PolarisメーカーTBM 200 LHの使用説明書/サービス説明書
ページ先へ移動 of 50
INSTALLATION, OPERATION AND MAINTENANCE MANU AL POLARIS - SERIES TBM 200 LH ( 8” ) - TYPE PHO / PBO / PVO 1of 29 DOCUMENT NBR. : PED-010 REVISION: 1 EFFECTIVE DATE: 08-24-2004 POLARIS SERIES TBM 200 LH ( 8" ) TYPE PHO / PBO / PVO ELECTRO-SUBMERSIBLE PUMP PUMP TYPE: TBM 200 LH ( 8" ) TYPE ( ) POLARIS PART NBR.
INSTALLATION, OPERATION AND MAINTENANCE MANU AL POLARIS - SERIES TBM 200 LH ( 8” ) - TYPE PHO / PBO / PVO 2of 29 DOCUMENT NBR. : PED-010 REVISION: 1 EFFECTIVE DATE: 08-24-2004 TABLE OF CONTENTS SECTION 1.0 INTRODUCTION SECTION 2.0 WARRANTIES SECTION 3.
INSTALLATION, OPERATION AND MAINTENANCE MANU AL POLARIS - SERIES TBM 200 LH ( 8” ) - TYPE PHO / PBO / PVO 3of 29 DOCUMENT NBR. : PED-010 REVISION: 1 EFFECTIVE DATE: 08-24-2004 SECTION 6.0 OPERATION 6.1 PRE START UP CHECK 6.2 PUMP START UP 6.3 PUMP SHUT DOWN 6.
INSTALLATION, OPERATION AND MAINTENANCE MANU AL POLARIS - SERIES TBM 200 LH ( 8” ) - TYPE PHO / PBO / PVO 4of 29 DOCUMENT NBR. : PED-010 REVISION: 1 EFFECTIVE DATE: 08-24-2004 1.0 INTRODUCTION Your new Series TBM pump has been designed and manufactur ed to perform for many years with a minimum of maintenance.
INSTALLATION, OPERATION AND MAINTENANCE MANU AL POLARIS - SERIES TBM 200 LH ( 8” ) - TYPE PHO / PBO / PVO 5of 29 DOCUMENT NBR. : PED-010 REVISION: 1 EFFECTIVE DATE: 08-24-2004 2.
INSTALLATION, OPERATION AND MAINTENANCE MANU AL POLARIS - SERIES TBM 200 LH ( 8” ) - TYPE PHO / PBO / PVO 6of 29 DOCUMENT NBR. : PED-010 REVISION: 1 EFFECTIVE DATE: 08-24-2004 3.0 SAFETY Do not install the equipment other than in accordance with the instructions contained in this manual.
INSTALLATION, OPERATION AND MAINTENANCE MANU AL POLARIS - SERIES TBM 200 LH ( 8” ) - TYPE PHO / PBO / PVO 7of 29 DOCUMENT NBR. : PED-010 REVISION: 1 EFFECTIVE DATE: 08-24-2004 4.
INSTALLATION, OPERATION AND MAINTENANCE MANU AL POLARIS - SERIES TBM 200 LH ( 8” ) - TYPE PHO / PBO / PVO 8of 29 DOCUMENT NBR. : PED-010 REVISION: 1 EFFECTIVE DATE: 08-24-2004 4.2.2 USED PUMP STORAGE A used pump should be completely disassembled and all parts cleaned and inspected.
INSTALLATION, OPERATION AND MAINTENANCE MANU AL POLARIS - SERIES TBM 200 LH ( 8” ) - TYPE PHO / PBO / PVO 9of 29 DOCUMENT NBR. : PED-010 REVISION: 1 EFFECTIVE DATE: 08-24-2004 4.
INSTALLATION, OPERATION AND MAINTENANCE MANU AL POLARIS - SERIES TBM 200 LH ( 8” ) - TYPE PHO / PBO / PVO 10of 29 DOCUMENT NBR. : PED-010 REVISION: 1 EFFECTIVE DATE: 08-24-2004 4.6.2 PRIMARY SEAL FLUSH The seal flush / cooling water to the out board mechanical seal is automatically supplied if the pump is running.
INSTALLATION, OPERATION AND MAINTENANCE MANU AL POLARIS - SERIES TBM 200 LH ( 8” ) - TYPE PHO / PBO / PVO 11of 29 DOCUMENT NBR. : PED-010 REVISION: 1 EFFECTIVE DATE: 08-24-2004 5.0 ELECTRICAL INSTALLATION 5.1 GENERAL Power supply and electrical work must be as per local and national codes.
INSTALLATION, OPERATION AND MAINTENANCE MANU AL POLARIS - SERIES TBM 200 LH ( 8” ) - TYPE PHO / PBO / PVO 12of 29 DOCUMENT NBR. : PED-010 REVISION: 1 EFFECTIVE DATE: 08-24-2004 6.0 OPERATION 6.1 PRE-START UP CHECK A pre-start up check should always be performed prior to putting your pump into service.
INSTALLATION, OPERATION AND MAINTENANCE MANU AL POLARIS - SERIES TBM 200 LH ( 8” ) - TYPE PHO / PBO / PVO 13of 29 DOCUMENT NBR. : PED-010 REVISION: 1 EFFECTIVE DATE: 08-24-2004 6.2 PUMP START UP Whenever possible, start the pump in clear liquid to pr ime discharge piping and/or hoses.
INSTALLATION, OPERATION AND MAINTENANCE MANU AL POLARIS - SERIES TBM 200 LH ( 8” ) - TYPE PHO / PBO / PVO 14of 29 DOCUMENT NBR. : PED-010 REVISION: 1 EFFECTIVE DATE: 08-24-2004 6.3 PUMP SHUT DOWN Never stop the pump while pumping solids through the system.
INSTALLATION, OPERATION AND MAINTENANCE MANU AL POLARIS - SERIES TBM 200 LH ( 8” ) - TYPE PHO / PBO / PVO 15of 29 DOCUMENT NBR. : PED-010 REVISION: 1 EFFECTIVE DATE: 08-24-2004 6.4 TROUBLE SHOOTING 6.4.1 FAULT TR ACING To carry out fault tracing on electrical equi pment, a multi-meter, test lamp and wiring diagram are required.
INSTALLATION, OPERATION AND MAINTENANCE MANU AL POLARIS - SERIES TBM 200 LH ( 8” ) - TYPE PHO / PBO / PVO 16of 29 DOCUMENT NBR. : PED-010 REVISION: 1 EFFECTIVE DATE: 08-24-2004 - FAULT SIGNAL AT THE STARTER, PUMP CAN BE STARTED MANUAL LY Check for faulty level-control system co mponents (start or high water sensors).
INSTALLATION, OPERATION AND MAINTENANCE MANU AL POLARIS - SERIES TBM 200 LH ( 8” ) - TYPE PHO / PBO / PVO 17of 29 DOCUMENT NBR. : PED-010 REVISION: 1 EFFECTIVE DATE: 08-24-2004 - PUMP IS EXPECTED TO.
INSTALLATION, OPERATION AND MAINTENANCE MANU AL POLARIS - SERIES TBM 200 LH ( 8” ) - TYPE PHO / PBO / PVO 18of 29 DOCUMENT NBR. : PED-010 REVISION: 1 EFFECTIVE DATE: 08-24-2004 - PUMP IS RUNNING WITH REDUCED FLOW This can be caused by either pump and / or system related problems.
INSTALLATION, OPERATION AND MAINTENANCE MANU AL POLARIS - SERIES TBM 200 LH ( 8” ) - TYPE PHO / PBO / PVO 19of 29 DOCUMENT NBR. : PED-010 REVISION: 1 EFFECTIVE DATE: 08-24-2004 7.0 WET END INSTALLATION Inspect and inventory all parts before y ou begin assembly.
INSTALLATION, OPERATION AND MAINTENANCE MANU AL POLARIS - SERIES TBM 200 LH ( 8” ) - TYPE PHO / PBO / PVO 20of 29 DOCUMENT NBR. : PED-010 REVISION: 1 EFFECTIVE DATE: 08-24-2004 7.1 TBM 200 LH - TYPE PHO Drawing A0207 and A0210 Apply "Never-Seize" to the mot or sha ft end.
.
ITEM ITEM ITEM PART NUMBER QTY. DESCRIPTION EXT. DESC.1 MODEL1 MODEL 2 WT.(KG) WT.(lbs) MTL. DWG. # 151 151.200.05.00240 1 KIT, WET END - BASIC TBM 200LH 375.57 826.37 101 101.012.05.00213 1 IMPELLER RH, 5V TBM 200LH PHO, PBO, PVO A532 CL III TP. A C0182 102 102.
INSTALLATION, OPERATION AND MAINTENANCE MANU AL POLARIS - SERIES TBM 200 LH ( 8” ) - TYPE PHO / PBO / PVO 23of 29 DOCUMENT NBR. : PED-010 REVISION: 1 EFFECTIVE DATE: 08-24-2004 7.2 TBM 200 LH - TYPE PBO Drawing A0208 and A0211 Apply "Never-Seize" to the mot or sha ft end.
.
ITEM ITEM ITEM PART NUMBER QTY. DESCRIPTION EXT. DESC.1 MODEL1 MODEL 2 WT.(KG) WT.(lbs) MTL. DWG. # 151 151.200.05.00240 1 KIT, WET END - BASIC TBM 200LH 375.57 826.37 101 101.012.05.00213 1 IMPELLER RH, 5V TBM 200LH PHO, PBO, PVO A532 CL III TP. A C0182 102 102.
INSTALLATION, OPERATION AND MAINTENANCE MANU AL POLARIS - SERIES TBM 200 LH ( 8” ) - TYPE PHO / PBO / PVO 26of 29 DOCUMENT NBR. : PED-010 REVISION: 1 EFFECTIVE DATE: 08-24-2004 7.3 TBM 200 LH - TYPE PVO Drawing A0209 and A0212 Apply "Never-Seize" to the mot or sha ft end.
.
ITEM ITEM ITEM PART NUMBER QTY. DESCRIPTION EXT. DESC.1 MODEL1 MODEL 2 WT.(KG) WT.(lbs) MTL. DWG. # 151 151.200.05.00240 1 KIT, WET END - BASIC TBM 200LH 375.57 826.37 101 101.012.05.00213 1 IMPELLER RH, 5V TBM 200LH PHO, PBO, PVO A532 CL III TP. A C0182 102 102.
INSTALLATION, OPERATION AND MAINTENANCE MANU AL POLARIS - SERIES TBM 200 LH ( 8” ) - TYPE PHO / PBO / PVO 29of 29 DOCUMENT NBR. : PED-010 REVISION: 1 EFFECTIVE DATE: 08-24-2004 8.0 APPENDIX 8.1 PUMP GENERAL ARRANGEMENT DRAWI NG, TBM 200 LH – PHO, PBO, PVO TBM 200 LH – 40 / 50 / 60 HP MOTOR TBM 200 LH – 75 / 100 / 125 HP MOTOR 8.
.
.
.
.
.
''#"*"&% %)*##*"&% % '(*"&% #"% . %$ # "% # % &#-'!) +*- )*( .
0 RECEIVING AND HANDLING 1 .................................................................... INST ALLA TION 2, 3 .........................................................................
RECEIVING AND HANDLING ACCEPT ANCE #*-*0"#'4 $).+ / /#$. ,0$+( )/ !*- +/$)" .#$+( )/ !-*( /# /-).+*-//$*) *(+)4 ! )4 *! /# "**. '' !*- $) /# $'' *! '$)" *- 3+- .
#&'$#+& &%)&!"(' & )"(#" # $)!$ '" !$ & '.
3 When removing impeller warm slightly with a torch and pry impeller off evenly with either small pry bars or a wheel puller . When the submersible pump motor leaves the factory it is ready for installation.
4 With proper application and installation of monitoring devices, periodic inspection of motor seals is not required.
5 CABLE CONNECTOR MOISTURE SENSORS (2) OUTER SEAL OUTER SNAP RING The cable connector assembly may be removed to reconnect the leads without negating the U/L listing or the warranty .
6 Thermostats are automatic reset for use in a normally closed circuit where the thermostat is connected in series with the holding coil of the magnetic starter . Thermostats provide Over T emperature Protection 2" in accordance with NEMA MG 1Ć12.
"& .'$, + * &'%"&$ .
8 Normally open load contacts close and normally closed load contacts open when the sensor probes detect the influx of moisture within the motor .
ST ANDARD REPLACEMENT SEAL CROS S REFERENCE PURCHASING SPECIFICATIONS Part No. 64262Ć a Crane T ype Seal T ype Seat Spring Code No. b c d e f g h k m 2 2 1- %.
#% " (( .
.
ENGINEERING STANDARD PROCE DURE IMPELLER INSTALLATION – TECH BULLETIN 1of 2 DOCUMENT NBR. : PED-016 REVISION: 1 EFFECTIVE DATE: 09-26-2003 0 NEW UJB 08-15-02 1 ADDED250LH UJB 09-26-03 REV ECN CHANGE DESCRIPTION BY APPV’D DATE 1.
ENGINEERING STANDARD PROCE DURE IMPELLER INSTALLATION – TECH BULLETIN 2of 2 DOCUMENT NBR. : PED-016 REVISION: 1 EFFECTIVE DATE: 09-26-2003 0 NEW UJB 08-15-02 1 ADDED250LH UJB 09-26-03 REV ECN CHANGE DESCRIPTION BY APPV’D DATE 2 2 . . 3 3 – – I I m m p p e e l l l l e e r r C C a a p p I I n n s s t t a a l l l l a a t t i i o o n n hreads.
ENGINEERING STANDARD PROCE DURE IMPELLER INSTALLATION – TECH BULLETIN 1of 1 DOCUMENT NBR. : PED-017 REVISION: 0 EFFECTIVE DATE: 09-16-2003 0 NEW UJB 08-15-02 1 ADDED250LH UJB 09-26-03 REV ECN CHANGE DESCRIPTION BY APPV’D DATE 1.
デバイスPolaris TBM 200 LHの購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
Polaris TBM 200 LHをまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはPolaris TBM 200 LHの技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。Polaris TBM 200 LHの取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。Polaris TBM 200 LHで得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
Polaris TBM 200 LHを既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はPolaris TBM 200 LHの不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、Polaris TBM 200 LHに関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちPolaris TBM 200 LHデバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。