Life FitnessメーカーSM81の使用説明書/サービス説明書
ページ先へ移動 of 23
M051-K50-B117 1 8 STA CK MULTI-JUNGLE (SM81) WITH 2 A DJUSTA BLE PULLEYS UNPA CKING A ND A SSEMBLY INSTRUCTIONS.
SM81 U npacking & Assembly Instructions 2 The SM81 c om es partially assem bled. Follow the steps below to com plete the as sem bly. WA RNING: COMPONENTS O F THE SM81 ARE LARGE AND HEAVY.
SM 81 Unpacking & Assembly Instr uctions 3 UNPA CKING Follow the steps below when unpacking the c om ponents of the SM81. 1. Cut off the shipping wrapper. 2. Remove th e parts boxes an d shippin g boards. 3. Remove the item s in the parts box es. Thes e item s are s hown in Figure 1.
SM81 U npacking & Assembly Instructions 4 A SSEMBLY Figure 2 shows an ass em bled SM81. Figure 2. SM81 main components (seats and cables remov ed for clarity). 1. Cubes (2) 2. Low row bench (2) 3. Lat bench ( 2) 4. Connecting beam (1) 5. Lat tops (2) 6.
SM 81 Unpacking & Assembly Instr uctions 5 Figure 3. Set t he w eight stack cu bes. 2. Bolt on the teardrop pulleys above the benches (see F igure 4) on both cubes using two 3/8” x 2-3/4” hex head bolts (used to bolt the cr oss beam to the cr oss m em bers and the adjustable pulley tops to the top beams ).
SM81 U npacking & Assembly Instructions 6 Figure 4. Bolt on the te ardrop pulleys. Figure 5. Configura tion for 2-3/4” and 3” bolts. 3. Using a 5/8” soc ket with extens ion and com bination .
SM 81 Unpacking & Assembly Instr uctions 7 4. Using a 5/8” soc ket and c om bination wrench, m ount the 56” lat tops (par t T f rom HARDWARE sec tion) to the cells by inserting two of the large 7/16” by 6” bolts using the hardware configur ation shown in Figure 7.
SM81 U npacking & Assembly Instructions 8 Figure 8. Mount rubber bumpers and the w eight stacks. 5. Install the weight stack s. T o do this: A. Using a 9/16” soc ket and c om bination wrench, rem ove the tric ep back rest bolts (see Figure 9) . B.
SM 81 Unpacking & Assembly Instr uctions 9 C. Prepare the w eight stack. Slide the guide rods ( 2) through the weight stack s (1) as shown below. Place rubber bum pers (3) on the bottom s of each guide rod. Make s ure the pull pin (4) is in the bottom weight plate.
SM81 U npacking & Assembly Instructions 10 rest m ounted to the f ram e as shown in Figure 9) . You will need to remove the pulley from the housing to thr ead the plug into the weight stack bayonet. Make sure the 9/16” jam nut is thr eaded 1-5/8” away from the pulley as shown in Figure 11.
SM 81 Unpacking & Assembly Instr uctions 11 Use a pi nch bar to a lign the seat fram e hole s to the cubes Figure 13. Mount the benche s to the frame.
SM81 U npacking & Assembly Instructions 12 INSTA LLING THE CABLES The SM81 us es eight cables. T here ar e three diff erent types of cable used on the SM81. T hey are: 1. Adjustable c ross over cables (ball end cables) (2). 2. Low row cable (the long cables) (2).
SM 81 Unpacking & Assembly Instr uctions 13 ADJUSTABLE CROSSOVER CABLE RO UTI NG Once you’ve removed the pulleys as desc ribed previously, route the three adjustable cross over cables as shown in Figure 16. Figure 16. Adjustable crossov er cable routin g.
SM81 U npacking & Assembly Instructions 14 Figure 17. Adjustable crossover cab le end detail. Using a 7/8” wrench, tighten the j am nut onto the adjustable pulley threads as shown in Figure 17. Place a rubber c ap on the top of the cable as shown in Figure 17 (right) .
SM 81 Unpacking & Assembly Instr uctions 15 Bolt the cable to the weight stack s as s hown in Figure 19. Thr ead the 7/8” nut up on the cable bolt as shown at lef t. Screw the bolt down into the weight stack as shown at right. Tighten the bolt with a 7/8” com bination wrench.
SM81 U npacking & Assembly Instructions 16 TRICEP PUSHDOW N CABLE RO UTI NG Route the tricep pushdown cable as shown in Figure 21. Screw the cable into the weight stac k as shown previously in Figure 19. Figure 21. Tricep pus hdow n cable routing.
SM 81 Unpacking & Assembly Instr uctions 17 HA RDWARE 0123456 ½½½½½½ Hardware F igure 1. Assembly Parts..
SM81 U npacking & Assembly Instructions 18 The parts shown in Hardware Figure 1 are us ed to assem ble the SM81. T hey are: A. 7/16” x 6” hex head bolt (used to bolt the tric ep top beam , adjustable c rossover top beam, lat top beam s , and connecting beam to the tops of the cubes ) B.
SM 81 Unpacking & Assembly Instr uctions 19 The part s hown in Hardware Figure 3 is the 9/16” c able jam nut that’s used to s ecure the cables to the weight stack s. Hardware Figure 3. Cable ja m nut. M. Cable jam nut Hardware Figure 4 shows the types of cables that ar e included with the SM81.
SM81 U npacking & Assembly Instructions 20 S T U Hardware F igure 5. T op assemblies. S. Teardr op pulleys (bolt on above lat and seated row benches) (4 ) T.
SM 81 Unpacking & Assembly Instr uctions 21 Hardware Figure 6. Weight stack rubber bumpers. W . W eight s tack rubber bum pers (inserted under weight stac ks ) (16) Hardware Figure 7.
SM81 U npacking & Assembly Instructions 22 PA RTS LIST Part # ID Description Quantity Main components 1 2 3 4 5 6 7 8 Cubes Low row bench Lat bench Connecting beam Lat tops Tr icep top 300 lb weig.
SM 81 Unpacking & Assembly Instr uctions 23 0017-00101-1413 0017-00104-0368 0017-00103-0217 Pulley hardw are (installed) 1-3/4” Bolt Cap washer 3/8” Nyloc nut 0017-00101-1413 0017-00104-0313 0.
デバイスLife Fitness SM81の購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
Life Fitness SM81をまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはLife Fitness SM81の技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。Life Fitness SM81の取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。Life Fitness SM81で得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
Life Fitness SM81を既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はLife Fitness SM81の不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、Life Fitness SM81に関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちLife Fitness SM81デバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。