Weil-McLainメーカーEGの使用説明書/サービス説明書
ページ先へ移動 of 28
P ar t No . 550-110-639/0703 Read all instructions before installing Installer Leave all instructions with boiler for future reference. Any claims for damage or shortage in shipment must be filed immediately against the transportation company by the consignee.
P art Number 550-110-639/0703 2 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL 1 Hazard definitions The following defined terms are used throughout this manual to bring attention to the presence of hazards of various risk levels, or to important information concerning the life of the product.
P art Number 550-110-639/0703 3 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL New construction or remodeled buildings are most often built tighter . W indows and door s ar e w eatherstripp ed, vapor barriers are used and openings in walls are caulked.
P art Number 550-110-639/0703 4 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL Chimney or vent requirements (also refer to Breaching erection, Page 8) V enting must be installed acco rding to P ar t 7, V enting of Equipment, of National Fuel Gas Code ANSI Z223.
P art Number 550-110-639/0703 5 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL Installation (continued) Installation clearances Suggested minimum clearances for servicing • 24 inches for cleaning and servicing, left side. • 18 inches for access to controls and components, front.
P art Number 550-110-639/0703 6 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL Installation (continued) 1 Figure 3 Hydrostatic pressure test Pressur e test before attaching gas piping or electrical supply . 1 . Plug any necessary boiler tappings or openings.
P art Number 550-110-639/0703 7 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL Installation (continued) 1 Installation of drawer assembly and front access panel and back base channel (Factory installed on PEG boilers - follow steps 2 and 3) 1 .
P art Number 550-110-639/0703 8 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL Installation (continued) 1 Spill switch installation On EG 30-75 boilers only , fasten spill sw it ch to draft hood as shown on page 22, Dr a w ing R ef .
P art Number 550-110-639/0703 9 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL P iping connections 2 Pipe before installing controls. Connect return piping after jacket is attached. Connect supply piping before or after jacket is attached.
P art Number 550-110-639/0703 10 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL P iping connections (continued) 2 Bypass piping BYP ASS PIPING IS NO T NORMALL Y REQUIRED ON ANY BASEBO ARD SYSTEM Bypass piping should be used for the following installations.
P art Number 550-110-639/0703 11 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL P iping connections (continued) 2 Figure 15 Recommended piping connections EGH steam boilers Figure 14 Recommended piping connections EG steam boilers Steam boilers 1 .
P art Number 550-110-639/0703 12 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL Install boiler controls 3 Failure to properly install, pipe and wire boiler controls may result in severe damage to the boiler , building and personnel.
P art Number 550-110-639/0703 13 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL EG and EGH boilers for tankless heater application are available only on special order as factory-installed optional equipment. Standard boilers cannot be adapted for heater use.
P art Number 550-110-639/0703 14 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL Gas piping 5 Connecting gas supply piping Size gas piping considering : a. Diameter and length of gas supplying piping. b. Number of fittings. c . Maximum gas consumption (including any possible future expansion).
P art Number 550-110-639/0703 15 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL Wiring 6 Refer to control supplement for additional information For y our safet y , turn off electrical power supply before making any electrical connections to avoid possible electrical shock hazard.
P art Number 550-110-639/0703 16 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL Final adjustments 7 Filling water systems 1 . Close manual air vents, drain cock, and automatic air vent, if used. 2 . Fill to correct system pressure.
P art Number 550-110-639/0703 17 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL Final adjustments (continued) 7 T o place in operation 1 . Be sure boiler has been co r rectly filled with water . 2. Follow lighting/operating inst ructions on boiler .
P art Number 550-110-639/0703 18 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL Check - out procedure 8 Check-out procedure Check-off steps as completed.
P art Number 550-110-639/0703 19 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL 9 Service REMO V AL OF COMBUSTION CHAMBER LINING OR BASE P ANELS The combustion chamber lining or base insulation panels in this product contain ceramic fiber materials.
P art Number 550-110-639/0703 20 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL Service (continued) 9 Also Refer to Additional Instructions Shipped With The Boiler For Specific Contr ol Operation and T r oubleshoot ing.
P art Number 550-110-639/0703 21 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL Check pilot burner flames 1 . Proper pilot flame a ) Blue flame. b ) Inner cone engulfing pilot flame se nsor . c) Pilot flame sensor glows cherry red.
P art Number 550-110-639/0703 22 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL The boiler contains ceramic fiber and fiberglass materials. Use care when handling these materials per instructions on page 19 of this manual. Failure to c omply could r esult in severe personal inju r y .
P art Number 550-110-639/0703 23 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL Replacement parts – EG (continued) 10 NOTE 1: Order sufficient quantities to replace all orifice.
P art Number 550-110-639/0703 24 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL The boiler contains ceramic fiber and fiberglass materials. Use care when handling these materials per instructions on page 19 of this manual. Failure to c omply could r esult in severe personal inju r y .
P art Number 550-110-639/0703 25 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL 10 Replacement parts – EGH (continued) NOTE 1 : Order sufficient quantities to replace all orifi.
P art Number 550-110-639/0703 26 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL 11 Data Dimensions EG Dimensions P-EG Dimensions EGH.
P art Number 550-110-639/0703 27 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL Notes: * Add pr efix “P” for package boiler c o mpletely assembl e d and wired with jacket and controls (PEG-30-S through PEG-55-S only).
P art Number 550-110-639/0703 28 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL Standard equipment Factory-Assembled Section Block Insulated Extended Jacket Draft Hood Aluminized.
デバイスWeil-McLain EGの購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
Weil-McLain EGをまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはWeil-McLain EGの技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。Weil-McLain EGの取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。Weil-McLain EGで得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
Weil-McLain EGを既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はWeil-McLain EGの不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、Weil-McLain EGに関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちWeil-McLain EGデバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。