6 Potential free contacts The Network Power Swi tch status can be checked with the 37-pin D-type connector, l ocated on the rear e nd.
User Manual Chap ter 2 – Operatin g Instruc tions N N e e t t w w o o r r k k P P o o w w e e r r S S w w i i t t c c h h Page 2-1 2 Chapter 2 – Operating Instructions 2.
Chapter 2 – Operating Instructions User Manual N N e e t t w w o o r r k k P P o o w w e e r r S S w w i i t t c c h h Page 2-2 2.4 Switching the Load to Manual Bypass condition Fig 2.2 – Switching to Bypass WARNING This operation should be performed by Trained personnel only.
User Manual Chapter 3 – Installation Procedure N N e e t t w w o o r r k k P P o o w w e e r r S S w w i i t t c c h h Page 3-1 3 Chapter 3 – Installation Pr ocedure 3.1 Introduction WARNING Do not apply electri cal power to the Ne twork Power Switch equipment before t he arrival of the commissioning engineer.
Chapter 3 – Installation Procedure User Manual N N e e t t w w o o r r k k P P o o w w e e r r S S w w i i t t c c h h Page 3-2 3.3 Connecting cables to Network Power Sw itch WARNING BEFORE CABLING-.
User Manual Chapter 3 – Installation Procedure N N e e t t w w o o r r k k P P o o w w e e r r S S w w i i t t c c h h Page 3-3 3.3.3 Cable connections Following are t he set of external power c abl.
Chapter 3 – Installation Procedure User Manual N N e e t t w w o o r r k k P P o o w w e e r r S S w w i i t t c c h h Page 3-4.
User Manual Chapter 3 – Installation Procedure N N e e t t w w o o r r k k P P o o w w e e r r S S w w i i t t c c h h Page 4-1 4 Chapter 4 - Specifications 4.
Chapter 3 – Installation Procedure User Manual N N e e t t w w o o r r k k P P o o w w e e r r S S w w i i t t c c h h Page 4-2 4.3 Mechanical specifications MECHANICAL CHARACTERISTICS UNITS DESCRIPTION Height mm 88.0 Widt h mm 431.0 Depth mm 457.0 Weight kg 8.
User Manual Chapter 3 – Installation Procedure N N e e t t w w o o r r k k P P o o w w e e r r S S w w i i t t c c h h Page 4-3.
.
User Manual Chapter 5 – Installation Drawing N N e e t t w w o o r r k k P P o o w w e e r r S S w w i i t t c c h h (02/04) Page 5-1 5 Installation Drawings 5.
Chapter 5 – Installation Drawing User Manual N N e e t t w w o o r r k k P P o o w w e e r r S S w w i i t t c c h h Page 5-2 (02/04) 5.1.1 Power Circuit Diagram.
Chapter 4 – User Manual N N e e t t w w o o r r k k P P o o w w e e r r S S w w i i t t c c h h (02/04) Page 5-3 5.1.2 External Power c able connections O /p Line In p u t Fu s e 1 In p u t Fu s e 2.
Chapter 5 – Installation Drawing User Manual N N e e t t w w o o r r k k P P o o w w e e r r S S w w i i t t c c h h Page 5-4 (02/04) 5.1.3 Overall general arrangement HOT SWAP HOT SWAP 457 mm 431 m.
Chapter 4 – User Manual N N e e t t w w o o r r k k P P o o w w e e r r S S w w i i t t c c h h (02/04) Page 5-5.
デバイスLiebert 110Vの購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
Liebert 110Vをまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはLiebert 110Vの技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。Liebert 110Vの取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。Liebert 110Vで得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
Liebert 110Vを既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はLiebert 110Vの不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、Liebert 110Vに関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちLiebert 110Vデバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。