PelcoメーカーC1459M-B (2/03)の使用説明書/サービス説明書
ページ先へ移動 of 4
SD5-P Metal Ceiling Panel C1459M-B (2/03) ® IMPORT ANT SAFEGUARDS AND W ARNINGS Prior to installation and use of this product, the following W ARNINGS should be observed. 1. Installation and servicing should be done only by qualified service personnel and conform to all local codes.
INST ALLA TION There are two methods of installation for the metal ceiling panel. Replacement Installation – Remove existing ceiling tile and install the SD5-P metal panel. Reinforcement Installation – Install the SD5-P to strengthen the existing ceiling tile.
REINFORCEMENT INST ALLA TION 1. Remove the ceiling tile from the ceiling. 2. Prepare the ceiling tile for installation. Use the metal panel as a template. Place the metal panel on top of the ceiling tile, and draw an outline of the center circle. Cut the circle out of the ceiling tile.
REVISION HISTORY Manual # Date Comments C1459M 3/97 Original version. C1459M-A 2/98 Revised to include usage with DFSS Series shortened back box. C1459M-B 2/03 Revised to include Spectra III SE and Spectra III back box models. Updated manual to new format.
デバイスPelco C1459M-B (2/03)の購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
Pelco C1459M-B (2/03)をまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはPelco C1459M-B (2/03)の技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。Pelco C1459M-B (2/03)の取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。Pelco C1459M-B (2/03)で得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
Pelco C1459M-B (2/03)を既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はPelco C1459M-B (2/03)の不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、Pelco C1459M-B (2/03)に関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちPelco C1459M-B (2/03)デバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。