Vulcan-HartメーカーML-136649の使用説明書/サービス説明書
ページ先へ移動 of 26
INSTALLATION & OPERATIONAL MANUAL 1GRA & GRAF SERIES GAS FRYERS VFRY18 & VFRY18F HDR FRYERS With KleenScreen PLUS ® Filtration Systems M O D E L S : 1GR45A ML-136647 1GR65A ML-136648 1GR8.
GRA, GRAF, & VFRY GAS FRYERS & VFRY SERIES HD FRYERS VULCAN-HART F-32 934 Rev. J (August 2012) -2- IMPORTANT FOR YOUR SAFETY THIS MANUAL HAS BEEN PREPARED FOR PERSONNEL QUALIFIED TO INSTALL GAS EQUIPMENT, WHO SHOULD PERFORM THE INITIAL FIELD START-UP AND ADJUSTMENTS OF THE EQUIPMENT COVERED BY THIS MANUAL.
GRA, GRAF, & VFRY GAS FRYERS & VFRY SERIES HD FRYERS VULCAN-HART F-32 934 Rev. J (August 2012) -3- TABLE OF CONTENTS IMPORTANT FOR YOUR SAFETY……………………………… ……….
GRA, GRAF, & VFRY GAS FRYERS & VFRY SERIES HD FRYERS VULCAN-HART F-32 934 Rev. J (August 2012) -4- INTRODUCTION GENERAL Vulcan Fryers are produced wit h quality workmanship and mate rial. Proper installation, usage and maintenance will result in year s of satisfactory performance.
GRA, GRAF, & VFRY GAS FRYERS & VFRY SERIES HD FRYERS VULCAN-HART F-32 934 Rev. J (August 2012) -5- Check that the followi ng have been included: Crumb Rack(s) Basket Hanger(s) Tank Brush Adjustable Casters (4) two locking, two non- locking for freestandi ng fryers.
GRA, GRAF, & VFRY GAS FRYERS & VFRY SERIES HD FRYERS VULCAN-HART F-32 934 Rev. J (August 2012) -6- Clearances: Minimum clearance from combusti ble construction: 6” (15 cm) from the sides of the fryer 6” (15 cm) from t he back of the fryer The fryer may be installed on combustible floors.
GRA, GRAF, & VFRY GAS FRYERS & VFRY SERIES HD FRYERS VULCAN-HART F-32 934 Rev. J (August 2012) -7- National Electrical Code, ANSI/NFPA-70 (latest edition). Copies may be obtained from The National Fire Protection Associ ation, Batterymarch Park, Quincy, MA.
GRA, GRAF, & VFRY GAS FRYERS & VFRY SER IES HD FRYERS VULCAN-H ART F-32 934 Rev. J (August 2012) -8- GAS CONNECTION All gas supply connections and any pipe joint compound must be resist ant to the action of propane gases. The gas inlet is located on the lower rear of the fryer.
GRA, GRAF, & VFRY GAS FRYERS & VFRY SER IES HD FRYERS VULCAN-H ART F-32 934 Rev. J (August 2012) -9- When installing a quick disconnect you must also install a means for limiting the movement of the fryer. This device wi ll prevent the gas line or quick disconnect from being strained.
GRA, GRAF, & VFRY GAS FRYERS & VFRY SER IES HD FRYERS VULCAN-H ART F-32 934 Rev. J (August 2012) -10- the National Electrical Code, ANSI/NFPA 70, or the Canadian Electrical Code, CSA C22.2, as applicable. Electrical diagram located on inside of door.
GRA, GRAF, & VFRY GAS FRYERS & VFRY SER IES HD FRYERS VULCAN-H ART F-32 934 Rev. J (August 2012) -11- Rinse fryer and accessories t horoughly and drain the fryer. Wipe tank completely dry with a soft, clean cloth. FILLING TANK WITH SHORTENING Close the drain valve.
GRA, GRAF, & VFRY GAS FRYERS & VFRY SERIES HD FRYERS VULCAN-HART F-32 934 Rev. J (August 2012) -12- Fry Basket Guidelines Do not overfill baskets. (See fry basket capacity below) Carefully lower basket into oil. When frying doughnuts and fritters, turn product only once during frying.
GRA, GRAF, & VFRY GAS FRYERS & VFRY SER IES HD FRYERS VULCAN-H ART F-32 934 Rev. J (August 2012) -13- Solid State Knob Control Indicator Lights (On/Start/Heating) Temperature Knob Control Melt.
GRA, GRAF, & VFRY GAS FRYERS & VFRY SER IES HD FRYERS VULCAN-H ART F-32 934 Rev. J (August 2012) -14-.
GRA, GRAF, & VFRY GAS FRYERS & VFRY SER IES HD FRYERS VULCAN-H ART F-32 934 Rev. J (August 2012) -15- EXTENDED SHUTDOWN 1. Open the door to the fryer. Press the power switch to the OFF position. 2. Thoroughly drain the fryer. Refer to DRAINING THE FRYER.
GRA, GRAF, & VFRY GAS FRYERS & VFRY SER IES HD FRYERS VULCAN-H ART F-32 934 Rev. J (August 2012) -16- DRAINING THE TANK 1. Open the door to the fryer. The power must remain ON for the fryer to filter correctly. 2. Insert the drain extension into t he drain valve.
GRA, GRAF, & VFRY GAS FRYERS & VFRY SER IES HD FRYERS VULCAN-H ART F-32 934 Rev. J (August 2012) -17- 10. Close the drain valve and add shorteni ng. Follow the FILLING TANK WITH SHORTENING procedure in this manual. The fryer is now ready for use.
GRA, GRAF, & VFRY GAS FRYERS & VFRY SER IES HD FRYERS VULCAN-H ART F-32 934 Rev. J (August 2012) -18- KleenScreen Plus ® Filtration System Installation and Operational Manual for “AF” Mod.
GRA, GRAF, & VFRY GAS FRYERS & VFRY SER IES HD FRYERS VULCAN-H ART F-32 934 Rev. J (August 2012) -19- Filtering Instructions for KleenScreen PLUS ® Fryers General The KleenScreen PLUS ® filtration system filters the oil as it is pumped back into its’ respective tank(s).
GRA, GRAF, & VFRY GAS FRYERS & VFRY SER IES HD FRYERS VULCAN-H ART F-32 934 Rev. J (August 2012) -20- Fully assembled filter screen assembly: F i g .
GRA, GRAF, & VFRY GAS FRYERS & VFRY SER IES HD FRYERS VULCAN-H ART F-32 934 Rev. J (August 2012) -21- INSTRUCTIONS TO REMOVE & REPLACE KLEENSCREE N PLUS ® FILTER ENVELOPE FOR ABSOLUTE FILTRATION & MAXIMUM FLOW RATE WE REC OMMEND YOU CHANGE YOUR FILTER ENVELOPES AT EVERY OIL CHANGE (10-14 D AYS DEPENDING ON OIL USAGE).
GRA, GRAF, & VFRY GAS FRYERS & VFRY SER IES HD FRYERS VULCAN-H ART F-32 934 Rev. J (August 2012) -22- Operation Hot oil and parts can cause burns. Use care when operating, cleaning and servicing the fryer. Spilling hot frying compound can cause severe burns.
GRA, GRAF, & VFRY GAS FRYERS & VFRY SER IES HD FRYERS VULCAN-H ART F-32 934 Rev. J (August 2012) -23-.
GRA, GRAF, & VFRY GAS FRYERS & VFRY SERIES HD FRYERS VULCAN-HART F-32 934 Rev. J (August 2012) -24- FILTERING TIP: Open the filtering drawer approximately 1” to allow any oil in the re turn line to run back into the filter pan. This will take about 30 seconds to complete.
GRA, GRAF, & VFRY GAS FRYERS & VFRY SER IES HD FRYERS VULCAN-H ART F-32 934 Rev. J (August 2012) -25- BOIL OUT PROCEDURE: Use the Boil Out By-Pass™ drai n extension allowing the boil out solution to exit the fry t ank without using the filtering system.
GRA, GRAF, & VFRY GAS FRYERS & VFRY SER IES HD FRYERS VULCAN-H ART F-32 934 Rev. J (August 2012) -26- MAINTENANCE Hot oil and hot parts can cause burns. Use care when operating, cleani ng, and servicing the fry er. Spilling hot fryer com pound can cause severe burns.
デバイスVulcan-Hart ML-136649の購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
Vulcan-Hart ML-136649をまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはVulcan-Hart ML-136649の技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。Vulcan-Hart ML-136649の取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。Vulcan-Hart ML-136649で得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
Vulcan-Hart ML-136649を既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はVulcan-Hart ML-136649の不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、Vulcan-Hart ML-136649に関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちVulcan-Hart ML-136649デバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。