Zenithメーカー36651の使用説明書/サービス説明書
ページ先へ移動 of 20
Domestic models 37671 Z enith HydroT ap BC60/85 37601 Z enith HydroT ap BF60 (Ambient) 37691 Z enith HydroT ap B60 37676 Z enith HydroT ap BCD60/85 37606 Z enith HydroT ap BFD60 (Ambient) 37696 Z enit.
Page 2 of 20 Z enith Hydro T ap Installation and Opera ting Instructions - 81467 - February 2005 Contents Read These Warnings First . . . . . . . . . . . . . . . . . . . . . . . . . .3 Models covered by these instructions . . . . . . . . . . . . . . .
Z enith Hydro T ap Installation and Opera ting Instructions - 81467 - February 2005 Page 3 of 20 Read These Warnings First Safety Do not allow young children, handica pped or infirm persons, to use the Z enith HydroT ap without super vision. Refrigerant The Z enith HydroT ap Chilling unit contains 134A refrigerant under pressure.
Page 4 of 20 Z enith Hydro T ap Installation and Opera ting Instructions - 81467 - February 2005 These Installation Instructions cover the entire Z enith HydroT ap range.
Z enith Hydro T ap Installation and Opera ting Instructions - 81467 - February 2005 Page 5 of 20 In addition to normal tools, the following will be required: • 38mm diameter sheet metal hole punch for sink tops. (not supplied) • 38mm diameter hole saw for timber bench tops.
Page 6 of 20 Z enith Hydro T ap Installation and Opera ting Instructions - 81467 - February 2005 Installation procedure continued Vent line Chilled line Hot line Front Vent Hot Outlet Step B - Installing the undersink unit (all models) SPECIAL NOTE: The HydroT ap undersink units are heavy , take note of the weights listed in the table on page 4.
Z enith Hydro T ap Installation and Opera ting Instructions - 81467 - February 2005 Page 7 of 20 Step D - Connecting the water supply (all models) T o prevent sediment from entering the Z enith HydroT ap at connection, flush water through the supply line thoroughly before connection to the Z enith HydroT ap.
Page 8 0f 20 Z enith Hydro T ap Installation and Opera ting Instructions - 81467 - February 2005 LARGE HOLE 1. Position the Font template (provided) on the bench area. Ensure the position you select is within the length of the supply tube and USB cable fixed to the T ap Head Assembly .
Z enith Hydro T ap Installation and Opera ting Instructions - 81467 - February 2005 Page 9 of 20 Operating the T ap Blue Chilled Water Light On all the time: This indicates that the chilled water temperature is within the usable range. Flashing slowly : This indicates that the chilled wa ter is not at the right tempera ture.
Page 10 of 20 Z enith Hydro T a p Installation and Operating Instructions - 81467 - February 2005 Cleaning Do not use strong, corrosive, spray or abrasive cleaners. Clean with a soft cloth or brush and mild soap and water . Do not spray water over the tap as it may dama ge the low-volta ge electronics.
Z enith Hydro T ap Installation and Opera ting Instructions - 81467 - February 2005 Page 11 of 20 Setting the Energy Saver Timer (products with this feature only) Normal Operation (not available on HT boiling only series) Set Time T o change time, press either Mode ∧ or Mode ∨ button until Set Time is on the display screen.
Page 12 of 20 Z enith Hydro T a p Installation and Operating Instructions - 81467 - February 2005 Auxiliary F an Attachment (excluding HT boiling only models) Auxiliary fan connection Cold water conne.
Z enith Hydro T ap Installation and Opera ting Instructions - 81467 - February 2005 Page 1 3 of 20 Symptom Possible Cause Solution No LED display , no tap head lights or , no water when ta p levers are operated. No water flow. Slow water recover y after use.
Page 1 4 of 2 0 Z enith Hydro T a p Installation and Operating Instructions - 81467 - February 2005 Exploded V iew Chiller Module and Spare P arts Item Kit No.
Z enith Hydro T ap Installation and Opera ting Instructions - 81467 - February 2005 Page 1 5 of 2 0 Exploded V iew Boiler Module and Spare P arts Item Kit No.
Page 16 of 2 0 Z enith Hydro T a p Installation and Operating Instructions - 81467 - February 2005 Exploded V iew HT Series Boiling Only and Spare P arts ITEM KIT NO.
Z enith Hydro T ap Installation and Opera ting Instructions - 81467 - February 2005 Page 17 of 2 0 Notes.
Page 18 of 2 0 Z enith Hydro T a p Installation and Operating Instructions - 81467 - February 2005 Notes.
Z enith Hydro T ap Installation and Opera ting Instructions - 81467 - February 2005 Page 19 of 2 0 Notes.
Z enith Hydrotap - Installation & Operating Instructions - 81438 - June 2004 Page 20 of 20 Head Office Parex Appliances 103 Central Park Dr Henderson Auckland Email: info@parex.
デバイスZenith 36651の購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
Zenith 36651をまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはZenith 36651の技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。Zenith 36651の取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。Zenith 36651で得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
Zenith 36651を既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はZenith 36651の不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、Zenith 36651に関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちZenith 36651デバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。