Vulcan-HartメーカーML-1の使用説明書/サービス説明書
ページ先へ移動 of 26
INSTALLATION & OPERATIONAL MANUAL 1GRBD & GRBDF SERIES GAS FRYERS With KleenScreen PLUS ® Filtration Systems M O D E L S : 1G4BD ML-136647 1G6BD ML-136648 1G8BD ML-136649 2G4BDF ML-136650 3G4.
GBD_GBDF SERIES GAS FRYERS VULCAN-HART F-329 34 Rev. B (June 2008 ) -2- IMPORTANT FOR YOUR SAFETY THIS MANUAL HAS BEEN PREPARED FOR PERSONNEL QUALIFIED TO INSTALL GAS EQUIPMENT, WHO SHOULD PERFORM THE INITIAL FIELD START-UP AND ADJUSTMENTS OF THE EQUIPMENT COVERED BY THIS MANUAL.
GBD_GBDF SERIES GAS FRYERS VULCAN-HART F-329 34 Rev. B (June 2008 ) -3- TABLE OF CONTENTS IMPORTANT FOR YOUR SAFETY……………………………… ……….
GBD_GBDF SERIES GAS FRYERS VULCAN-HART F-329 34 Rev. B (June 2008 ) -4- INTRODUCTION GENERAL Vulcan Fryers are produced wit h quality workmanship and mate rial. Proper installation, usage and maintenance will result in year s of satisfactory performance.
GBD_GBDF SERIES GAS FRYERS VULCAN-HART F-329 34 Rev. B (June 2008 ) -5- Check that the followi ng have been included: Crumb Rack(s) Basket Hanger(s) Tank Brush Adjustable Casters (4) two locking, two non- locking for freestanding fryers.
GBD_GBDF SERIES GAS FRYERS VULCAN-HART F-329 34 Rev. B (June 2008 ) -6- Clearances: Minimum clearance from combustible construction: 6” (15 cm) from the sides of the fryer 6” (15 cm) from t he back of the fryer The fryer may be installed on combustible floors.
GBD_GBDF SERIES GAS FRYERS VULCAN-HART F-329 34 Rev. B (June 2008 ) -7- National Electrical Code, ANSI/NFPA-70 (l atest edition). Copies may be obtained from The National Fire Protection Asso ciation, Batteryma rch Park, Quincy, MA.
GBD_GBDF SERIES GAS FRYERS VULCAN-HART F-329 34 Rev. B (June 2008 ) -8- GAS CONNECTION All gas supply connections and any pipe joint compound must be resist ant to the action of propane gases. The gas inlet is located on the lower rear of the fryer. Codes requ ire that a gas shutoff valve be installed in the gas line ahead of the fryer.
GBD_GBDF SERIES GAS FRYERS VULCAN-HART F-329 34 Rev. B (June 2008 ) -9- When installing a quick disconnect you must also install a means for limiting the movement of the fryer. This device will prevent the gas line or quick disconnect from being strained.
GBD_GBDF SERIES GAS FRYERS VULCAN-HART F-329 34 Rev. B (June 2008 ) -10- LEVELING THE FRYER Check the level of the fryer by placing a le vel on top of the fryer after gas connections have been made. Ensure that the fryer is level front-to-back and side-to-side in the final installed position.
GBD_GBDF SERIES GAS FRYERS VULCAN-HART F-329 34 Rev. B (June 2008 ) -11- FILLING TANK WITH SHORTENING Close the drain valve. Fill the fryer tank with s hortening. Vulcan recommends using liquid shortening. Shortening level should be between the MIN and MAX lines in the fryer tank.
GBD_GBDF SERIES GAS FRYERS VULCAN-HART F-329 34 Rev. B (June 2008 ) -12- Fry Basket Guidelines Do not overfill baskets. (See fry basket c apacity below) Carefully lower basket into oil. When frying doughnuts and fritters, turn product only once during frying.
GBD_GBDF SERIES GAS FRYERS VULCAN-HART F-329 34 Rev. B (June 2008 ) -13- Solid State Knob Control Temperature Knob Control Melt Switch Power Switch Filter Switch (for those models with Klee nScreen PLUS ® F i l t e r S y s t e m s ) Start Button TURNING ON THE FRYER Open the door to the fryer.
GBD_GBDF SERIES GAS FRYERS VULCAN-HART F-329 34 Rev. B (June 2008 ) -14- EXTENDED SHUTDOWN 1. Open the door to the fryer. Press the power switch to the OFF position. 2. Thoroughly drain the fryer. Refer to DRAINING THE FRYER. 3. Clean the fryer according to CLEANING.
GBD_GBDF SERIES GAS FRYERS VULCAN-HART F-329 34 Rev. B (June 2008 ) -15- DRAINING THE TANK 1. Open the door to the fryer. T he power must remain ON for t he fryer to filter correctly. 2. Insert the drain extension into t he drain valve. Tighten only hand tight.
GBD_GBDF SERIES GAS FRYERS VULCAN-HART F-329 34 Rev. B (June 2008 ) -16- 9. Drain the tank according to DRAINING THE TANK. Rinse thoroughly with clear, hot water. All traces of cleaner must be removed. Dry the tank thoroughly. 10. Close the drain valve and add shorteni ng.
GBD_GBDF SERIES GAS FRYERS VULCAN-HART F-329 34 Rev. B (June 2008 ) -17- KleenScreen Plus ® Filtration System Installation and Operational Manual for “BDF” Models 2 G 4 B D F S h o w n GAS KleenS.
GBD_GBDF SERIES GAS FRYERS VULCAN-HART F-329 34 Rev. B (June 2008 ) -18- Filtering Instructions for KleenScreen PLUS ® Fryers General The KleenScreen PLUS ® filtration system filters t he oil as it is pumped back into its’ respective tank(s). Only one tank can be dr ained and filtered at a time.
GBD_GBDF SERIES GAS FRYERS VULCAN-HART F-329 34 Rev. B (June 2008 ) -19- Fully assembled filter screen assembly: F i g . 2 Secure Tube with Suction Tube Clip Filter Screen Lays Flat On Bottom of Filter Pan Fig.
GBD_GBDF SERIES GAS FRYERS VULCAN-HART F-329 34 Rev. B (June 2008 ) -20- INSTRUCTIONS TO REMOVE & REPLACE KLEENSCREEN PLUS ® FILTER ENVELOPE FOR ABSOLUTE FILTRATION & MAXIMUM FLOW RA TE WE RECOMME ND YOU CHANGE YOUR FILTER ENVELOPES AT EVERY OIL CHANGE (10-14 DAYS DEPENDING ON OIL USAGE).
GBD_GBDF SERIES GAS FRYERS VULCAN-HART F-329 34 Rev. B (June 2008 ) -21- Operation Hot oil and parts can cause burns. Use care when operating, cleaning and servicing the fryer. Spilling hot frying compound can cause severe burns. Do not move fryer without draining all frying compound from the tank.
GBD_GBDF SERIES GAS FRYERS VULCAN-HART F-329 34 Rev. B (June 2008 ) -22- Quick Start Guide for Solid State Knob Controls: Start up in 4 Easy Steps: Step 1: Fill fry tank with oil and t hen turn on the power. Step 2: Set temperature knob to the desired set temperature.
GBD_GBDF SERIES GAS FRYERS VULCAN-HART F-329 34 Rev. B (June 2008 ) -23- Quick Start Guide for Solid State Kn ob Controls with KleenScreen PLUS ® Filtration: Filtering in 6 Easy Steps: Step 1: Make sure that the powe r is on. Do NOT turn off the power to the fryer.
GBD_GBDF SERIES GAS FRYERS VULCAN-HART F-329 34 Rev. B (June 2008 ) -24- FILTERING TIP: Open the filtering drawer approximately 1” to allow any oil in the re turn line to run back into the filter pan. This will take about 30 seconds to complete. Then open the drawer completely to clean filter components.
GBD_GBDF SERIES GAS FRYERS VULCAN-HART F-329 34 Rev. B (June 2008 ) -25- BOIL OUT PROCEDURE: Use the Boil Out By-Pass™ drai n extension allowing the boil out solution to exit the fry tank without using the filtering system. Do not allow water to run through the motor / pump.
GBD_GBDF SERIES GAS FRYERS VULCAN-HART F-329 34 Rev. B (June 2008 ) -26- MAINTENANCE Hot oil and hot parts can cause burns. Use care when operating, clean ing, and servicing the fryer. Spilling hot fryer com pound can cause severe burns. Do not move fryer without draining all frying compound from the tank.
デバイスVulcan-Hart ML-1の購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
Vulcan-Hart ML-1をまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはVulcan-Hart ML-1の技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。Vulcan-Hart ML-1の取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。Vulcan-Hart ML-1で得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
Vulcan-Hart ML-1を既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はVulcan-Hart ML-1の不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、Vulcan-Hart ML-1に関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちVulcan-Hart ML-1デバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。