RaypakメーカーHD101 THRU 2342Bの使用説明書/サービス説明書
ページ先へ移動 of 10
Models HD101 thru 2342B Models HD101 thru 2342B.
Raypak’ s Hi Delta Decades of expertise and technological innovations went into creating the Hi Delta boiler , a product that incorporates features sought after by engineers , installers and end-users alik e . In 1948, Raypak introduced the first straight copper finned tube boiler designed with reliability and serviceability in mind.
1. Lightweight Refractory P anels Multi-piece ceramic fiber panels enhance combus- tion while minimizing heat retention. 2. Fully-enclosed Headers T emperature sensors and lead wires/capillaries are protected from weather , vandalism, and accidental damage during installation and service .
4 98%High-efficiency Hi Delta with optional CHX condensing heating system Hi Delta with CHX achieves unequaled 98% thermal efficiency at full fire . It combines the reliability of the Hi Delta boiler with an optional CHX heat exchanger which pre- vents condensation in the heater’ s primary combustion chamber .
5 Simple Serviceability Raypak’ s easy-to-understand user interface , including on- board diagnostics and LED operating status lights , tells the technician all he needs to know . All service/repair components are readily accessible from the front for max- imum installation flexibility .
9 NO TE: 98% efficiency available with condensing heat exchanger . (See Specialty Models on pg. 4.) 84% EFFICIENCY (TYPE H) HD101 100 1020 510 340 255 204 170 146 128 113 102 93 85 78 73 68 HD151 150 .
PUMP - HO T WA TER SUPPL Y HD101 1/8 1.1 1/8 1.3 1/4 5.7 HD151 1/8 1.1 1/8 1.3 1/4 5.7 HD201 1/8 1.1 1/8 1.3 1/4 5.7 HD251 1/8 1.1 1/8 1.3 1/4 5.7 HD301 1/8 1.1 1/8 1.3 1/4 5.7 HD401 1/8 1.1 1/8 1.3 1/4 5.7 302B 1/8 1.3 1/4 5.7 1/2 7 402B 1/8 1.3 1/4 5.
7 ® SS SS POWER CALL FOR HEAT STAGE 1 STAGE 2 STAGE 3 SAFETY IGNITION FLOW BLOWER 1 BLOWER 2 ON STANDBY PROUDLY MADE IN AMERICA PROUDLY MADE IN AMERICA POWER CALL FOR HEAT STAGE 1 STAGE 2 SAFETY IGNI.
8 84% EFFICIENCY (TYPE H) HD101 13 0.7 13 44 8.8 4 17 1.2 HD151 13 0.7 20 44 8.8 6 25 2.9 13 0.7 HD201 13 3.3 26 44 8.9 8 33 5.2 17 1.3 HD251 13 0.7 33 44 9.2 10 44 9.2 21 2.1 14 0.9 HD301 13 0.7 39 44 9.4 12 25 3.1 17 1.3 13 0.7 HD401 17 1.4 40 44 9.
Notes: 1 Standard on on/off boilers (H4); Optional on all others 2 Standard on Models 302B and 402B; Optional on Models 502B-902B 3 Optional on Models 302B and 402B; Standard on Models 502B-902B 4 Sta.
デバイスRaypak HD101 THRU 2342Bの購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
Raypak HD101 THRU 2342Bをまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはRaypak HD101 THRU 2342Bの技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。Raypak HD101 THRU 2342Bの取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。Raypak HD101 THRU 2342Bで得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
Raypak HD101 THRU 2342Bを既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はRaypak HD101 THRU 2342Bの不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、Raypak HD101 THRU 2342Bに関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちRaypak HD101 THRU 2342Bデバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。