LinearメーカーSLDの使用説明書/サービス説明書
ページ先へ移動 of 36
SLR - SLC - SLD Slide Gate Oper ator Installation Guide PRINTER’S INSTRUCTIONS: INSTR,INSTL,SLR SLC SLD - LINEAR P/N: 227968 X11 - INK: BLA CK - MA TERIAL: 20 LB.
SLR • SLC • SLD Slide Gate Operator Installation Guide - 2 - 227968 Revision X13 2-3-09 T able of Contents Pre-installation Information .................................. 1 B e f o r e Y o u B e g i n . . . ...................................... 1 Alwa ys Check the Gate’ s Action .
SLR • SLC • SLD Slide Gate Operator Installation Guide - 1 - 227968 Revision X13 2-3-09 Pre-installation Information Before Y ou Begin... Bef ore unpacking, inspect the car ton for exterior damage. If you find damage, advise the deliv er y carrier of a potential claim.
SLR • SLC • SLD Slide Gate Operator Installation Guide - 2 - 227968 Revision X13 2-3-09 Wiring Specifications Ref er to the f ollowing steps f or details on pow er and accessor y wiring for the operator . AC P ower Wiring 1. Find the listing on this page corresponding to the model, voltage and horsepower r ating of your operator .
SLR • SLC • SLD Slide Gate Operator Installation Guide - 3 - 227968 Revision X13 2-3-09 Mounting P ad Installation The gate operator mounts bolted to a custom poured concrete mounting pad. The pad suppor ts the operator and pre vents it from mo ving dur ing operation.
SLR • SLC • SLD Slide Gate Operator Installation Guide - 4 - 227968 Revision X13 2-3-09 Gate Brack et and Chain Assembly ✓ NO TE: The item numbers shown in these illustrations are f or reference only . F or the actual par t numbers, ref er to the par ts lists in the rear of this manual.
SLR • SLC • SLD Slide Gate Operator Installation Guide - 5 - 227968 Revision X13 2-3-09 Operator Prepar ation Vent Plug Installation In order to k eep gear oil from spilling out dur ing shipping, gear reducers used in this gate operator has either a solid plug, or a sealed v ent plug, installed at the factory .
SLR • SLC • SLD Slide Gate Operator Installation Guide - 6 - 227968 Revision X13 2-3-09 Operator Setup (Continued) Limit Nuts Rough Adjustment The limit nuts are not preset at the f actor y and m ust be adjusted f or the length of the gate in each installation.
SLR • SLC • SLD Slide Gate Operator Installation Guide - 7 - 227968 Revision X13 2-3-09 Controller Features SHADOW/RESET PROGRAMMING BUTTONS POWE R INDICATORS DISPLAY WHIP ANTENNA OPERATION BUTTON.
SLR • SLC • SLD Slide Gate Operator Installation Guide - 8 - 227968 Revision X13 2-3-09 Indicator Descriptions INDICA TOR DEFINITION INDICA TION WHEN LIT DURING NORMAL OPERA TION INDICA TION WHEN .
SLR • SLC • SLD Slide Gate Operator Installation Guide - 9 - 227968 Revision X13 2-3-09 T erminal Descriptions TERMINAL GROUP FUNCTION A C N 24 V OL T INPUT F ACT OR Y CONNECTED T O 24 V AC FR OM TRANSFORMER OR 24 VDC FROM CONTINUOUS DUTY DC SUPPL Y .
SLR • SLC • SLD Slide Gate Operator Installation Guide - 10 - 227968 Revision X13 2-3-09 Operator Accessor y Connections 3-BUTTON ST ATIO N KEYSWITC H FIRE ACCESS SWITCH SINGLE-CHAN NEL RADIO RECE.
SLR • SLC • SLD Slide Gate Operator Installation Guide - 11 - 227968 Revision X13 2-3-09 Basic Controller Programming Progr amming Overview The Controller can be programmed with v ar ious options for the operator . The programming fields are defined as “functions” that hav e “options”.
SLR • SLC • SLD Slide Gate Operator Installation Guide - 12 - 227968 Revision X13 2-3-09 Basic Controller Programming (Cont.) Run Alarm and Pre-start Alarm The f actor y def ault is Run Alarm on and a 3-second Pre-start Alar m. The operator’ s beeper will sound 3 seconds before the operator star ts.
SLR • SLC • SLD Slide Gate Operator Installation Guide - 13 - 227968 Revision X13 2-3-09 Advanced Controller Progr amming Entering Advanced Progr amming Mode T o access and program the Advanced Programming functions, for each programming session, Adv anced Programming m ust be enabled.
SLR • SLC • SLD Slide Gate Operator Installation Guide - 14 - 227968 Revision X13 2-3-09 Advanced Controller Progr amming (Cont.) Auxiliary Relay Mode The A uxiliar y Rela y has nor mally open and nor mally closed contacts. The f actor y setting disables the A uxiliar y Relay .
SLR • SLC • SLD Slide Gate Operator Installation Guide - 15 - 227968 Revision X13 2-3-09 Advanced Controller Progr amming (Cont.) Soft Start/Stop Duration This function is only used with DC slide gate Model SLD .
SLR • SLC • SLD Slide Gate Operator Installation Guide - 16 - 227968 Revision X13 2-3-09 Advanced Controller Progr amming (Cont.) Radio Enable The Controller contains a built-in MegaCode ® radio receiv er to allow activation from up to 40 access control transmitters and two Model MGT (gate edge) transmitters .
SLR • SLC • SLD Slide Gate Operator Installation Guide - 17 - 227968 Revision X13 2-3-09 Loop Lay out Illustration SEPARATE PEDESTRIAN GATE REQUIRED 7 FEET MINIMUM DISTANCE FROM GATE 2" 3/8&q.
SLR • SLC • SLD Slide Gate Operator Installation Guide - 18 - 227968 Revision X13 2-3-09 Safety Edge Lay out Illustration #1 NOTES: 1. WIRE THESE ED GES FOR CLOSE OBSTRUCTION 2. WIRE THESE EDGES FOR OPEN OBST RUCTION 3. ON LEADING ED GE, WIRE FOR CLOSING OBSTRUCT IO N OR REVERSING IF DESIRED 4.
SLR • SLC • SLD Slide Gate Operator Installation Guide - 19 - 227968 Revision X13 2-3-09 Safety Edge Lay out Illustration #2 NOTES: 1. WIRE THESE EDGES FOR CLOSE OBSTRU CTIO N 2. WIRE THESE EDGES FOR OP EN OBSTRUCTION 3. ON LEADING EDGE, WIRE FOR CLOSING OBSTRUCTION OR REVERS ING IF DESIRED 4.
SLR • SLC • SLD Slide Gate Operator Installation Guide - 20 - 227968 Revision X13 2-3-09 Photoey e Installation Illustration CARE MUST BE TAKEN IN THE PLACEMENT OF PHOTOEYES TO MINIMIZE N UISANCE .
SLR • SLC • SLD Slide Gate Operator Installation Guide - 21 - 227968 Revision X13 2-3-09 Picket Gate Installation CARD READER ON STAND PICKETS SPACE SMALLER THAN 2 1/4" MESH WITH OPEN INGS SMALLER THAN 2 1/4" TO A MINIMUM HEIGHT OF 48" ABOVE G ROUND OVER ENTIRE GATE LENGTH SEPARATE PEDES TRIAN GATE REQUIRED 7 FT.
SLR • SLC • SLD Slide Gate Operator Installation Guide - 22 - 227968 Revision X13 2-3-09 T rack Gate Installation OVERHEAD TRACK GATE WITH ADDED C-CHANNEL FOR GATE BRACKET ATTACHMEN T OVERHEAD TRA.
SLR • SLC • SLD Slide Gate Operator Installation Guide - 23 - 227968 Revision X13 2-3-09 Dual Gate Installations T wo ope rat ors can be used in dua l gate ins tall atio ns. T he oper ator s communicate with each other through the 3-wire COMM LINK terminals.
SLR • SLC • SLD Slide Gate Operator Installation Guide - 24 - 227968 Revision X13 2-3-09 Gate Operation Open Button Opens the gate. If the Controller is programmed to stop opening the gate at mid-trav el, a constant press of the OPEN button will override the Mid-tr av el Stop and completely open the gate.
SLR • SLC • SLD Slide Gate Operator Installation Guide - 25 - 227968 Revision X13 2-3-09 Error Indications During abnor mal operation, the Controller’ s displays and beeper will indicate the error condition that has occurred.
SLR • SLC • SLD Slide Gate Operator Installation Guide - 26 - 227968 Revision X13 2-3-09 T roubleshooting Contacting T echnical Support F or technical questions regarding Linear gate oper ators, contact the T echnical Ser vices Depar tment at: 1-800-421-1587 from 6:30 AM to 4:30 PM P acific time Operator fails to start A.
SLR • SLC • SLD Slide Gate Operator Installation Guide - 27 - 227968 Revision X13 2-3-09 Model SLR Exploded View 1 31 30 29 27 33 32 34 2A 2 3 28 A 24 26 22 25 36 39 15 13 23 4 21 35 20 12 11 10 9 8 16 14 18 19 17 7 7A 28 NOTE: MAY HAVE O PTIONAL TORQUE L IMITE R 1A 1B MODEL SLR MECHANICAL P ARTS LIST REF .
SLR • SLC • SLD Slide Gate Operator Installation Guide - 28 - 227968 Revision X13 2-3-09 Model SLC Exploded View 1 31 30 29 27 33 34 2A 2 3 24 26 22 25 36 15 13 23 4 21 35 20 12 11 10 9 8 16 14 18.
SLR • SLC • SLD Slide Gate Operator Installation Guide - 29 - 227968 Revision X13 2-3-09 MODEL SLC MECHANICAL P ARTS LIST REF . # P ART # DESCRIPTION 1 2300-907 Operator Cov er 1A 2510-354 Plunger.
SLR • SLC • SLD Slide Gate Operator Installation Guide - 30 - 227968 Revision X13 2-3-09 Model SLD Exploded View 1 31 30 29 27 33 32 34 2A 2 3 24 26 22 36 25 38 15 13 23 4 21 35 20 12 11 10 9 8 16.
SLR • SLC • SLD Slide Gate Operator Installation Guide - 31 - 227968 Revision X13 2-3-09 MODEL SLD MECHANICAL P ARTS LIST REF . # P ART # DESCRIPTION 1 2300-907 Operator Cov er 1A 2510-354 Plunger.
SLR • SLC • SLD Slide Gate Operator Installation Guide - 32 - 227968 Revision X13 2-3-09 Model SLD Maintenance Battery Maintenance The gel-cell batter ies in this operator require no routine maintenance. For assured continued perf or mance, they should be replaced ev er y year .
SLR • SLC • SLD Slide Gate Operator Installation Guide - 33 - 227968 Revision X13 2-3-09 Prev entative Maintenance General Linear gate operators are designed for many years of trouble-free operation and, under recommended operating conditions, will require only minimal maintenance.
SLR • SLC • SLD Slide Gate Operator Installation Guide - 34 - 227968 Revision X13 2-3-09 Gate Operator Installation Checklist ❑ ❑ 1. The gate has been chec ked to make sure it is le vel and mov es freely in both directions.
デバイスLinear SLDの購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
Linear SLDをまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはLinear SLDの技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。Linear SLDの取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。Linear SLDで得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
Linear SLDを既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はLinear SLDの不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、Linear SLDに関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちLinear SLDデバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。